Deck 15: Ais Selection and Implementation

ملء الشاشة (f)
exit full mode
سؤال
Parallel conversion is also known as the "big bang."
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
What is a common threat in AIS software selection?

A) The danger of adopting "cutting edge" technology that contains defects
B) Newer software products have a greater number of "bugs."
C) The language in licensing contracts
D) All of these are common threats in AIS software selection.
سؤال
The development of accounting systems for microcomputers led to the concentration of accounting functions within the accounting department.
سؤال
Merchantability refers to the ability of a product to perform some function.
سؤال
What is the most significant advantage of a single supplier of an AIS?

A) Greater expertise is available.
B) The choice of suppliers will greatly expand.
C) One party is responsible for implementation.
D) None of these is a significant advantage.
سؤال
Most AIS developers permit no changes to programs, while the next largest group permits only limited changes.
سؤال
If you buy an AIS system directly from a developer, you may have more ability to negotiate than if you buy from a VAR.
سؤال
What is a Gantt chart?

A) A diagram planning tool showing the order in which to perform tasks
B) A bar chart with all major tasks on the vertical axis and a calendar on the horizontal axis
C) A bar chart with all major tasks on the horizontal axis and a calendar on the vertical axis
D) A decision chart designed to determine a single versus multiple suppliers
سؤال
What is modular conversion to a new accounting information system?

A) A conversion method that is used when a company has a number of locations, and the AIS is to be installed at each location
B) The opposite of a parallel conversion
C) The installation of one AIS component at a time and the loading of data only for that component
D) A conversion method in which the old system is stopped and existing data are imported to the new system.
سؤال
What is the first step in planning projects?

A) Divide the team into subcommittees with members on more than one subcommittee.
B) Perform an informal survey of system users.
C) Prepare a preliminary list of constraints.
D) Outline the various tasks required.
سؤال
Which of the following is not an ERP package?

A) Oracle E-Business Suite
B) Lawson Enterprise
C) Microsoft Dynamics GP
D) Peachtree by Sage
سؤال
The current business model for AIS implementation is to purchase a commercial off-the- shelf accounting software package.
سؤال
Software that groups an organization's accounting function with finance, sales, manufacturing, and human resources into a coherent, integrated system is referred to as a what?

A) Global resource planning package
B) Enterprise resource planning package
C) Worldwide enterprise resource package
D) Global accounting information package
سؤال
ERP software caught on so quickly because of its simplicity and low cost.
سؤال
Bar codes are one example of an automatic identification technology used by manufacturers.
سؤال
Many CPAs advise against any modifications of a commercial off-the-shelf AIS.
سؤال
Because the failure of an AIS may mean bankruptcy for an organization, what is the most stressful method of conversion to an AIS?

A) Direct conversion
B) Modular conversion
C) Parallel conversion
D) Pilot conversion
سؤال
What is AIS installation?

A) The transfer of AIS programs to client computers
B) A process that is more comprehensive than implementation
C) A process that includes conversion planning and training of new personnel
D) All of the above are true about AIS installation.
سؤال
Newer AIS software products will have a greater number of "bugs" than older products.
سؤال
What is the most difficult problem associated with parallel conversion to a new AIS?

A) The same personnel are needed to operate both systems.
B) Implementing real-time processing is difficult.
C) Conversion teams must travel from store to store for implementation of the new system.
D) Parallel conversions are the most expensive and time consuming type of conversion.
سؤال
Pilot conversion is the installation of one AIS module at a time and loading of data only for that module.
سؤال
Distinguish between AIS installation and AIS implementation.
سؤال
What is the difference in AIS installation and AIS implementation?
سؤال
List the tasks required in a systems acquisition project.
سؤال
Finding the best accounting package for an organization is easy.
سؤال
Most accounting VARs handle only one to three accounting software packages.
سؤال
What are four issues in system acquisition?
سؤال
With parallel conversion, the old system is stopped and the new system is started.
سؤال
Two very good tools for gathering in formation to help select the best accounting system are The Accounting Library and CTS Guides.
سؤال
Discuss issues involved in system acquisition.
سؤال
A subcommittee having representatives from all functional areas of the organization should write demonstration scripts that are used to guide demonstrations of the AIS packages.
سؤال
Discuss what is meant by enterprise resource planning (ERP) packages and give some examples of the leading packages.
سؤال
One way to identify the preliminary requirements of an AIS system is to determine the inadequacies of the existing system.
سؤال
Discuss the various methods of conversion to an AIS system.
سؤال
Describe two planning tools used in AIS selection and implementation.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/35
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Ais Selection and Implementation
1
Parallel conversion is also known as the "big bang."
False
2
What is a common threat in AIS software selection?

