Deck 12: Information Systems Development

ملء الشاشة (f)
exit full mode
سؤال
In business process management (BPM), an as-is model ________.

A)documents the existing business process
B)contrasts the former and current states of a business process
C)represents the desired state of a business process
D)represents the ideal state of a business process
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
________ play a key role in moving development projects through the SDLC or scrum development process.

A)Business analysts
B)Programmers
C)Systems analysts
D)Database designers
سؤال
________ are information system (IS)professionals who understand both business and information technology.

A)Development analysts
B)Systems analysts
C)Network administrators
D)Database designers
سؤال
The activities in a business process often involve information systems.
سؤال
Which of the following is true of scrum?

A)It was developed to overcome the problems that occur when using the Business Process Modeling Notation (BPMN).
B)It does not adapt to change easily.
C)It is generic enough to be used for the development of business processes, information systems, and applications.
D)Its work periods are usually three months or longer.
سؤال
Not all information systems have applications or software components.
سؤال
Tranware Inc., an apparel manufacturer, receives cotton and other raw materials from its suppliers at the beginning of every quarter. With reference to this information, Tranware receives its ________ at the beginning of every quarter.

A)deliverables
B)physical repository
C)data repository
D)resources
سؤال
A ________ is a network of activities, repositories, roles, resources, and flows that interact to accomplish a business function.

A)business stature
B)business analysis
C)business process
D)business policy
سؤال
A ________ is a person who is well versed in an organization's strategy and focuses on ensuring that business processes and information systems meet the organization's competitive strategies.

A)business analyst
B)business application programmer
C)business administrator
D)business supervisor
سؤال
Which of the following statements is true about the relationship between business processes and information systems?

A)A business process need not relate to any information system, but an information system relates to at least one business process.
B)Information systems incorporate all business process activities and hence, should be developed before business processes.
C)The relationship between business processes and information systems is one-to-one.
D)Developing information systems before business processes ensures that all activities are considered in the development process.
سؤال
Describe the composition of a development team for an information system (IS).
سؤال
The actors or participants in a business process are the users of information systems.
سؤال
Which of the following are the steps in the business process management (BPM)cycle?

A)model processes; implement processes; assess results; create components
B)create components; model processes; implement processes; assess results
C)implement processes; create components; model processes; assess results
D)model processes; create components; implement processes; assess results
سؤال
Which of the following statements is true of information systems?

A)Information systems include all business process activities.
B)Every information system has at least one application.
C)Information systems should be bought entirely off-the-shelf.
D)Every business process should include at least one information system.
سؤال
In a business process, ________ are defined as collections of related tasks that receive inputs and produce outputs.

A)activities
B)databases
C)resources
D)presentations
سؤال
Business processes, information systems, and applications have the same characteristics and components.
سؤال
Information systems and business processes are synonymous terms.
سؤال
In business process management (BPM), once the as-is model is created, the very next step that a team must take is to ________.

A)obtain feedback about implementation
B)assess the results of the changes
C)look for improvement opportunities
D)implement changes in the organization
سؤال
In a business process, a role refers to ________.

A)a physical repository
B)the movement of data
C)a collection of data
D)a collection of activities
سؤال
In a business process, resources are ________.

A)people or computer applications that are assigned to roles
B)collections of procedures and activities
C)the total number of points of work that can be accomplished in each scrum period
D)collections of related tasks that receive inputs and produce outputs
سؤال
Control Objectives for Information and related Technology (COBIT)is often used in the ________ stage of the business process management (BPM)cycle.

A)component creation
B)implementation
C)assessment
D)process modeling
سؤال
________ is a standard set of terms and graphical notations for documenting business processes.

A)Business Process Modeling Notation (BPMN)
B)Business Process Execution Language (BPEL)
C)Component Object Model (COM)
D)International Organization for Standardization (ISO)9000
سؤال
Implementing the new or changed process is the third activity in business process management.
سؤال
Dimensions of process quality are effectiveness and efficiency.
سؤال
Explain why process management is necessary for an organization.
سؤال
An as-is model documents the desired outcome of a business process.
سؤال
In a business process, only a single resource is assigned to a role.
سؤال
Melissa is in charge of creating a Business Process Modeling Notation (BPMN)diagram for the procurement department. The diagram will represent the separate paths to be followed for an old supplier and a new supplier. Which of the following shapes should Melissa use to represent the question "old supplier?" which can be answered with a yes or no as applicable?

A)diamonds
B)circles
C)rectangles
D)squares
سؤال
An inventory is an example of a data repository.
سؤال
In a business process, roles are collections of activities.
سؤال
Name the stages of the business process management cycle and summarize the activities in each.
سؤال
In a Business Process Modeling Notation (BPMN)diagram, ________ depict the flow or sequence of activities in a process.

A)dotted arrows
B)diamonds
C)solid arrows
D)circles
سؤال
Which of the following statements is true of the swim-lane layout used for modeling business processes?

A)It complicates the process diagrams.
B)It draws attention to the interactions among components of the diagram.
C)Each role in the business process has to share the swim-lane with other roles.
D)All activities for a given role are repeated in all the swim-lanes.
سؤال
Which of the following can be represented using the Business Process Modeling Notation (BPMN)?

A)Gantt charts
B)as-is models
C)scatter plots
D)PERT charts showing the critical path
سؤال
________ set the stage for the requirements for any information systems and applications that need to be created or adapted.

A)Business repositories
B)Business policies
C)Business reports
D)Business process models
سؤال
Define business process, roles, resources, and data flows.
سؤال
In a Business Process Modeling Notation (BPMN)diagram, dotted arrows depict the flow of ________ in the process.

A)resources
B)messages and data
C)tasks and activities
D)control
سؤال
The business process management cycle begins by creating a model of the existing business processes.
سؤال
Ryan is creating a Business Process Modeling Notation (BPMN)diagram for the manufacturing process of his organization. Which of the following should he use to represent the check inventory activity?

A)a dotted arrow
B)a rectangle
C)a diamond
D)a solid arrow
سؤال
Business process management applies only to commercial, profit-making organizations.
سؤال
During the requirements definition stage of developing an information system, the project team will consist mostly of ________.

A)finance and account managers
B)test engineers and business users
C)business and systems analysts
D)database designers and administrators
سؤال
In Business Process Modeling Notation (BPMN), solid arrows depict the flow of messages and data.
سؤال
The ________ phase of the systems development life cycle (SDLC)involves determining hardware and program specifications, designing the database and procedures, and creating job definitions.

A)requirements analysis
B)system implementation
C)component design
D)system definition
سؤال
The first step in the system definition phase of the systems development life cycle (SDLC)is to ________.

A)plan the project
B)conduct a feasibility study
C)define the goals and scope
D)form the project team
سؤال
The final phase of the systems development life cycle (SDLC)is ________.

A)implementing the system
B)determining the requirements
C)maintaining the system
D)designing system components
سؤال
Once the as-is model has been documented, that model can then be analyzed for problems or for improvement opportunities.
سؤال
The traditional process for developing information systems is ________.

A)the software testing life cycle
B)the systems development life cycle
C)the software defect life cycle
D)product life cycle
سؤال
The first phase of the systems development life cycle (SDLC)is ________.

A)defining the system
B)implementing the system
C)determining the requirements
D)maintaining the system
سؤال
In the swim-lane layout for modeling business processes, each role is given its own swim lane.
سؤال
Which of the following are the dimensions of feasibility?

A)planning, process, technical, and schedule feasibility
B)operational, strategic, technical, and tactical feasibility
C)cost, schedule, technical, and organizational feasibility
D)schedule, process, technical, and competitive feasibility
سؤال
ACES is a quality auditing firm. It has dedicated a team of managers, business analysts, and system analysts to develop an information system that receives data and produces quarterly reports that grade companies on their quality rating. The team is using the five-phase systems development life cycle (SDLC)to develop this information system. During which of the following phases will the team identify what kind of reports need to be produced and how frequently?

A)requirements analysis
B)system implementation
C)component design
D)system definition
سؤال
A(n)________ is a formal description of a system's response to use and misuse scenarios.

