Deck 6: Defining Scope and Constructing Work Breakdown Structures WBS
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/44
العب
ملء الشاشة (f)
Deck 6: Defining Scope and Constructing Work Breakdown Structures WBS
1
A thorough scope definition process will often yield multiple project deliverables including intermediate project deliverables due before the project is complete.
True
2
Failure to include project management in the Work Breakdown Structure will increase the likelihood that the project will finish late or over budget.
True
3
The Work Breakdown Structure is normally developed by listing major deliverables and then progressively smaller ones,until the team feels that every deliverable has been identified.
True
4
By using a systematic process of creating a Work Breakdown Structure,project team members can ensure that they remember all deliverables that need to be created.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
5
The project scope refers to the features and functions that characterize a product,service or result.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
6
Organizing the second level of the Work Breakdown Structure by major design components facilitates rolling wave planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
7
Plan scope management is the process of creating a project scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
8
A Work Breakdown Structure (WBS)component is a term that simply refers to an entry in the WBS that can be at any level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
9
In order to construct a project Work Breakdown Structure,a project team needs to enlist support from subject matter experts who understand how each portion of the work will be accomplished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
10
Since work packages provide the basis for future project planning activities,they should be as detailed as possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
11
The project scope statement will frequently state what features and work elements are excluded from the project in addition to stating which are included.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
12
Almost all projects have deliverables dealing with documentation and customer enablement in addition to the primary deliverable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
13
If a problem occurs during project execution,the Work Breakdown Structure can be used to understand exactly where and why the problem occurred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
14
A WBS dictionary is a document that defines each of the terms used in the project scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
15
The most conventional approach to create a Work Breakdown Structure is to adopt a "top-down" approach,which can be used when the project work is familiar to the team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
16
Baselining is defined as a technique for dividing and subdividing the project scope and project deliverables into smaller,more manageable parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
17
The best project scope statements are brief,succinct and limit their focus specifically to the work to be performed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
18
A Work Breakdown Structure must be decomposed at least four levels in order to be effective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
19
It is important to assign a unique number to every component in the project Work Breakdown Structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
20
The project scope is the work that must be performed to deliver a product,service or result with the specified features and functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
21
Define Scope is the process of developing:
A) a project scope management plan.
B) a detailed description of the project and product.
C) a project work breakdown structure.
D) a project scope network diagram
A) a project scope management plan.
B) a detailed description of the project and product.
C) a project work breakdown structure.
D) a project scope network diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
22
A deliverable at the lowest level of each branch of a work breakdown structure is known as:
A) a work element.
B) a work package.
C) a work unit.
D) a control account
A) a work element.
B) a work package.
C) a work unit.
D) a control account
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
23
It is helpful to list requirements and supporting information in a requirements traceability matrix.When requirements are complete,they should meet all of these criteria EXCEPT:
A) identified with the stakeholder who needs it
B) assigned to a team member who will be the requirement owner
C) measurable,so that the value and completion can be verified
D) prioritized so tradeoff decisions can be made if necessary
A) identified with the stakeholder who needs it
B) assigned to a team member who will be the requirement owner
C) measurable,so that the value and completion can be verified
D) prioritized so tradeoff decisions can be made if necessary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
24
The approved version of a work product that can be changed only through formal change control procedures is called a ____:
A) requirement.
B) baseline.
C) benchmark.
D) component.
A) requirement.
B) baseline.
C) benchmark.
D) component.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following items best describes a project Work Breakdown Structure (WBS)?
A) an organizational chart depicting who will perform project work
B) a schedule depicting when project work will be performed
C) a tool that the team uses to progressively divide deliverables into smaller pieces
D) a list of activities to complete the project work packages
A) an organizational chart depicting who will perform project work
B) a schedule depicting when project work will be performed
C) a tool that the team uses to progressively divide deliverables into smaller pieces
D) a list of activities to complete the project work packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
26
The approved set of procedures that describe how modifications to the project deliverables and documentation will be managed and controlled are collectively known by which of the following terms?
A) scope statement
B) change control system
C) configuration management plan
D) scope management plan
A) scope statement
B) change control system
C) configuration management plan
D) scope management plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
27
All of the following conventions are widely adopted when project teams create the second level of the project Work Breakdown Structure (WBS)EXCEPT:
A) The second level may be organized by project phase.
B) The second level may be organized by major design components.
C) The second level may be organized by work function.
D) The second level may be organized by activities and tasks
A) The second level may be organized by project phase.
B) The second level may be organized by major design components.
C) The second level may be organized by work function.
D) The second level may be organized by activities and tasks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following is not a format that is typically used to represent a Work Breakdown Structure?
A) Hierarchical
B) Indented outline
C) Requirements Traceability Matrix
D) Free Format
A) Hierarchical
B) Indented outline
C) Requirements Traceability Matrix
D) Free Format
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following statements is true concerning the adoption of rolling wave planning in project management?
A) It is facilitated when the second level of the work breakdown structure is organized by phase or design components.
