Deck 3: The Project Management Process Groups: A Case Study

ملء الشاشة (f)
exit full mode
سؤال
Key outcomes of the executing process group are formal acceptance of the work and creation of closing documents.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The kick-off meeting is always held before the business case and project charter are completed.
سؤال
The executing process group generally requires the most resources.
سؤال
Agile methods comprise of 45 subprocesses which are organized into eight process groups.
سؤال
The DMAIC (Define, Measure, Analyze, Improve, and Control) methodology of the Six Sigma projects, is used to improve an existing business process.
سؤال
A milestone list is an output associated with the Project Scope Management knowledge area.
سؤال
The WBS provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
سؤال
Initiating and closing tasks are usually the longest and require the most amount of resources and time.
سؤال
Project initiation involves taking the actions necessary to ensure that activities in the project plan are completed.
سؤال
Decisions and actions taken in one knowledge area at a certain time rarely affect other knowledge areas.
سؤال
The level of activity and length of each process group varies for every project.
سؤال
Initiating processes take place during each phase of a project.
سؤال
Identifying the project sponsor is a pre-initiation task.
سؤال
The output of the stakeholder management strategy results is a project charter.
سؤال
Initiating processes are not required to end a project.
سؤال
Monitoring and controlling processes overlap all of the other project management process groups.
سؤال
The Rational Unified Process (RUP) framework is incompatible with the PMBOK process.
سؤال
Details of kick-off meetings and the stakeholder details are usually recorded in a Word document.
سؤال
An organization's project management plan expresses the vision, mission, goals, objectives, and strategies of the organization.
سؤال
Many project management activities occur as part of the planning process group.
سؤال
_____ processes include devising and maintaining a workable scheme to ensure that the project addresses the organization's needs.

A)Initiating
B)Planning  
C)Executing
D)Monitoring and controlling
سؤال
A common _____ process is reporting performance, where project stakeholders can identify any necessary changes that may be required to keep the project on track.

A)executing
B)closing  
C)monitoring and controlling
D)planning
سؤال
The project time management knowledge area maps to the _____ process group through the activity of schedule control.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
سؤال
_____ processes include defining and authorizing a project or project phase.

A)Initiating
B)Planning  
C)Executing
D)Monitoring and controlling
سؤال
Administrative activities, such as archiving project files, closing out contracts, documenting lessons learned, and receiving formal acceptance of the delivered work as part of the phase or project, are often involved in _____ processes.

A)monitoring and controlling
B)executing  
C)initiating
D)closing
سؤال
The project integration management knowledge area maps to the _____ process group through the activities of developing project charters.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
سؤال
The project scope management knowledge area maps to the _____ process group through the activities of scope validation and scope control.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
سؤال
In the Scrum method, team members work as a self-directed group coached by the ScrumMaster.
سؤال
Which of the following is a pre-initiation task?

A)Drawing up a work breakdown structure
B)Developing a business case for a project  
C)Drafting the project charter
D)Identifying stakeholders
سؤال
The two main items for monitoring and controlling in the Scrum framework are the daily?Scrum and the sprint retrospectives.
سؤال
Examples of _____ processes include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements.

A)monitoring and controlling
B)executing  
C)planning
D)initiating
سؤال
The burndown chart is a Scrum created artifact that provides a list of features prioritized by business value.
سؤال
_____ is a planning process that is within the Project Scope Management knowledge area.

A)Schedule development
B)Developing a project management plan  
C)Creation of a WBS
D)Quality planning
سؤال
_____ is an iterative software development process that focuses on team productivity and delivers software best practices to all team members.

A)Agile Unified Process
B)Dynamic Systems Development Method  
C)Rational Unified Process
D)Six Sigma
سؤال
During _____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition.

A)initiating
B)planning  
C)opening
D)controlling
سؤال
The pre-initiation phase of a project using the Scrum method does not involve project charters, stakeholder management strategy, and kick-off meetings.
سؤال
The project cost management knowledge area maps to the _____ process group through the activities of estimating costs and budget determination.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
سؤال
Developing a _____ is a planning process that occurs in the Project Integration Management knowledge area.

A)schedule management plan
B)project management plan  
C)WBS
D)quality management
سؤال
The project stakeholder management knowledge area maps to the ______ process group by identifying stakeholders.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
سؤال
A sprint review is a meeting in which the team demonstrates to the product owner what it has completed during the sprint.
سؤال
The ideal outcome of the _____ process group is to complete a project successfully by delivering the agreed-upon project scope within time, cost, and quality constraints.
سؤال
One of the main outputs of the initiation process is _____.