A)activity log
B)work breakdown structure
C)test plan
D)defect report
سؤال
The project plan which results from defining the system is the input to ________, which is the second phase of the SDLC.

A)system design
B)requirement collection
C)requirements analysis
D)system maintenance
سؤال
What are the types of arrows used in the swim-lane layout of Business Process Modeling Notation (BPMN)?
سؤال
Once the project's goals and scope have been defined, the next step in the system definition phase of the systems development life cycle (SDLC)is to ________.

A)plan the project
B)assess feasibility
C)determine system requirements
D)form a project team
سؤال
Tasks in the ________ phase of the systems development life cycle (SDLC)are to build and test system components, and to convert users to the new system.

A)system definition
B)component design
C)system maintenance
D)system implementation
سؤال
If a defined project is determined to be feasible in the systems development life cycle (SDLC), the next step is to ________.

A)create and test components
B)form the project team
C)maintain the system
D)assess process results
سؤال
In Business Process Modeling Notation (BPMN)diagrams, a square with a plus sign means that ________.

A)a question can be answered with no
B)it is the end of the process
C)a question can be answered with yes
D)an activity is considered to be a subprocess of a process
سؤال
Dentoin Pharmaceuticals requires an information system to support its new assembly line. The management has assigned a team of ten members to plan this project. Which of the following will be the first major task for this team?

A)designing the system components
B)assessing the project's feasibility
C)planning the project
D)defining the system goals and scope
سؤال
Organizational feasibility concerns ________.

A)the organization's budget and schedule requirements
B)the competitor's business process model
C)whether the organization has the technical infrastructure to implement the new system
D)whether the new system fits within the organization's customs or legal requirements
سؤال
What are the phases of the systems development life cycle (SDLC)?
سؤال
Define technical feasibility and organizational feasibility.
سؤال
In the context of system implementation phase of the systems development life cycle (SDLC), a ________ installation is the riskiest because the old system is shut down and the new system is introduced.

A)pilot
B)phased
C)parallel
D)plunge
سؤال
The systems development life cycle is the traditional process used to develop information systems and applications.
سؤال
In the system implementation phase of the systems development life cycle (SDLC), with ________ installation, the organization implements the entire new system/business processes on a limited portion of the business.

A)parallel
B)phased
C)pilot
D)plunge
سؤال
In the system implementation phase of the systems development life cycle (SDLC), with the ________ installation, the organization installs the next piece of the system only after the previous piece works.

A)phased
B)pilot
C)parallel
D)plunge
سؤال
During the system implementation phase of the systems development life cycle (SDLC), once a system has passed testing, the organization installs the new system. Which of the following terms is used to refer to this activity?

A)system configuration
B)system conversion
C)system development
D)system control
سؤال
The ________ is a sequence of activities that determine the earliest date by which a project can be completed.

A)exit path
B)cycle route
C)critical path
D)scatter route
سؤال
The process of assessing a project's feasibility occurs during the component design phase of the systems development life cycle (SDLC).
سؤال
Unlike business analysts, systems analysts work more with managers and executives.
سؤال
What events led to the development of the Systems Development Life Cycle (SDLC)?
سؤال
A ________ shows the tasks, dates, and dependencies for the tasks of a project.

A)fusion chart
B)Gantt chart
C)Pareto chart
D)control chart
سؤال
User involvement is critical throughout the system development process.
سؤال
Which of the following is the key to successful systems development life cycle (SDLC)projects?

A)critical path template
B)work breakdown structure
C)scatter plot
D)control chart
سؤال
In the system implementation phase of the systems development life cycle (SDLC), with ________ installation, the new system runs alongside the old one until it has been tested and is fully operational.

A)pilot
B)phased
C)parallel
D)plunge
سؤال
A project team that develops an information system (IS)will comprise business and systems analysts during the requirements definition phase.
سؤال
The work done during ________ phase is either to fix the system so that it works correctly or to adapt it to changes in requirements.

A)implementation
B)maintenance
C)requirements analysis
D)component design
سؤال
A ________ involves balancing three critical factors: requirements, cost, and time.