B) It is initially cumbersome,often delaying a prompt and timely project start.
C) It often creates a situation known as "analysis paralysis."
D) It requires detailed bottom-up estimating for every WBS component
A) It is facilitated when the second level of the work breakdown structure is organized by phase or design components.
B) It is initially cumbersome,often delaying a prompt and timely project start.
C) It often creates a situation known as "analysis paralysis."
D) It requires detailed bottom-up estimating for every WBS component
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
30
Once the project is underway,each potential change to a project is normally documented by some sort of change request.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
31
Work Breakdown Structures typically include one or more intermediate levels.Which of the following statements correctly describe the nature of these intermediate levels?
A) They generally represent items that need to be created in order to create the final deliverables.
B) They generally represent the raw materials required to create the final deliverables.
C) They generally represent the resource assignments to create the final deliverables.
D) They generally represent the sequence and timing of work packages
A) They generally represent items that need to be created in order to create the final deliverables.
B) They generally represent the raw materials required to create the final deliverables.
C) They generally represent the resource assignments to create the final deliverables.
D) They generally represent the sequence and timing of work packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
32
The project scope planning processes include all of the following EXCEPT:
A) how the project scope will be defined
B) how the requirements will be collected
C) how the work breakdown structure will be created
D) how the business case will be created
A) how the project scope will be defined
B) how the requirements will be collected
C) how the work breakdown structure will be created
D) how the business case will be created
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
33
The Work Breakdown Structure (WBS)is a framework that will be used as a basis for further planning activities including all the following EXCEPT:
A) developing the project schedule
B) developing the project cost estimate
C) identifying key stakeholders
D) identifying project risks
A) developing the project schedule
B) developing the project cost estimate
C) identifying key stakeholders
D) identifying project risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following statements concerning work packages is NOT correct?
A) Work packages are the basis for subsequent project planning activities.
B) Work packages are the basis for subsequent project control activities.
C) Work packages are activity elements with detailed descriptions of tasks and dependencies
D) Work packages are the elements at the lowest level of the WBS.
A) Work packages are the basis for subsequent project planning activities.
B) Work packages are the basis for subsequent project control activities.
C) Work packages are activity elements with detailed descriptions of tasks and dependencies
D) Work packages are the elements at the lowest level of the WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
35
Work Breakdown Structures can be displayed in a variety of formats including which of the following?
A) a sequential process diagram
B) an inverted pyramid
C) an indented outline format
D) fishbone or cause and effect diagram
A) a sequential process diagram
B) an inverted pyramid
C) an indented outline format
D) fishbone or cause and effect diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
36
The technique for dividing and subdividing the project scope and project deliverables into smaller,more manageable parts is called:
A) rolling wave planning
B) decomposition
C) parent child relationship
D) requirements traceability
A) rolling wave planning
B) decomposition
C) parent child relationship
D) requirements traceability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
37
On agile projects,the scope definition begins with :
A) brainstorming
B) joint application development (JAD)sessions
C) creation of the WBS
D) user stories
A) brainstorming
B) joint application development (JAD)sessions
C) creation of the WBS
D) user stories
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
38
All of the following elements should be included in a project scope statement EXCEPT:
A) project boundaries or exclusions
B) names of the project team members
C) assumptions and constraints that may limit or influence project work
D) key deliverables with acceptance criteria
A) project boundaries or exclusions
B) names of the project team members
C) assumptions and constraints that may limit or influence project work
D) key deliverables with acceptance criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
39
All of the following statements correctly describe a contemporary approach to create the Work Breakdown Structure (WBS)for a project EXCEPT:
A) Project teams may adopt a top-down approach to construct the WBS.
B) Project teams may rely upon a WBS from a previous project as a starting point.
C) Project teams may rely upon the project manager to create the entire WBS
D) Project teams may jump start the effort with a brainstorming session.
A) Project teams may adopt a top-down approach to construct the WBS.
B) Project teams may rely upon a WBS from a previous project as a starting point.
C) Project teams may rely upon the project manager to create the entire WBS
D) Project teams may jump start the effort with a brainstorming session.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
40
For each component in the Work Breakdown Structure (WBS),the WBS dictionary includes all the following fields that will be progressively elaborated EXCEPT:
A) a brief description of the work
B) names of team member(s)responsible for creating the deliverables
C) a list of associated deliverables
D) type of resources needed
A) a brief description of the work
B) names of team member(s)responsible for creating the deliverables
C) a list of associated deliverables
D) type of resources needed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
41
Identify and describe the three steps that the team should follow in order to define project scope and create a project scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
42
Explain how scope is defined on agile projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
43
What are some of the benefits of creating a Work Breakdown Structure (WBS)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
44
A typical change request form will include which of the following content items?
A) a description of the change along with the impact of making the change
B) a summary of previous changes to the project
C) an issues log
D) a change control process flow diagram
A) a description of the change along with the impact of making the change
B) a summary of previous changes to the project
C) an issues log
D) a change control process flow diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck