Deck 7: Operational and Post Implementation

ملء الشاشة (f)
exit full mode
سؤال
The assessment of readiness should start just before the go live date.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Once the system is in the production phase, there is no further need for training.
سؤال
Training should gear up during the readiness process.
سؤال
Training for users should focus on how they will use the new system for daily processing of transactions.
سؤال
Everything should be completed and ready for testing at the first readiness checkpoint.
سؤال
There should be at least three readiness reviews before the ultimate decision to go live.
سؤال
A readiness assessment should be conducted before going live.
سؤال
The process for determining readiness consists of a series of meetings and discussions on the status of each of the area tasks.
سؤال
The readiness process will clarify what needs to be done and provide more focus for the project team.
سؤال
The readiness process should only include key "super" users.
سؤال
The stabilization period is from the go live date to about 90 days after, or until the number of issues to be fixed is reduced to a manageable number.
سؤال
Work on the system development should continue during the stabilization period.
سؤال
The readiness review status and the go live date should only be communicated to the team leads.
سؤال
Senior management should review each of the readiness assessment reports.
سؤال
It is only necessary to train the key users of the system in each functional area.
سؤال
The readiness process will focus on assessing whether the system configuration is ready for go live.
سؤال
Elaborate readiness checkpoints help insure that the go live process is smooth.
سؤال
The PMO is the Project Maintenance Office.
سؤال
If everything isn't ready by the first readiness assessment, the go live date should be pushed back.
سؤال
The ERP implementation phase is just after the go live phase.
سؤال
To better understand the effectiveness of the new ERP system, it is important to have key measurement in place after the go-live phase.
سؤال
Even though it should be conducted just-in-time, training often gets put into the post-implementation schedule because the project schedule gets compressed.
سؤال
ERP system training should focus on showing users where to point and click in the applications.
سؤال
To be effective, organizations should choose one training format and stick with it.
سؤال
The first tier of the support process usually involves a help desk or a Call Center.
سؤال
Some ERP system problems can be identified in advance but others can only be identified in real-time use of the system.
سؤال
If the ERP system is turned on for the first time on Monday and sales people cannot login to get their sales report, this would be an example of a stabilization issue that needs to be tracked and debugged.
سؤال
Training helps users interact with the ERP system while managing helps them understand how their work is related to the processes and people in other departments.
سؤال
During the stabilization period, the IT staff will be monitoring the phone lines for response times and ensure that appropriate backups are made.
سؤال
For security reasons, users should only train on the practice instance in the training labs.
سؤال
During the stabilization process, it is important to initiate all issues and track them to resolution.
سؤال
System process questions are usually handled by the vendor experts in the second tier of the support process.
سؤال
Training should be a continuous process even after the system is live.
سؤال
After the implementation, data migration must be conducted periodically to ensure that the system is being used correctly and that data entry processes are being followed.
سؤال
Tier three of the support process usually involves a combination of technical staff along with vendor support.
سؤال
A practice instance should use real data and configurations.
سؤال
Post production design is concerned with managing the daily operations of the new ERP system.
سؤال
A web-based ________ can be a good way to add support to users during the post-implementation phase.

A) order entry
B) FAQ
C) module portfolio
D) change management document
سؤال
In the parallel implementation approach, the new ERP system is operated concurrently with the competition's.
سؤال
One problem with running the old legacy system in parallel with the new ERP system is that this can lower the effort and cost required to operate the system.
سؤال
It is important that the ERP system ________ as the company grows and changes.

A) develops
B) evolves
C) decreases in scope
D) remains static
سؤال
________ should start during the readiness process and continue through stabilization through to the post production support phase.

A) Assessment
B) Training
C) Process mapping
D) Data migration
سؤال
Because it is likely that key team members will leave during the project, it is important to have a ________ plan in place.

A) functional operation
B) changes management
C) knowledge transfer
D) component mapping
سؤال
In the go live and stabilization phases, the ________ is likely to change.

A) design
B) contract
C) hardware vendor
D) team composition
سؤال
Knowledge and skill transfer should be an integral part of the ________ plan from day one.

A) integration
B) migration
C) implementation
D) development
سؤال
The ability to identify and correct bad data will be part of the ________ process.

A) design
B) stabilization
C) maintenance
D) go live
سؤال
Data validation is mostly accomplished by developing detail ________ that identify data problems within the new system.

A) scenarios
B) function modules
C) applications
D) reports
سؤال
The first task of the ________ plan should be monitoring the transition from the one phase to the other, enabling a smooth transfer of knowledge.

A) design
B) functional requirements
C) knowledge management
D) transition
E) cut-over
سؤال
When an employee leaves the company, it is important to take time to address the ________ problem.

A) awareness
B) training
C) transfer
D) configuration
سؤال
The time from the go-live date until about 90 days after is known as the ________ period.

A) stabilization
B) readiness
C) maintenance
D) post-support
سؤال
The readiness process must be planned and organized well in advance of the ________ date.

A) go-live
B) build
C) stabilization
D) system transfer
سؤال
An elaborate readiness process is considered to a(n):

A) process management scenarios.
B) change management prerequisite.
C) "best practice."
D) key project indicator.
سؤال
Making sure that users can connect to the production server from their various sites is a measure of ________ readiness.

A) design
B) post implementation
C) functional
D) technical infrastructure
سؤال
When there are large amounts of data that need to be updated, a(n) ________ should be available for this.

A) mass update process
B) ETL tool
C) data correction protocol
D) data scrubbing partner
سؤال
As time goes on, existing users and new employees will need continuous ________ on the ERP system.

A) management
B) growth
C) training
D) functional requirements
سؤال
Tracking and resolving day-to-day issues with the new ERP system is the job of the:

A) technical staff.
B) Steering Committee.
C) Project Management Office.
D) Help Desk.
سؤال
In the go-live and stabilization phases, the ________ is replaced by the Application COE.

A) legacy system
B) ERP COE
C) database
D) business process
سؤال
Having a(n) ________ will eliminate confusion, duplication, and losing data.

A) ETL tool
B) ERP system
C) centralized data repository
D) PMO
سؤال
________ systems help to streamline the process of knowledge and skill transfer.

A) Legacy
B) Knowledge management
C) Data warehouse
D) Skill transfer
سؤال
From the operational perspective, during the definition and build phases, it is important to document the ________ and how they are mapped to the ERP software.

A) legacy systems
B) functional requirements
C) databases
D) business processes
سؤال
After the ERP system goes live, the organization will need to shift into a ________ process.

A) initiation
B) implementation
C) stabilization
D) socialization
E) all of the above
سؤال
Describe some of the typical user issues and activities that may arise during the stabilization period.
سؤال
Why is training so important for ERP implementations? What are some of the ways it can be delivered?
سؤال
The help desk will enlist the support of ________ to help users across the organization.

A) consultants
B) key users
C) executives
D) consultants
E) none of the above
سؤال
The ________ process begins when the ERP system software is in production, initial training is complete and conversion of critical data is done.

A) initiation
B) stabilization
C) implementation
D) socialization
E) none of the above
سؤال
The stabilization period is characterized by ________ hours, many problems and lots of anxiety.

A) short
B) long
C) less
D) all of the above
سؤال
Go live readiness reviews involve ________ the current metrics related to what remains to be completed.

A) documenting
B) purchasing
C) outsourcing
D) refining
سؤال
With the second and subsequent readiness reviews, the ________ should be assessed to see if it is still feasible.

A) statement of intent
B) scope document
C) go-live date
D) functional requirements document
سؤال
The go live ________ process will clarify the progress towards completing the activities and identify the major issues on which to focus before going live.

A) development
B) readiness
C) outsourcing
D) integration
E) data migration
سؤال
Most user problems with the new ERP system are due to a lack of understanding of the system and how business ________ interact with the system.

A) processes
B) people
C) data
D) software
E) all of the above
سؤال
Basic problems, such as password problems or user access, are usually handled by the ________ tier of the support process.

A) top
B) executive
C) attorney
D) first
E) none of the above
سؤال
What is the difference between ERP training and education? What is the cause of most of the issues in ERP implementations?
سؤال
________ is usually the first activity to be cut when an ERP project goes over budget.

A) Managing
B) Consulting
C) Designing
D) Training
E) none of the above
سؤال
What is the post product support phase? Describe some of the activities that must occur here.
سؤال
Most issues during and after an ERP implementation are related to ________ and culture.

A) software
B) hardware
C) people
D) data
E) none of the above
سؤال
Users may be frustrated with the new ERP system because activities that were simple to do in the old legacy system now seem much ________ in the new system.

A) easier
B) faster
C) more complex
D) cheaper
E) none of the above
سؤال
To make sure that it receives adequate funding and room in the project schedule, training should be endorsed by ________ management.

A) senior
B) operational
C) lower level
D) casual
E) none of the above
سؤال
Training must be provided to the system users using ________ and examples.

