Deck 12: Systems Analysis and Design

ملء الشاشة (f)
exit full mode
سؤال
This selection is the first step in implementing a new system.

A)Hardware requirements
B)Software requirements
C)Conversion type
D)Best alternative
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
This individual studies an organization's systems to determine what actions to take and how to use computer technology to assist them.

A)Network administrator
B)Cryptographer
C)Systems analyst
D)Computer engineer
سؤال
Which of the following tools presents data or information flow within an information system?

A)Grid chart
B)Decision table
C)Automated design tool
D)Data flow diagram
سؤال
Which among the following would not be described in the systems analysis report?

A)The current information system
B)The requirements for a new system
C)The possible development schedule
D)The training requirements for users
سؤال
This shows the relationship between input and output documents.

A)Grid chart
B)Checklist
C)Investigation report
D)Decision table
سؤال
This document presents the costs versus the benefits and outlines the effect of alternative designs on the organization.

A)Systems analysis report
B)Preliminary investigation report
C)Initialization report
D)Systems design report
سؤال
Which of the following is used to show the decision rules that apply when certain conditions occur?

A)System flowchart
B)Decision table
C)Grid chart
D)Checklist
سؤال
In this phase of the systems life cycle, new or alternative information systems are designed.

A)Systems maintenance
B)Systems analysis
C)Systems design
D)Systems development
سؤال
A collection of activities and elements organized to accomplish a goal.

A)Information
B)Data
C)Program
D)System
سؤال
In this activity, it is determined whether the system can be made secure against unauthorized use.

A)Analyzing the data
B)Writing the systems design report
C)Selecting the best system
D)Testing the system
سؤال
These tools, also called computer-aided software engineering (CASE) tools, are used in systems analysis to evaluate alternative hardware and software solutions.

A)Project management tools
B)Automated design tools
C)Spreadsheets
D)Report generators
سؤال
This conversion approach is preferred when there are many people in an organization performing similar operations.

A)Direct approach
B)Parallel approach
C)Phased approach
D)Pilot approach
سؤال
This is the first step in the systems design phase.

A)Examine hardware requirements
B)Design alternative systems
C)Select the best system
D)Analyze the data
سؤال
In this phase of the systems life cycle, the new information system is installed, and people are trained to use it.

A)Systems implementation
B)Systems analysis
C)Systems design
D)Systems development
سؤال
In the preliminary investigation phase of the systems life cycle, which one of the following tasks would not be included?

A)Briefly defining the problem
B)Suggesting alternative solutions
C)Gathering the data
D)Preparing a short report
سؤال
This conversion type is not recommended because problems arising in this approach would be disastrous.

A)Direct approach
B)Parallel approach
C)Phased approach
D)Pilot approach
سؤال
In order to obtain financing to continue to Phase 2: Systems Analysis, the systems analyst does this.

A)Prepares a preliminary investigation report
B)Gathers data
C)Analyzes data
D)Trains users on the new system
سؤال
Gathering and analyzing data is part of this phase.

A)Preliminary investigation
B)Systems analysis
C)Systems design
D)Systems implementation
سؤال
During which phase of the systems life cycle are users trained to use the new system?

A)Preliminary investigation
B)Systems implementation
C)Systems development
D)Systems maintenance
سؤال
This is the final task in Phase 3: Systems Design.

A)Select the best design
B)Design alternative systems
C)Write a systems design report
D)Examine hardware requirements
سؤال
This is the final step of the systems implementation phase of the systems life cycle.

A)Develop documentation
B)Train users
C)Select the conversion type
D)Write the implementation report
سؤال
This is performed to determine whether the new procedures are actually furthering productivity.

A)Testing
B)Systems inventory
C)Designing alternatives
D)Systems audit
سؤال
Which of the following phases of the systems life cycle is considered to be an ongoing activity?

