Deck 12: Property Operation and Maintenance

ملء الشاشة (f)
exit full mode
سؤال
What is the title typically given to the individual responsible for the administration of a hotel's property operations and maintenance (POM)department?

A) POM Manager
B) Chief Engineer
C) Director of POM
D) Head of Engineering
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which utility cost is typically greatest for hotels?

A) Water
B) Electricity
C) Natural gas
D) Fossil fuels
سؤال
At what age will a hotel building first need minor renovation as well as refurbishment?

A) 3-6 years
B) 8-15 years
C) 16-21 years
D) 22+ years
سؤال
In general FF&E reserves in a hotel should average what percent of a hotel's gross revenue?

A) Less than 2%
B) 2-4%
C) 5-7%
D) 8-10%
سؤال
In a well-managed hotel,who should be able to initiate work orders?

A) All employees
B) Only POM staff
C) All salaried employees
D) Only Housekeeping staff
سؤال
In most cases a hotel's wastewater charges will be reduced when its

A) natural gas usage is reduced.
B) water consumption is reduced.
C) electrical consumption is reduced.
D) fossil fuel consumption is reduced.
سؤال
Keeping careful track of exactly when air filters have been changed in guest room heating and cooling units is an example of which maintenance activity?

A) Planning
B) Organizing
C) Recording
D) Implementing
سؤال
Which maintenance tasks would most likely require the unplanned use of employee overtime and the use of outside service providers?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
سؤال
The designing of a hotel's HVAC system would be considered which type of activity?

A) Engineering
B) Maintenance
C) Routine planning
D) Preventive maintenance
سؤال
An effective HVAC system in a hotel provides comfortable air temperatures and it

A) provides proper air quality.
B) requires minimal maintenance.
C) has been designed by the hotel's chief engineer.
D) must complement the hotel's water delivery systems.
سؤال
A hotel purchases a highly complex piece of operating equipment.What is the GM's role regarding employee training for the use of this piece of equipment?

A) Ensure the person managing the POM department provides the training.
B) Ensure the company providing the equipment provides employee training.
C) Train the person managing the POM department in the use of the equipment.
D) Hire only maintenance staff with experience operating the piece of equipment.
سؤال
Which maintenance tasks are most likely to require labor and parts purchased at premium prices?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
سؤال
Which task would NOT typically be assigned to an individual employed as a maintenance assistant in a hotel?

A) Reset circuit breakers
B) Design electrical systems
C) Replace electrical switches
D) Use voltage testers and amp probes
سؤال
GMs must be most concerned with indemnification-related issues when

A) POM staff are poorly trained.
B) POM staff turnover rates are very high.
C) preventive maintenance activities are undertaken by POM staff.
D) outside vendors, rather than POM staff, are used to provide services.
سؤال
Which types of tasks performed by a POM department involve the customary care of the hotel facility?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
سؤال
For which POM activity would it be most important for a hotel to document its routine maintenance efforts?

A) In-room TV sets
B) Exercise equipment
C) Highway sign lightbulbs
D) Refrigeration compressors
سؤال
What is measured by lumens?

A) Light intensity
B) Electrical usage
C) Water flow rates
D) Natural gas flow rates
سؤال
Which maintenance tasks performed by a POM department involve the daily cleaning of the lint traps in dryers used in a hotel's OPL?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
سؤال
The major cost of operating a hotel's air conditioning system will be related to its use of

A) water.
B) electricity.
C) natural gas.
D) fossils fuels.
سؤال
Replacement of filters in a hotel's HVAC system would be considered which type of activity?

A) Controlling
B) Engineering
C) Maintenance
D) Routine planning
سؤال
For what types of equipment would seasonal PM programs be most important?

A) Gas
B) HVAC
C) Kitchen
D) Wastewater
سؤال
What is an energy sensitive,but effective for cleaning,setting for hot water temperatures to be used in a hotel's OPL?

A) 90° Fahrenheit (32° Celsius)
B) 100° Fahrenheit (38° Celsius)
C) 110° Fahrenheit (43° Celsius)
D) 120° Fahrenheit (49° Celsius)
سؤال
Which type of light producing lamps requires special disposal methods because they contain trace amounts of mercury?

A) CFLs
B) LEDs
C) Traditional
D) Incandescent
سؤال
Which two areas of sustainability are most influenced when a hotel's POM department installs water flow restrictors in guest room shower heads?

A) Energy conservation and waste minimization
B) Water management and pollution prevention
C) Water management and energy management
D) Energy conservation and environmentally sensitive purchasing
سؤال
Which is the highest level of LEED recognition for which a green hotel could qualify?