A) DVDs
B) real data
C) applications
D) practice systems
سؤال
What is the stabilization process? Why is it so critical?
سؤال
During the stabilization period, subject matter experts should be prepared to help ________ from their departments to learn to use the system.

A) consultants
B) users
C) attorneys
D) vendors
E) none of the above
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/83
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Operational and Post Implementation
1
The assessment of readiness should start just before the go live date.
False
2
Once the system is in the production phase, there is no further need for training.
False
3
Training should gear up during the readiness process.
True
4
Training for users should focus on how they will use the new system for daily processing of transactions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
5
Everything should be completed and ready for testing at the first readiness checkpoint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
6
There should be at least three readiness reviews before the ultimate decision to go live.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
7
A readiness assessment should be conducted before going live.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
8
The process for determining readiness consists of a series of meetings and discussions on the status of each of the area tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
9
The readiness process will clarify what needs to be done and provide more focus for the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
10
The readiness process should only include key "super" users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
11
The stabilization period is from the go live date to about 90 days after, or until the number of issues to be fixed is reduced to a manageable number.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
12
Work on the system development should continue during the stabilization period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
13
The readiness review status and the go live date should only be communicated to the team leads.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
14
Senior management should review each of the readiness assessment reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
15
It is only necessary to train the key users of the system in each functional area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
16
The readiness process will focus on assessing whether the system configuration is ready for go live.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
17
Elaborate readiness checkpoints help insure that the go live process is smooth.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
18
The PMO is the Project Maintenance Office.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
19
If everything isn't ready by the first readiness assessment, the go live date should be pushed back.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
20
The ERP implementation phase is just after the go live phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
21
To better understand the effectiveness of the new ERP system, it is important to have key measurement in place after the go-live phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
22
Even though it should be conducted just-in-time, training often gets put into the post-implementation schedule because the project schedule gets compressed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
23
ERP system training should focus on showing users where to point and click in the applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
24
To be effective, organizations should choose one training format and stick with it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
25
The first tier of the support process usually involves a help desk or a Call Center.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
26
Some ERP system problems can be identified in advance but others can only be identified in real-time use of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
27
If the ERP system is turned on for the first time on Monday and sales people cannot login to get their sales report, this would be an example of a stabilization issue that needs to be tracked and debugged.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
28
Training helps users interact with the ERP system while managing helps them understand how their work is related to the processes and people in other departments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
29
During the stabilization period, the IT staff will be monitoring the phone lines for response times and ensure that appropriate backups are made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
30
For security reasons, users should only train on the practice instance in the training labs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
31
During the stabilization process, it is important to initiate all issues and track them to resolution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
32
System process questions are usually handled by the vendor experts in the second tier of the support process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
33
Training should be a continuous process even after the system is live.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
34
After the implementation, data migration must be conducted periodically to ensure that the system is being used correctly and that data entry processes are being followed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
35
Tier three of the support process usually involves a combination of technical staff along with vendor support.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
36
A practice instance should use real data and configurations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
37
Post production design is concerned with managing the daily operations of the new ERP system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
38
A web-based ________ can be a good way to add support to users during the post-implementation phase.

A) order entry
B) FAQ
C) module portfolio
D) change management document
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
39
In the parallel implementation approach, the new ERP system is operated concurrently with the competition's.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
40
One problem with running the old legacy system in parallel with the new ERP system is that this can lower the effort and cost required to operate the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
41
It is important that the ERP system ________ as the company grows and changes.

A) develops
B) evolves
C) decreases in scope
D) remains static
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
42
________ should start during the readiness process and continue through stabilization through to the post production support phase.

A) Assessment
B) Training
C) Process mapping
D) Data migration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
43
Because it is likely that key team members will leave during the project, it is important to have a ________ plan in place.

A) functional operation
B) changes management
C) knowledge transfer
D) component mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
44
In the go live and stabilization phases, the ________ is likely to change.

A) design
B) contract
C) hardware vendor
D) team composition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
45
Knowledge and skill transfer should be an integral part of the ________ plan from day one.

A) integration
B) migration
C) implementation
D) development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
46
The ability to identify and correct bad data will be part of the ________ process.

A) design
B) stabilization
C) maintenance
D) go live
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
47
Data validation is mostly accomplished by developing detail ________ that identify data problems within the new system.

A) scenarios
B) function modules
C) applications
D) reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
48
The first task of the ________ plan should be monitoring the transition from the one phase to the other, enabling a smooth transfer of knowledge.

