Deck 13: Systems Development: Construction, Integration and Testing, Implementation, Operation an

ملء الشاشة (f)
exit full mode
سؤال
The system construction phase follows the completion of the system investigation phase.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Perceived usefulness and perceived ease of use do not have any influence in determining whether someone will use an information system.
سؤال
Unit testing uncovers any defects in the interface between individual components of an information system.
سؤال
Virtualization has had a profound impact on the acquisition of information system hardware.
سؤال
For a small system, site preparation can be as simple as rearranging the furniture in an office to make room for a computer.
سؤال
Many companies don't announce to users that a slipstream upgrade has been made.
سؤال
In the system construction phase, determining the specific equipment needed, ordering the equipment, and receiving the equipment require a short lead time.
سؤال
Parallel start-up involves running a complete new system for one group of users while the rest of the users still run an old system.
سؤال
Pilot start-up involves running both the old and new systems for a period of time.
سؤال
An organization that writes its own program source code has a competitive advantage over other organizations.
سؤال
Software as a Service (SaaS) allows individuals and organizations to access needed software applications over the Internet.
سؤال
Volume testing and beta testing are the same processes.
سؤال
System testing is often done by independent testers who are not involved in developing program code.
سؤال
Getting the most out of a new or modified system during its operation is the most important aspect of systems operations for many organizations.
سؤال
Monitoring is the process of analyzing systems to make sure they are operating as intended.
سؤال
The eventual success of any system solely depends on how users work with it.
سؤال
User acceptance testing (UAT) is a critical activity that must be completed successfully before newly developed software can be rolled out to the market.
سؤال
Even if unit testing is successful, developers cannot assume they can combine individual components into a working system without any problems.
سؤال
The maintenance costs for legacy systems can be quite expensive.
سؤال
A slipstream upgrade is a minor upgrade-typically a code adjustment or minor bug fix.
سؤال
The process of switching from an old information system to a replacement system is called _____.

A) installation
B) conversion
C) site preparation
D) cutover
سؤال
The project milestone is the date an entire project should be completed and operational.
سؤال
The process of readying managers, decision makers, employees, system users, and stakeholders to accept and use the new system is called _____.

A) site preparation
B) phase-in approach
C) user preparation
D) user documentation
سؤال
System backup and recovery, performance, and security issues can be overlooked in the haste to develop a prototype.
سؤال
Called "on demand" computing, this approach requires an organization to:

A) pay a service provider periodically as requested by the provider.
B) pay according to all computer resources.
C) request a service provider for services well in advance of needing them.
D) pay according to the computer resources actually used.
سؤال
_____ consists of written descriptions developed for people who use a program.

A) User acceptance report
B) Technical documentation
C) User preparation plan
D) User documentation
سؤال
_____ involves testing the complete, integrated system (hardware, software, databases, people, and procedures) to validate that an information system meets all specified requirements.

A) Integration testing
B) System testing
C) Volume testing
D) User acceptance testing
سؤال
Only internal employees can perform systems review.
سؤال
Site preparation can include _____.

A) the hiring and training of information systems personnel
B) installing special wiring and air conditioning
C) readying users for a new system
D) physically placing a computer system on the site and making it operational
سؤال
A throw-away prototype can be produced in days.
سؤال
The product developer is a person who represents the project stakeholders and is responsible for communicating and aligning project priorities between the stakeholders and development team.
سؤال
Agile is better suited for developing larger information systems than smaller ones.
سؤال
_____ is also known as beta testing and application testing.

A) System testing
B) User acceptance testing
C) Unit integration testing
D) Volume testing
سؤال
A project manager must meet with stakeholders and end users on a regular basis to discuss expectations, document project success criteria, and share project results and status.
سؤال
The systems development teams for mobile devices are typically quite large.
سؤال
_____ explains the purpose of every major piece of computer code and also identifies and describes key variables.

A) Agile documentation
B) Technical documentation
C) Systems documentation
D) User documentation
سؤال
The object-oriented (OO) approach can also be used during systems analysis.
سؤال
_____ converts a system design into an operational system by acquiring and installing hardware and software, coding and testing software programs, creating and loading data into databases, and performing initial program testing.

A) System testing
B) Systems operation
C) System implementation
D) System construction
سؤال
Only select patches come from off-the-shelf software vendors.
سؤال
The goals of _____ are to determine the work load at which systems performance begins to degrade and to identify and eliminate any issues that prevent the system from reaching its required system-level performance.