A)Systems development
B)Systems analysis
C)Systems design
D)Systems maintenance
سؤال
CASE tools are limited to systems analysis.
سؤال
Selecting the best system is the first step of the systems design phase of the systems life cycle.
سؤال
Gathering data and information in the systems analysis phase can be achieved through conducting interviews and studying documents.
سؤال
An organization chart shows where the hardware is located within the organization.
سؤال
Identify the sixth phase of the systems life cycle.

A)Systems maintenance
B)Systems development
C)Systems design
D)Systems analysis
سؤال
This is the process of building a model that can be modified before the actual system is installed.

A)Rapid applications development
B)Prototyping
C)Systems analysis
D)Systems maintenance
سؤال
In the systems design phase of the systems life cycle, the systems design report usually concludes by proposing one of the analyzed alternatives.
سؤال
In the data analysis step, the idea is to learn how information currently flows and to pinpoint why it isn't flowing properly.
سؤال
If a firm is deciding upon the acceptance of a project with a value of $10,000, and if the client has a good credit history, the firm will most likely use the grid chart in the decision making process.
سؤال
Data about how the present system works is collected during the preliminary investigation phase in order to determine the requirements of the new system.
سؤال
Not enough tools are available to assist systems analysts and the end users in analyzing data.
سؤال
In phase 2 of the systems life cycle, the primary concern is completing a new design.
سؤال
CASE stands for "Computer-Aided Software Engineering".
سؤال
The top-down analysis method makes each component easier to analyze and deal with.
سؤال
A survey of user needs is part of the preliminary investigation phase.
سؤال
In the design phase of the systems life cycle, alternative systems are analyzed for economic, physical, and operational feasibility.
سؤال
A systems analyst uses the six-phase systems life cycle to improve and maintain information systems.
سؤال
New hardware and software are acquired, developed, and tested in the systems _____ stage of the systems life cycle.
سؤال
Systems designers evaluate each alternative in the systems design phase for _____ by looking at economic, technical, and operational factors.
سؤال
The organization can switch to the old system if the new system fails in the parallel conversion approach.
سؤال
_____ feasibility is evaluated to determine if the proposed system can actually be made to operate in the organization.
سؤال
Periodic evaluation is part of the systems maintenance phase of the systems life cycle.
سؤال
A(n) _____ shows the decision rules that apply when certain conditions occur.
سؤال
In the testing phase of the systems life cycle, processed information is evaluated to see whether the results are correct.
سؤال
Systems analysis and design is a problem-solving procedure for examining and improving a(n) _____.
سؤال
An important aspect of the preliminary investigation phase is to suggest _____.
سؤال
The _____ analysis method identifies the top-level components of a complex system.
سؤال
When evaluating alternative systems, systems designs must consider economic feasibility, _____ feasibility, and operational feasibility.
سؤال
The third phase in the systems life cycle is the systems _____ phase.
سؤال
_____ of the system happens after the installation of software and hardware.
سؤال
The _____ report describes the possible development schedule.
سؤال
System _____ show the flow of data from input to processing and finally to output.
سؤال
Hardware and software are normally acquired during the implementation phase of the systems life cycle.
سؤال
A(n) _____ is a collection of hardware, software, people, procedures, and data.
سؤال
The systems design report presents the _____ versus the benefits.
سؤال
A(n) _____ shows the relationship between input and output documents.
سؤال
Application software for new information systems always requires having it custom-designed to meet the needs of the organization.
سؤال
The _____ approach to systems implementation is used only in cases in which the cost of failure or of interrupted operation is great.
سؤال
The _____ conversion approach to systems implementation is considered the most risky.
سؤال
In general, the pilot and _____ approaches are the most favored conversion approaches.
سؤال
How does a systems analyst gather the required data when he/she is defining a problem during the preliminary investigation phase?
سؤال
Most organizations spend more time and money on the systems _____ phase than on any of other phase.
سؤال
Another name for Phase 5, systems implementation, is _____.
سؤال
Briefly describe the four approaches to conversion to a new system.
سؤال
What is prototyping?
سؤال
Describe how software can be acquired, if needed, during the systems development phase.
سؤال
Discuss the systems audit and periodic evaluation activities.
سؤال
Name and briefly explain five common analysis tools used during the systems analysis phase.
سؤال
Name and briefly explain the six phases of systems analysis and design.
سؤال
What is the purpose of the systems analysis report during the systems analysis phase?
سؤال
What are the four questions that must be considered when choosing the best system during the systems design phase?
سؤال
Explain the process of evaluating the feasibility of each alternative system.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/75
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Systems Analysis and Design
1
This selection is the first step in implementing a new system.