A)creating the work breakdown structure
B)selecting the project manager  
C)developing the project charter
D)identifying the project sponsor
سؤال
The main purpose of project plans is to

A)schedule management plans
B)define project scope  
C)estimate activity resources
D)guide project execution
سؤال
The project management plan is the output of the planning process of project _____.

A)integration management
B)quality management  
C)scope management
D)procurement management
سؤال
Which of the following is true about the agile method?

A)It is often used when a project team can express the scope early in the product life cycle. 
B)It is used when a project team wants to provide a potentially shippable product earlier rather than later. 
C)It uses several iterations or deliveries of software instead of waiting until the end of the project to provide a product. 
D)It is used when project teams want to use the predicative approach to a project.
سؤال
Which of the following project parameters would be compatible with the use of the agile approach?

A)Projects with inexperienced and dispersed teams  
B)Projects that have a fairly rigid completion date  
C)Projects with clear-up front requirements  
D)Projects that have more flexible scheduling
سؤال
Which of the following activities is a part of the planning process of the Scrum?

A)Determining how many sprints will compose each release  
B)Demonstrating the product during a sprint review meeting  
C)Completing tasks each day during sprints  
D)Creating sprint backlog
سؤال
The _____ process involves gaining stakeholder and customer acceptance of the final products and services and bringing the project, or project phase, to an orderly end.

A)executing
B)closing  
C)planning
D)monitoring
سؤال
The _____ provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.

A)scope statement
B)cost management plan  
C)work breakdown structure
D)project charter
سؤال
The most difficult and unappreciated process in project management is often

A)initiating
B)planning  
C)executing
D)monitoring and controlling
سؤال
A _____ is usually not necessary to the Scrum method.

A)team contract
B)velocity estimate  
C)Gantt chart
D)product backlog
سؤال
_____ progress from initiation activities to planning activities, executing activities, monitoring and controlling activities, and closing activities.
سؤال
A(n)_____ is a series of actions directed toward a particular result.
سؤال
_____ are an output of the executing process of project integration management.

A)Deliverables
B)Issue logs  
C)Resource calendars
D)Enterprise environmental factor updates
سؤال
Organizational process assets update is the output of the closing process of _____.

A)project integration management
B)project quality management  
C)project procurement management
D)project time management
سؤال
_____ includes measuring progress toward project objectives and taking corrective action to match progress with the plan.

A)Planning
B)Montioring and controlling  
C)Executing
D)Initiating
سؤال
Enterprise environmental factors are an output of the executing process of _____.

A)project integration management
B)project quality management  
C)project human resource management
D)project procurement management
سؤال
Which of the following is a planning process associated with project scope management?

A)Collecting requirements
B)Performing qualitative risk analysis  
C)Planning schedule management
D)Estimating costs
سؤال
The improvement of the product and process in the Scrum method is discussed at the _____.

A)sprint reflection meeting
B)sprint review meeting  
C)kick-off meeting
D)daily Scrum meeting
سؤال
A _____ is an important Scrum artifact used to graphically display progress on each sprint during the monitoring and controlling process.