A) unit testing
B) ​user acceptance testing
C) volume testing
D) integration testing
سؤال
_____ is a limited internal acceptance test where employees of a software development organization and a limited number of other "friendlies" use the software and provide feedback.

A) Gamma testing
B) Beta testing
C) Delta testing
D) Alpha testing
سؤال
In a traditional systems development life cycle (SDLC), the system construction phase follows the completion of the _____ phase when the project steering team approves of proceeding with the project.
سؤال
Which of these is a disadvantage of agile development?

A) It puts applications into production later than any other approach.
B) It does not encourage teamwork and interaction between users and stakeholders.
C) It requires a larger percentage of stakeholders' and?users' time than other approaches.
D) It makes it difficult to produce documentation of project tasks.
سؤال
A _____ is a detailed description of when project activities are performed.

A) project critical path
B) project deadline
C) project schedule
D) project milestone
سؤال
The temptation to add more features and functionality to the original range of the system is called _____.

A) unit testing
B) site preparation
C) cutover
D) scope creep
سؤال
_____ involves running a complete new system for one group of users rather than all users.

A) Phase-in approach
B) Parallel start-up
C) Cutover
D) Pilot start-up
سؤال
A(n) _____ is a formal agreement that a user signs stating that a phase of the installation or the complete system is approved.
سؤال
Which of these is an advantage of prototyping?

A) Users can try the system and provide constructive feedback during development.
B) Formal end-of-phase reviews take place systematically.
C) ​System documentation is always complete because the primary focus is on development of a prototype.
D) There is a lot of attention given to system backup and recovery, performance, and security.
سؤال
A new _____ is a major program change, typically encompassing many new features.

A) release
B) patch
C) slipstream upgrade
D) version
سؤال
_____ includes written details that computer operators follow to execute a program and that analysts and programmers use to solve problems or modify the program.
سؤال
_____ is an iterative system development process that develops a system in "sprint" increments lasting from two weeks to two months.

A) Prototyping
B) Object-oriented development
C) Individual development
D) Agile development
سؤال
_____ is the creation, modification, or extension of software by people who are nonprofessional software developers.

A) Mobile application development
B) Object-oriented systems development
C) User-oriented systems development
D) End-user systems development
سؤال
A _____ is a minor change to correct a problem or make a small enhancement.

A) patch
B) slipstream upgrade
C) version
D) release
سؤال
_____ involves using a new or modified system under all kinds of operating conditions.

A) Systems operation
B) System construction
C) Systems review
D) Systems modification
سؤال
A _____ is a critical date for completing a major part of a project, such as program design, coding, testing, and cutover.

A) project milestone
B) project deadline
C) project schedule
D) project due-date
سؤال
Testing that ideally forces an individual program to execute all of its various functions and user features is known as _____.

A) system testing
B) unit testing
C) acceptance testing
D) integration testing
سؤال
_____ involves linking all individual components together and testing them as a group to uncover any defects between individual components.
سؤال
Which of the following statements is true of user acceptance testing (UAT)?

A) UAT involves linking individual components together and testing them as a group to uncover any defects in the interface.
B) A goal of UAT is to determine the work load at which systems performance begins to degrade.
C) UAT is often done by independent testers who were not involved in developing program code.
D) UAT must be completed successfully before newly developed software can be rolled out to the market.
سؤال
The _____ specifies the factors that can lead to better attitudes about the use of a new information system, along with its higher acceptance and usage.
سؤال
_____ is the process of analyzing systems to make sure they are operating as intended.