A)Hardware requirements
B)Software requirements
C)Conversion type
D)Best alternative
C
2
This individual studies an organization's systems to determine what actions to take and how to use computer technology to assist them.

A)Network administrator
B)Cryptographer
C)Systems analyst
D)Computer engineer
C
3
Which of the following tools presents data or information flow within an information system?

A)Grid chart
B)Decision table
C)Automated design tool
D)Data flow diagram
D
4
Which among the following would not be described in the systems analysis report?

A)The current information system
B)The requirements for a new system
C)The possible development schedule
D)The training requirements for users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
5
This shows the relationship between input and output documents.

A)Grid chart
B)Checklist
C)Investigation report
D)Decision table
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
6
This document presents the costs versus the benefits and outlines the effect of alternative designs on the organization.

A)Systems analysis report
B)Preliminary investigation report
C)Initialization report
D)Systems design report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following is used to show the decision rules that apply when certain conditions occur?

A)System flowchart
B)Decision table
C)Grid chart
D)Checklist
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
8
In this phase of the systems life cycle, new or alternative information systems are designed.

A)Systems maintenance
B)Systems analysis
C)Systems design
D)Systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
9
A collection of activities and elements organized to accomplish a goal.

A)Information
B)Data
C)Program
D)System
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
10
In this activity, it is determined whether the system can be made secure against unauthorized use.

A)Analyzing the data
B)Writing the systems design report
C)Selecting the best system
D)Testing the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
11
These tools, also called computer-aided software engineering (CASE) tools, are used in systems analysis to evaluate alternative hardware and software solutions.

A)Project management tools
B)Automated design tools
C)Spreadsheets
D)Report generators
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
12
This conversion approach is preferred when there are many people in an organization performing similar operations.

A)Direct approach
B)Parallel approach
C)Phased approach
D)Pilot approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
13
This is the first step in the systems design phase.

A)Examine hardware requirements
B)Design alternative systems
C)Select the best system
D)Analyze the data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
14
In this phase of the systems life cycle, the new information system is installed, and people are trained to use it.

A)Systems implementation
B)Systems analysis
C)Systems design
D)Systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
15
In the preliminary investigation phase of the systems life cycle, which one of the following tasks would not be included?

A)Briefly defining the problem
B)Suggesting alternative solutions
C)Gathering the data
D)Preparing a short report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
16
This conversion type is not recommended because problems arising in this approach would be disastrous.

A)Direct approach
B)Parallel approach
C)Phased approach
D)Pilot approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
17
In order to obtain financing to continue to Phase 2: Systems Analysis, the systems analyst does this.

A)Prepares a preliminary investigation report
B)Gathers data
C)Analyzes data
D)Trains users on the new system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
18
Gathering and analyzing data is part of this phase.

A)Preliminary investigation
B)Systems analysis
C)Systems design
D)Systems implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
19
During which phase of the systems life cycle are users trained to use the new system?

A)Preliminary investigation
B)Systems implementation
C)Systems development
D)Systems maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
20
This is the final task in Phase 3: Systems Design.

A)Select the best design
B)Design alternative systems
C)Write a systems design report
D)Examine hardware requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
21
This is the final step of the systems implementation phase of the systems life cycle.

A)Develop documentation
B)Train users
C)Select the conversion type
D)Write the implementation report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
22
This is performed to determine whether the new procedures are actually furthering productivity.

A)Testing
B)Systems inventory
C)Designing alternatives
D)Systems audit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following phases of the systems life cycle is considered to be an ongoing activity?