A)work breakdown structure (WBS)
B)trade-off
C)test plan
D)critical path
سؤال
Systems analysts integrate the work of programmers, testers, and users.
سؤال
In systems development, documents, designs, prototypes, data models, database designs, and working data entry screens are examples of ________.

A)reports
B)resources
C)components
D)deliverables
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Information Systems Development
1
In business process management (BPM), an as-is model ________.

A)documents the existing business process
B)contrasts the former and current states of a business process
C)represents the desired state of a business process
D)represents the ideal state of a business process
A
2
________ play a key role in moving development projects through the SDLC or scrum development process.

A)Business analysts
B)Programmers
C)Systems analysts
D)Database designers
C
3
________ are information system (IS)professionals who understand both business and information technology.

A)Development analysts
B)Systems analysts
C)Network administrators
D)Database designers
B
4
The activities in a business process often involve information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is true of scrum?

A)It was developed to overcome the problems that occur when using the Business Process Modeling Notation (BPMN).
B)It does not adapt to change easily.
C)It is generic enough to be used for the development of business processes, information systems, and applications.
D)Its work periods are usually three months or longer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
6
Not all information systems have applications or software components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
7
Tranware Inc., an apparel manufacturer, receives cotton and other raw materials from its suppliers at the beginning of every quarter. With reference to this information, Tranware receives its ________ at the beginning of every quarter.

A)deliverables
B)physical repository
C)data repository
D)resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
8
A ________ is a network of activities, repositories, roles, resources, and flows that interact to accomplish a business function.

A)business stature
B)business analysis
C)business process
D)business policy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
9
A ________ is a person who is well versed in an organization's strategy and focuses on ensuring that business processes and information systems meet the organization's competitive strategies.

A)business analyst
B)business application programmer
C)business administrator
D)business supervisor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following statements is true about the relationship between business processes and information systems?

A)A business process need not relate to any information system, but an information system relates to at least one business process.
B)Information systems incorporate all business process activities and hence, should be developed before business processes.
C)The relationship between business processes and information systems is one-to-one.
D)Developing information systems before business processes ensures that all activities are considered in the development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
11
Describe the composition of a development team for an information system (IS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
12
The actors or participants in a business process are the users of information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following are the steps in the business process management (BPM)cycle?

A)model processes; implement processes; assess results; create components
B)create components; model processes; implement processes; assess results
C)implement processes; create components; model processes; assess results
D)model processes; create components; implement processes; assess results
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following statements is true of information systems?

A)Information systems include all business process activities.
B)Every information system has at least one application.
C)Information systems should be bought entirely off-the-shelf.
D)Every business process should include at least one information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
15
In a business process, ________ are defined as collections of related tasks that receive inputs and produce outputs.

A)activities
B)databases
C)resources
D)presentations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
16
Business processes, information systems, and applications have the same characteristics and components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
17
Information systems and business processes are synonymous terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
18
In business process management (BPM), once the as-is model is created, the very next step that a team must take is to ________.

A)obtain feedback about implementation
B)assess the results of the changes
C)look for improvement opportunities
D)implement changes in the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
19
In a business process, a role refers to ________.

A)a physical repository
B)the movement of data
C)a collection of data
D)a collection of activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
20
In a business process, resources are ________.

A)people or computer applications that are assigned to roles
B)collections of procedures and activities
C)the total number of points of work that can be accomplished in each scrum period
D)collections of related tasks that receive inputs and produce outputs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
21
Control Objectives for Information and related Technology (COBIT)is often used in the ________ stage of the business process management (BPM)cycle.

A)component creation
B)implementation
C)assessment
D)process modeling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
22
________ is a standard set of terms and graphical notations for documenting business processes.