A)WBS
B)sprint backlog  
C)burndown chart
D)product backlog
سؤال
_____ are short descriptions written by customers of what they need a Scrum system to do for them.
سؤال
A(n) _____ is a Scrum artifact and consists of the highest-priority items from the product backlog to be completed in a sprint.
سؤال
List and describe the five process management groups.
سؤال
_____ are people involved in or affected by project activities and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents to the project.
سؤال
A(n) _____ is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans.
سؤال
If done well, the _________ can produce several releases of useful software.
سؤال
A(n) _____ is a cross-functional team of five to nine people who organize themselves and the work to produce the desired results for each sprint.
سؤال
A(n) _____ is the person responsible for the business value of the project and for deciding what work to do and in what order when using a Scrum method.
سؤال
The most time and money should be spent on
سؤال
_________ issues often occur during project execution, especially conflicts.
سؤال
_____ the project includes work required to introduce any new hardware, software, and procedures into normal operations.
سؤال
The _____ is a very important tool in project management because it provides the basis for deciding how to do the work.
سؤال
A risk register is the output of _____.
سؤال
What is a methodology and what are some methodologies other than the PMBOK Guide do organizations use as a basis for project management methodology?
سؤال
_____ is a project management methodology that defines 45 separate subprocesses and organizes these into eight process groups.
سؤال
A(n) _____ describes how things should be done.
سؤال
A(n) _____ is a set period of time, normally two to four weeks, during which specific work must be completed and made ready for review when using Scrum methods.
سؤال
In Scrum, a(n) _____ is a useful object created by people.
سؤال
A(n) _____ is a document that includes stakeholders' roles, names, organizations, and contact information.
سؤال
A(n) _____ is the person who ensures that the team is productive, facilitates the daily Scrum, enables close cooperation across all roles and functions, and removes barriers that prevent the team from being effective.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/83
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: The Project Management Process Groups: A Case Study
1
Key outcomes of the executing process group are formal acceptance of the work and creation of closing documents.
False
Explanation: Key outcomes of the closing process group are formal acceptance of the work and creation of closing documents, such as a final project report and lessons-learned report.
2
The kick-off meeting is always held before the business case and project charter are completed.
False
Explanation: A kick-off meeting is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans. The kick-off meeting is often held after the business case and project charter are completed, but it could be held sooner, as needed.
3
The executing process group generally requires the most resources.
True
Explanation: The executing process group takes the actions necessary to complete the work described in the planning activities. It should overlap the other process groups, and generally requires the most resources.
4
Agile methods comprise of 45 subprocesses which are organized into eight process groups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
5
The DMAIC (Define, Measure, Analyze, Improve, and Control) methodology of the Six Sigma projects, is used to improve an existing business process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
6
A milestone list is an output associated with the Project Scope Management knowledge area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
7
The WBS provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
8
Initiating and closing tasks are usually the longest and require the most amount of resources and time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
9
Project initiation involves taking the actions necessary to ensure that activities in the project plan are completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
10
Decisions and actions taken in one knowledge area at a certain time rarely affect other knowledge areas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
11
The level of activity and length of each process group varies for every project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
12
Initiating processes take place during each phase of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
13
Identifying the project sponsor is a pre-initiation task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
14
The output of the stakeholder management strategy results is a project charter.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
15
Initiating processes are not required to end a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
16
Monitoring and controlling processes overlap all of the other project management process groups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
17
The Rational Unified Process (RUP) framework is incompatible with the PMBOK process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
18
Details of kick-off meetings and the stakeholder details are usually recorded in a Word document.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
19
An organization's project management plan expresses the vision, mission, goals, objectives, and strategies of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
20
Many project management activities occur as part of the planning process group.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
21
_____ processes include devising and maintaining a workable scheme to ensure that the project addresses the organization's needs.

A)Initiating
B)Planning  
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
22
A common _____ process is reporting performance, where project stakeholders can identify any necessary changes that may be required to keep the project on track.

A)executing
B)closing  
C)monitoring and controlling
D)planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
23
The project time management knowledge area maps to the _____ process group through the activity of schedule control.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
24
_____ processes include defining and authorizing a project or project phase.

A)Initiating
B)Planning  
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
25
Administrative activities, such as archiving project files, closing out contracts, documenting lessons learned, and receiving formal acceptance of the delivered work as part of the phase or project, are often involved in _____ processes.

A)monitoring and controlling
B)executing  
C)initiating
D)closing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
26
The project integration management knowledge area maps to the _____ process group through the activities of developing project charters.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
27
The project scope management knowledge area maps to the _____ process group through the activities of scope validation and scope control.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
28
In the Scrum method, team members work as a self-directed group coached by the ScrumMaster.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following is a pre-initiation task?

A)Drawing up a work breakdown structure
B)Developing a business case for a project  
C)Drafting the project charter
D)Identifying stakeholders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
30
The two main items for monitoring and controlling in the Scrum framework are the daily?Scrum and the sprint retrospectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
31
Examples of _____ processes include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements.

A)monitoring and controlling
B)executing  
C)planning
D)initiating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
32
The burndown chart is a Scrum created artifact that provides a list of features prioritized by business value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
33
_____ is a planning process that is within the Project Scope Management knowledge area.

A)Schedule development
B)Developing a project management plan  
C)Creation of a WBS
D)Quality planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
34
_____ is an iterative software development process that focuses on team productivity and delivers software best practices to all team members.

A)Agile Unified Process
B)Dynamic Systems Development Method  
C)Rational Unified Process
D)Six Sigma
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
35
During _____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition.

A)initiating
B)planning  
C)opening
D)controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
36
The pre-initiation phase of a project using the Scrum method does not involve project charters, stakeholder management strategy, and kick-off meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
37
The project cost management knowledge area maps to the _____ process group through the activities of estimating costs and budget determination.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
38
Developing a _____ is a planning process that occurs in the Project Integration Management knowledge area.

A)schedule management plan
B)project management plan  
C)WBS
D)quality management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
39
The project stakeholder management knowledge area maps to the ______ process group by identifying stakeholders.

A)initiating
B)planning  
C)executing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
40
A sprint review is a meeting in which the team demonstrates to the product owner what it has completed during the sprint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
41
The ideal outcome of the _____ process group is to complete a project successfully by delivering the agreed-upon project scope within time, cost, and quality constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
42
One of the main outputs of the initiation process is _____.