A)Systems development
B)Systems analysis
C)Systems design
D)Systems maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
24
CASE tools are limited to systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
25
Selecting the best system is the first step of the systems design phase of the systems life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
26
Gathering data and information in the systems analysis phase can be achieved through conducting interviews and studying documents.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
27
An organization chart shows where the hardware is located within the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
28
Identify the sixth phase of the systems life cycle.

A)Systems maintenance
B)Systems development
C)Systems design
D)Systems analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
29
This is the process of building a model that can be modified before the actual system is installed.

A)Rapid applications development
B)Prototyping
C)Systems analysis
D)Systems maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
30
In the systems design phase of the systems life cycle, the systems design report usually concludes by proposing one of the analyzed alternatives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
31
In the data analysis step, the idea is to learn how information currently flows and to pinpoint why it isn't flowing properly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
32
If a firm is deciding upon the acceptance of a project with a value of $10,000, and if the client has a good credit history, the firm will most likely use the grid chart in the decision making process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
33
Data about how the present system works is collected during the preliminary investigation phase in order to determine the requirements of the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
34
Not enough tools are available to assist systems analysts and the end users in analyzing data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
35
In phase 2 of the systems life cycle, the primary concern is completing a new design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
36
CASE stands for "Computer-Aided Software Engineering".
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
37
The top-down analysis method makes each component easier to analyze and deal with.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
38
A survey of user needs is part of the preliminary investigation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
39
In the design phase of the systems life cycle, alternative systems are analyzed for economic, physical, and operational feasibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
40
A systems analyst uses the six-phase systems life cycle to improve and maintain information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
41
New hardware and software are acquired, developed, and tested in the systems _____ stage of the systems life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
42
Systems designers evaluate each alternative in the systems design phase for _____ by looking at economic, technical, and operational factors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
43
The organization can switch to the old system if the new system fails in the parallel conversion approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
44
_____ feasibility is evaluated to determine if the proposed system can actually be made to operate in the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
45
Periodic evaluation is part of the systems maintenance phase of the systems life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
46
A(n) _____ shows the decision rules that apply when certain conditions occur.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
47
In the testing phase of the systems life cycle, processed information is evaluated to see whether the results are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
48
Systems analysis and design is a problem-solving procedure for examining and improving a(n) _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
49
An important aspect of the preliminary investigation phase is to suggest _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
50
The _____ analysis method identifies the top-level components of a complex system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
51
When evaluating alternative systems, systems designs must consider economic feasibility, _____ feasibility, and operational feasibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
52
The third phase in the systems life cycle is the systems _____ phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
53
_____ of the system happens after the installation of software and hardware.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
54
The _____ report describes the possible development schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
55
System _____ show the flow of data from input to processing and finally to output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
56
Hardware and software are normally acquired during the implementation phase of the systems life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
57
A(n) _____ is a collection of hardware, software, people, procedures, and data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
58
The systems design report presents the _____ versus the benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
59
A(n) _____ shows the relationship between input and output documents.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
60
Application software for new information systems always requires having it custom-designed to meet the needs of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
61
The _____ approach to systems implementation is used only in cases in which the cost of failure or of interrupted operation is great.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
62
The _____ conversion approach to systems implementation is considered the most risky.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
63
In general, the pilot and _____ approaches are the most favored conversion approaches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
64
How does a systems analyst gather the required data when he/she is defining a problem during the preliminary investigation phase?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
65
Most organizations spend more time and money on the systems _____ phase than on any of other phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
66
Another name for Phase 5, systems implementation, is _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
67
Briefly describe the four approaches to conversion to a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
68
What is prototyping?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
69
Describe how software can be acquired, if needed, during the systems development phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
70
Discuss the systems audit and periodic evaluation activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
71
Name and briefly explain five common analysis tools used during the systems analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
72
Name and briefly explain the six phases of systems analysis and design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
73
What is the purpose of the systems analysis report during the systems analysis phase?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
74
What are the four questions that must be considered when choosing the best system during the systems design phase?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
75
Explain the process of evaluating the feasibility of each alternative system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.