A) design
B) functional requirements
C) knowledge management
D) transition
E) cut-over
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
49
When an employee leaves the company, it is important to take time to address the ________ problem.

A) awareness
B) training
C) transfer
D) configuration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
50
The time from the go-live date until about 90 days after is known as the ________ period.

A) stabilization
B) readiness
C) maintenance
D) post-support
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
51
The readiness process must be planned and organized well in advance of the ________ date.

A) go-live
B) build
C) stabilization
D) system transfer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
52
An elaborate readiness process is considered to a(n):

A) process management scenarios.
B) change management prerequisite.
C) "best practice."
D) key project indicator.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
53
Making sure that users can connect to the production server from their various sites is a measure of ________ readiness.

A) design
B) post implementation
C) functional
D) technical infrastructure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
54
When there are large amounts of data that need to be updated, a(n) ________ should be available for this.

A) mass update process
B) ETL tool
C) data correction protocol
D) data scrubbing partner
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
55
As time goes on, existing users and new employees will need continuous ________ on the ERP system.

A) management
B) growth
C) training
D) functional requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
56
Tracking and resolving day-to-day issues with the new ERP system is the job of the:

A) technical staff.
B) Steering Committee.
C) Project Management Office.
D) Help Desk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
57
In the go-live and stabilization phases, the ________ is replaced by the Application COE.

A) legacy system
B) ERP COE
C) database
D) business process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
58
Having a(n) ________ will eliminate confusion, duplication, and losing data.

A) ETL tool
B) ERP system
C) centralized data repository
D) PMO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
59
________ systems help to streamline the process of knowledge and skill transfer.

A) Legacy
B) Knowledge management
C) Data warehouse
D) Skill transfer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
60
From the operational perspective, during the definition and build phases, it is important to document the ________ and how they are mapped to the ERP software.

A) legacy systems
B) functional requirements
C) databases
D) business processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
61
After the ERP system goes live, the organization will need to shift into a ________ process.

A) initiation
B) implementation
C) stabilization
D) socialization
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
62
Describe some of the typical user issues and activities that may arise during the stabilization period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
63
Why is training so important for ERP implementations? What are some of the ways it can be delivered?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
64
The help desk will enlist the support of ________ to help users across the organization.

A) consultants
B) key users
C) executives
D) consultants
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
65
The ________ process begins when the ERP system software is in production, initial training is complete and conversion of critical data is done.

A) initiation
B) stabilization
C) implementation
D) socialization
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
66
The stabilization period is characterized by ________ hours, many problems and lots of anxiety.

A) short
B) long
C) less
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
67
Go live readiness reviews involve ________ the current metrics related to what remains to be completed.

A) documenting
B) purchasing
C) outsourcing
D) refining
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
68
With the second and subsequent readiness reviews, the ________ should be assessed to see if it is still feasible.

A) statement of intent
B) scope document
C) go-live date
D) functional requirements document
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
69
The go live ________ process will clarify the progress towards completing the activities and identify the major issues on which to focus before going live.

A) development
B) readiness
C) outsourcing
D) integration
E) data migration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
70
Most user problems with the new ERP system are due to a lack of understanding of the system and how business ________ interact with the system.

A) processes
B) people
C) data
D) software
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
71
Basic problems, such as password problems or user access, are usually handled by the ________ tier of the support process.

A) top
B) executive
C) attorney
D) first
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
72
What is the difference between ERP training and education? What is the cause of most of the issues in ERP implementations?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
73
________ is usually the first activity to be cut when an ERP project goes over budget.

A) Managing
B) Consulting
C) Designing
D) Training
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
74
What is the post product support phase? Describe some of the activities that must occur here.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
75
Most issues during and after an ERP implementation are related to ________ and culture.

A) software
B) hardware
C) people
D) data
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
76
Users may be frustrated with the new ERP system because activities that were simple to do in the old legacy system now seem much ________ in the new system.

A) easier
B) faster
C) more complex
D) cheaper
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
77
To make sure that it receives adequate funding and room in the project schedule, training should be endorsed by ________ management.

A) senior
B) operational
C) lower level
D) casual
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
78
Training must be provided to the system users using ________ and examples.

A) DVDs
B) real data
C) applications
D) practice systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
79
What is the stabilization process? Why is it so critical?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
80
During the stabilization period, subject matter experts should be prepared to help ________ from their departments to learn to use the system.

A) consultants
B) users
C) attorneys
D) vendors
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 83 في هذه المجموعة.