A) Gold
B) Silver
C) Certified
D) Platinum
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Property Operation and Maintenance
1
What is the title typically given to the individual responsible for the administration of a hotel's property operations and maintenance (POM)department?

A) POM Manager
B) Chief Engineer
C) Director of POM
D) Head of Engineering
B
2
Which utility cost is typically greatest for hotels?

A) Water
B) Electricity
C) Natural gas
D) Fossil fuels
B
3
At what age will a hotel building first need minor renovation as well as refurbishment?

A) 3-6 years
B) 8-15 years
C) 16-21 years
D) 22+ years
B
4
In general FF&E reserves in a hotel should average what percent of a hotel's gross revenue?

A) Less than 2%
B) 2-4%
C) 5-7%
D) 8-10%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
In a well-managed hotel,who should be able to initiate work orders?

A) All employees
B) Only POM staff
C) All salaried employees
D) Only Housekeeping staff
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
In most cases a hotel's wastewater charges will be reduced when its

A) natural gas usage is reduced.
B) water consumption is reduced.
C) electrical consumption is reduced.
D) fossil fuel consumption is reduced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
Keeping careful track of exactly when air filters have been changed in guest room heating and cooling units is an example of which maintenance activity?

A) Planning
B) Organizing
C) Recording
D) Implementing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which maintenance tasks would most likely require the unplanned use of employee overtime and the use of outside service providers?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
The designing of a hotel's HVAC system would be considered which type of activity?

A) Engineering
B) Maintenance
C) Routine planning
D) Preventive maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
An effective HVAC system in a hotel provides comfortable air temperatures and it

A) provides proper air quality.
B) requires minimal maintenance.
C) has been designed by the hotel's chief engineer.
D) must complement the hotel's water delivery systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
A hotel purchases a highly complex piece of operating equipment.What is the GM's role regarding employee training for the use of this piece of equipment?

A) Ensure the person managing the POM department provides the training.
B) Ensure the company providing the equipment provides employee training.
C) Train the person managing the POM department in the use of the equipment.
D) Hire only maintenance staff with experience operating the piece of equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which maintenance tasks are most likely to require labor and parts purchased at premium prices?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which task would NOT typically be assigned to an individual employed as a maintenance assistant in a hotel?

A) Reset circuit breakers
B) Design electrical systems
C) Replace electrical switches
D) Use voltage testers and amp probes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
GMs must be most concerned with indemnification-related issues when

A) POM staff are poorly trained.
B) POM staff turnover rates are very high.
C) preventive maintenance activities are undertaken by POM staff.
D) outside vendors, rather than POM staff, are used to provide services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which types of tasks performed by a POM department involve the customary care of the hotel facility?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
For which POM activity would it be most important for a hotel to document its routine maintenance efforts?

A) In-room TV sets
B) Exercise equipment
C) Highway sign lightbulbs
D) Refrigeration compressors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
What is measured by lumens?

A) Light intensity
B) Electrical usage
C) Water flow rates
D) Natural gas flow rates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which maintenance tasks performed by a POM department involve the daily cleaning of the lint traps in dryers used in a hotel's OPL?

A) Routine
B) Preventive
C) Emergency
D) Outsourced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
The major cost of operating a hotel's air conditioning system will be related to its use of

A) water.
B) electricity.
C) natural gas.
D) fossils fuels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
Replacement of filters in a hotel's HVAC system would be considered which type of activity?

A) Controlling
B) Engineering
C) Maintenance
D) Routine planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
For what types of equipment would seasonal PM programs be most important?

A) Gas
B) HVAC
C) Kitchen
D) Wastewater
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
What is an energy sensitive,but effective for cleaning,setting for hot water temperatures to be used in a hotel's OPL?

A) 90° Fahrenheit (32° Celsius)
B) 100° Fahrenheit (38° Celsius)
C) 110° Fahrenheit (43° Celsius)
D) 120° Fahrenheit (49° Celsius)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which type of light producing lamps requires special disposal methods because they contain trace amounts of mercury?

A) CFLs
B) LEDs
C) Traditional
D) Incandescent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which two areas of sustainability are most influenced when a hotel's POM department installs water flow restrictors in guest room shower heads?

A) Energy conservation and waste minimization
B) Water management and pollution prevention
C) Water management and energy management
D) Energy conservation and environmentally sensitive purchasing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which is the highest level of LEED recognition for which a green hotel could qualify?

A) Gold
B) Silver
C) Certified
D) Platinum
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.