A)Business Process Modeling Notation (BPMN)
B)Business Process Execution Language (BPEL)
C)Component Object Model (COM)
D)International Organization for Standardization (ISO)9000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
23
Implementing the new or changed process is the third activity in business process management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
24
Dimensions of process quality are effectiveness and efficiency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
25
Explain why process management is necessary for an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
26
An as-is model documents the desired outcome of a business process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
27
In a business process, only a single resource is assigned to a role.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
28
Melissa is in charge of creating a Business Process Modeling Notation (BPMN)diagram for the procurement department. The diagram will represent the separate paths to be followed for an old supplier and a new supplier. Which of the following shapes should Melissa use to represent the question "old supplier?" which can be answered with a yes or no as applicable?

A)diamonds
B)circles
C)rectangles
D)squares
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
29
An inventory is an example of a data repository.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
30
In a business process, roles are collections of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
31
Name the stages of the business process management cycle and summarize the activities in each.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
32
In a Business Process Modeling Notation (BPMN)diagram, ________ depict the flow or sequence of activities in a process.

A)dotted arrows
B)diamonds
C)solid arrows
D)circles
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following statements is true of the swim-lane layout used for modeling business processes?

A)It complicates the process diagrams.
B)It draws attention to the interactions among components of the diagram.
C)Each role in the business process has to share the swim-lane with other roles.
D)All activities for a given role are repeated in all the swim-lanes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following can be represented using the Business Process Modeling Notation (BPMN)?

A)Gantt charts
B)as-is models
C)scatter plots
D)PERT charts showing the critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
35
________ set the stage for the requirements for any information systems and applications that need to be created or adapted.

A)Business repositories
B)Business policies
C)Business reports
D)Business process models
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
36
Define business process, roles, resources, and data flows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
37
In a Business Process Modeling Notation (BPMN)diagram, dotted arrows depict the flow of ________ in the process.

A)resources
B)messages and data
C)tasks and activities
D)control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
38
The business process management cycle begins by creating a model of the existing business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
39
Ryan is creating a Business Process Modeling Notation (BPMN)diagram for the manufacturing process of his organization. Which of the following should he use to represent the check inventory activity?

A)a dotted arrow
B)a rectangle
C)a diamond
D)a solid arrow
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
40
Business process management applies only to commercial, profit-making organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
41
During the requirements definition stage of developing an information system, the project team will consist mostly of ________.

A)finance and account managers
B)test engineers and business users
C)business and systems analysts
D)database designers and administrators
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
42
In Business Process Modeling Notation (BPMN), solid arrows depict the flow of messages and data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
43
The ________ phase of the systems development life cycle (SDLC)involves determining hardware and program specifications, designing the database and procedures, and creating job definitions.

A)requirements analysis
B)system implementation
C)component design
D)system definition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
44
The first step in the system definition phase of the systems development life cycle (SDLC)is to ________.

A)plan the project
B)conduct a feasibility study
C)define the goals and scope
D)form the project team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
45
The final phase of the systems development life cycle (SDLC)is ________.

A)implementing the system
B)determining the requirements
C)maintaining the system
D)designing system components
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
46
Once the as-is model has been documented, that model can then be analyzed for problems or for improvement opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
47
The traditional process for developing information systems is ________.

A)the software testing life cycle
B)the systems development life cycle
C)the software defect life cycle
D)product life cycle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
48
The first phase of the systems development life cycle (SDLC)is ________.

A)defining the system
B)implementing the system
C)determining the requirements
D)maintaining the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
49
In the swim-lane layout for modeling business processes, each role is given its own swim lane.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following are the dimensions of feasibility?

A)planning, process, technical, and schedule feasibility
B)operational, strategic, technical, and tactical feasibility
C)cost, schedule, technical, and organizational feasibility
D)schedule, process, technical, and competitive feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
51
ACES is a quality auditing firm. It has dedicated a team of managers, business analysts, and system analysts to develop an information system that receives data and produces quarterly reports that grade companies on their quality rating. The team is using the five-phase systems development life cycle (SDLC)to develop this information system. During which of the following phases will the team identify what kind of reports need to be produced and how frequently?

A)requirements analysis
B)system implementation
C)component design
D)system definition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
52
A(n)________ is a formal description of a system's response to use and misuse scenarios.

A)activity log
B)work breakdown structure
C)test plan
D)defect report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
53
The project plan which results from defining the system is the input to ________, which is the second phase of the SDLC.