A)creating the work breakdown structure
B)selecting the project manager  
C)developing the project charter
D)identifying the project sponsor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
43
The main purpose of project plans is to

A)schedule management plans
B)define project scope  
C)estimate activity resources
D)guide project execution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
44
The project management plan is the output of the planning process of project _____.

A)integration management
B)quality management  
C)scope management
D)procurement management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is true about the agile method?

A)It is often used when a project team can express the scope early in the product life cycle. 
B)It is used when a project team wants to provide a potentially shippable product earlier rather than later. 
C)It uses several iterations or deliveries of software instead of waiting until the end of the project to provide a product. 
D)It is used when project teams want to use the predicative approach to a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following project parameters would be compatible with the use of the agile approach?

A)Projects with inexperienced and dispersed teams  
B)Projects that have a fairly rigid completion date  
C)Projects with clear-up front requirements  
D)Projects that have more flexible scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following activities is a part of the planning process of the Scrum?

A)Determining how many sprints will compose each release  
B)Demonstrating the product during a sprint review meeting  
C)Completing tasks each day during sprints  
D)Creating sprint backlog
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
48
The _____ process involves gaining stakeholder and customer acceptance of the final products and services and bringing the project, or project phase, to an orderly end.

A)executing
B)closing  
C)planning
D)monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
49
The _____ provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.

A)scope statement
B)cost management plan  
C)work breakdown structure
D)project charter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
50
The most difficult and unappreciated process in project management is often

A)initiating
B)planning  
C)executing
D)monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
51
A _____ is usually not necessary to the Scrum method.

A)team contract
B)velocity estimate  
C)Gantt chart
D)product backlog
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
52
_____ progress from initiation activities to planning activities, executing activities, monitoring and controlling activities, and closing activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
53
A(n)_____ is a series of actions directed toward a particular result.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
54
_____ are an output of the executing process of project integration management.

A)Deliverables
B)Issue logs  
C)Resource calendars
D)Enterprise environmental factor updates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
55
Organizational process assets update is the output of the closing process of _____.

A)project integration management
B)project quality management  
C)project procurement management
D)project time management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
56
_____ includes measuring progress toward project objectives and taking corrective action to match progress with the plan.

A)Planning
B)Montioring and controlling  
C)Executing
D)Initiating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
57
Enterprise environmental factors are an output of the executing process of _____.

A)project integration management
B)project quality management  
C)project human resource management
D)project procurement management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following is a planning process associated with project scope management?

A)Collecting requirements
B)Performing qualitative risk analysis  
C)Planning schedule management
D)Estimating costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
59
The improvement of the product and process in the Scrum method is discussed at the _____.

A)sprint reflection meeting
B)sprint review meeting  
C)kick-off meeting
D)daily Scrum meeting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
60
A _____ is an important Scrum artifact used to graphically display progress on each sprint during the monitoring and controlling process.

A)WBS
B)sprint backlog  
C)burndown chart
D)product backlog
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
61
_____ are short descriptions written by customers of what they need a Scrum system to do for them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
62
A(n) _____ is a Scrum artifact and consists of the highest-priority items from the product backlog to be completed in a sprint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
63
List and describe the five process management groups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
64
_____ are people involved in or affected by project activities and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents to the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
65
A(n) _____ is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
66
If done well, the _________ can produce several releases of useful software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
67
A(n) _____ is a cross-functional team of five to nine people who organize themselves and the work to produce the desired results for each sprint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
68
A(n) _____ is the person responsible for the business value of the project and for deciding what work to do and in what order when using a Scrum method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
69
The most time and money should be spent on
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
70
_________ issues often occur during project execution, especially conflicts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
71
_____ the project includes work required to introduce any new hardware, software, and procedures into normal operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
72
The _____ is a very important tool in project management because it provides the basis for deciding how to do the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
73
A risk register is the output of _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
74
What is a methodology and what are some methodologies other than the PMBOK Guide do organizations use as a basis for project management methodology?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
75
_____ is a project management methodology that defines 45 separate subprocesses and organizes these into eight process groups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
76
A(n) _____ describes how things should be done.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
77
A(n) _____ is a set period of time, normally two to four weeks, during which specific work must be completed and made ready for review when using Scrum methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
78
In Scrum, a(n) _____ is a useful object created by people.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
79
A(n) _____ is a document that includes stakeholders' roles, names, organizations, and contact information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
80
A(n) _____ is the person who ensures that the team is productive, facilitates the daily Scrum, enables close cooperation across all roles and functions, and removes barriers that prevent the team from being effective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.