A) The danger of adopting "cutting edge" technology that contains defects
B) Newer software products have a greater number of "bugs."
C) The language in licensing contracts
D) All of these are common threats in AIS software selection.
D
3
The development of accounting systems for microcomputers led to the concentration of accounting functions within the accounting department.
False
4
Merchantability refers to the ability of a product to perform some function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
5
What is the most significant advantage of a single supplier of an AIS?

A) Greater expertise is available.
B) The choice of suppliers will greatly expand.
C) One party is responsible for implementation.
D) None of these is a significant advantage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
6
Most AIS developers permit no changes to programs, while the next largest group permits only limited changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
7
If you buy an AIS system directly from a developer, you may have more ability to negotiate than if you buy from a VAR.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
8
What is a Gantt chart?

A) A diagram planning tool showing the order in which to perform tasks
B) A bar chart with all major tasks on the vertical axis and a calendar on the horizontal axis
C) A bar chart with all major tasks on the horizontal axis and a calendar on the vertical axis
D) A decision chart designed to determine a single versus multiple suppliers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
9
What is modular conversion to a new accounting information system?

A) A conversion method that is used when a company has a number of locations, and the AIS is to be installed at each location
B) The opposite of a parallel conversion
C) The installation of one AIS component at a time and the loading of data only for that component
D) A conversion method in which the old system is stopped and existing data are imported to the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
10
What is the first step in planning projects?

A) Divide the team into subcommittees with members on more than one subcommittee.
B) Perform an informal survey of system users.
C) Prepare a preliminary list of constraints.
D) Outline the various tasks required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is not an ERP package?

A) Oracle E-Business Suite
B) Lawson Enterprise
C) Microsoft Dynamics GP
D) Peachtree by Sage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
12
The current business model for AIS implementation is to purchase a commercial off-the- shelf accounting software package.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
13
Software that groups an organization's accounting function with finance, sales, manufacturing, and human resources into a coherent, integrated system is referred to as a what?

A) Global resource planning package
B) Enterprise resource planning package
C) Worldwide enterprise resource package
D) Global accounting information package
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
14
ERP software caught on so quickly because of its simplicity and low cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
15
Bar codes are one example of an automatic identification technology used by manufacturers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
16
Many CPAs advise against any modifications of a commercial off-the-shelf AIS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
17
Because the failure of an AIS may mean bankruptcy for an organization, what is the most stressful method of conversion to an AIS?

A) Direct conversion
B) Modular conversion
C) Parallel conversion
D) Pilot conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
18
What is AIS installation?

A) The transfer of AIS programs to client computers
B) A process that is more comprehensive than implementation
C) A process that includes conversion planning and training of new personnel
D) All of the above are true about AIS installation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
19
Newer AIS software products will have a greater number of "bugs" than older products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
20
What is the most difficult problem associated with parallel conversion to a new AIS?

A) The same personnel are needed to operate both systems.
B) Implementing real-time processing is difficult.
C) Conversion teams must travel from store to store for implementation of the new system.
D) Parallel conversions are the most expensive and time consuming type of conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
21
Pilot conversion is the installation of one AIS module at a time and loading of data only for that module.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
22
Distinguish between AIS installation and AIS implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
23
What is the difference in AIS installation and AIS implementation?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
24
List the tasks required in a systems acquisition project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
25
Finding the best accounting package for an organization is easy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
26
Most accounting VARs handle only one to three accounting software packages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
27
What are four issues in system acquisition?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
28
With parallel conversion, the old system is stopped and the new system is started.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
29
Two very good tools for gathering in formation to help select the best accounting system are The Accounting Library and CTS Guides.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
30
Discuss issues involved in system acquisition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
31
A subcommittee having representatives from all functional areas of the organization should write demonstration scripts that are used to guide demonstrations of the AIS packages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
32
Discuss what is meant by enterprise resource planning (ERP) packages and give some examples of the leading packages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
33
One way to identify the preliminary requirements of an AIS system is to determine the inadequacies of the existing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
34
Discuss the various methods of conversion to an AIS system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
35
Describe two planning tools used in AIS selection and implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 35 في هذه المجموعة.