A)system design
B)requirement collection
C)requirements analysis
D)system maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
54
What are the types of arrows used in the swim-lane layout of Business Process Modeling Notation (BPMN)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
55
Once the project's goals and scope have been defined, the next step in the system definition phase of the systems development life cycle (SDLC)is to ________.

A)plan the project
B)assess feasibility
C)determine system requirements
D)form a project team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
56
Tasks in the ________ phase of the systems development life cycle (SDLC)are to build and test system components, and to convert users to the new system.

A)system definition
B)component design
C)system maintenance
D)system implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
57
If a defined project is determined to be feasible in the systems development life cycle (SDLC), the next step is to ________.

A)create and test components
B)form the project team
C)maintain the system
D)assess process results
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
58
In Business Process Modeling Notation (BPMN)diagrams, a square with a plus sign means that ________.

A)a question can be answered with no
B)it is the end of the process
C)a question can be answered with yes
D)an activity is considered to be a subprocess of a process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
59
Dentoin Pharmaceuticals requires an information system to support its new assembly line. The management has assigned a team of ten members to plan this project. Which of the following will be the first major task for this team?

A)designing the system components
B)assessing the project's feasibility
C)planning the project
D)defining the system goals and scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
60
Organizational feasibility concerns ________.

A)the organization's budget and schedule requirements
B)the competitor's business process model
C)whether the organization has the technical infrastructure to implement the new system
D)whether the new system fits within the organization's customs or legal requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
61
What are the phases of the systems development life cycle (SDLC)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
62
Define technical feasibility and organizational feasibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
63
In the context of system implementation phase of the systems development life cycle (SDLC), a ________ installation is the riskiest because the old system is shut down and the new system is introduced.

A)pilot
B)phased
C)parallel
D)plunge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
64
The systems development life cycle is the traditional process used to develop information systems and applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
65
In the system implementation phase of the systems development life cycle (SDLC), with ________ installation, the organization implements the entire new system/business processes on a limited portion of the business.

A)parallel
B)phased
C)pilot
D)plunge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
66
In the system implementation phase of the systems development life cycle (SDLC), with the ________ installation, the organization installs the next piece of the system only after the previous piece works.

A)phased
B)pilot
C)parallel
D)plunge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
67
During the system implementation phase of the systems development life cycle (SDLC), once a system has passed testing, the organization installs the new system. Which of the following terms is used to refer to this activity?

A)system configuration
B)system conversion
C)system development
D)system control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
68
The ________ is a sequence of activities that determine the earliest date by which a project can be completed.

A)exit path
B)cycle route
C)critical path
D)scatter route
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
69
The process of assessing a project's feasibility occurs during the component design phase of the systems development life cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
70
Unlike business analysts, systems analysts work more with managers and executives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
71
What events led to the development of the Systems Development Life Cycle (SDLC)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
72
A ________ shows the tasks, dates, and dependencies for the tasks of a project.

A)fusion chart
B)Gantt chart
C)Pareto chart
D)control chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
73
User involvement is critical throughout the system development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following is the key to successful systems development life cycle (SDLC)projects?

A)critical path template
B)work breakdown structure
C)scatter plot
D)control chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
75
In the system implementation phase of the systems development life cycle (SDLC), with ________ installation, the new system runs alongside the old one until it has been tested and is fully operational.

A)pilot
B)phased
C)parallel
D)plunge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
76
A project team that develops an information system (IS)will comprise business and systems analysts during the requirements definition phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
77
The work done during ________ phase is either to fix the system so that it works correctly or to adapt it to changes in requirements.

A)implementation
B)maintenance
C)requirements analysis
D)component design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
78
A ________ involves balancing three critical factors: requirements, cost, and time.

A)work breakdown structure (WBS)
B)trade-off
C)test plan
D)critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
79
Systems analysts integrate the work of programmers, testers, and users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
80
In systems development, documents, designs, prototypes, data models, database designs, and working data entry screens are examples of ________.

A)reports
B)resources
C)components
D)deliverables
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.