A) Systems review
B) Systems operation
C) Systems maintenance
D) System construction
سؤال
A(n) _____ consists of computer systems, manuals, people with technical expertise, and other resources needed to solve problems and give accurate answers to questions.
سؤال
The _____ approach is frequently used in the investigation, analysis, and design phases of system development.
سؤال
_____ is a formalized approach for developing a project schedule that creates three time estimates for an activity.
سؤال
_____ involves those activities that ensure the orderly dissolution of a system, including disposing of all equipment in an environmentally friendly manner, closing out contracts, and safely migrating information from the system to another system or archiving it in accordance with applicable records management policies.
سؤال
In systems development, the _____ consists of all activities that, if delayed, would delay the entire project.
سؤال
The _____ is an iterative systems development approach developed by IBM that includes a number of tools and techniques that are typically tailored to fit the needs of a specific company or organization.
سؤال
_____ involves measuring system performance by tracking the number of errors encountered, the amount of memory required, the amount of processing or CPU time needed, and other performance indicators.
سؤال
A(n) _____ is a person who coordinates all scrum activities.
سؤال
A new _____ is a significant program change that often requires changes in the documentation of the software.
سؤال
_____ is a method employed to keep the agile system development effort focused and moving quickly.
سؤال
A(n) _____ is a graphical tool used for planning, monitoring, and coordinating projects.
سؤال
_____ is the process of physically placing a computer equipment on a site and making it operational.
سؤال
_____ is the process of readying managers, decision makers, employees, system users, and stakeholders to accept and use a new system.
سؤال
_____ involves running both the old and new systems for a period of time and closely comparing the output of the new system with the output of the old system.
سؤال
_____ requires a larger percentage of stakeholders' and users' time than other systems development life cycle (SDLC).
سؤال
_____ is an approach to writing code that promotes incremental development of a system using short development cycles to improve productivity and to accommodate new customer requirements.
سؤال
_____ is a stage of systems development that involves changing and enhancing the system to make it more useful in achieving user and organizational goals.
سؤال
_____ is the process of analyzing systems to make sure they are operating as intended.
سؤال
A software _____ is a working model of a system developed to enable users to interact with it and provide feedback so developers can better understand what is needed.
سؤال
_____ proposes that every organizational system is made up of people, tasks, structure, and technology with an interaction among the four components so that any change in one of these elements will necessitate a change in the other three elements.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/85
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Systems Development: Construction, Integration and Testing, Implementation, Operation an
1
The system construction phase follows the completion of the system investigation phase.
False
2
Perceived usefulness and perceived ease of use do not have any influence in determining whether someone will use an information system.
False
3
Unit testing uncovers any defects in the interface between individual components of an information system.
False
4
Virtualization has had a profound impact on the acquisition of information system hardware.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
5
For a small system, site preparation can be as simple as rearranging the furniture in an office to make room for a computer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
6
Many companies don't announce to users that a slipstream upgrade has been made.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
7
In the system construction phase, determining the specific equipment needed, ordering the equipment, and receiving the equipment require a short lead time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
8
Parallel start-up involves running a complete new system for one group of users while the rest of the users still run an old system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
9
Pilot start-up involves running both the old and new systems for a period of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
10
An organization that writes its own program source code has a competitive advantage over other organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
11
Software as a Service (SaaS) allows individuals and organizations to access needed software applications over the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
12
Volume testing and beta testing are the same processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
13
System testing is often done by independent testers who are not involved in developing program code.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
14
Getting the most out of a new or modified system during its operation is the most important aspect of systems operations for many organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
15
Monitoring is the process of analyzing systems to make sure they are operating as intended.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
16
The eventual success of any system solely depends on how users work with it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
17
User acceptance testing (UAT) is a critical activity that must be completed successfully before newly developed software can be rolled out to the market.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
18
Even if unit testing is successful, developers cannot assume they can combine individual components into a working system without any problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
19
The maintenance costs for legacy systems can be quite expensive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
20
A slipstream upgrade is a minor upgrade-typically a code adjustment or minor bug fix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
21
The process of switching from an old information system to a replacement system is called _____.

A) installation
B) conversion
C) site preparation
D) cutover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
22
The project milestone is the date an entire project should be completed and operational.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
23
The process of readying managers, decision makers, employees, system users, and stakeholders to accept and use the new system is called _____.

A) site preparation
B) phase-in approach
C) user preparation
D) user documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
24
System backup and recovery, performance, and security issues can be overlooked in the haste to develop a prototype.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
25
Called "on demand" computing, this approach requires an organization to:

A) pay a service provider periodically as requested by the provider.
B) pay according to all computer resources.
C) request a service provider for services well in advance of needing them.
D) pay according to the computer resources actually used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
26
_____ consists of written descriptions developed for people who use a program.

A) User acceptance report
B) Technical documentation
C) User preparation plan
D) User documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
27
_____ involves testing the complete, integrated system (hardware, software, databases, people, and procedures) to validate that an information system meets all specified requirements.

A) Integration testing
B) System testing
C) Volume testing
D) User acceptance testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
28
Only internal employees can perform systems review.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
29
Site preparation can include _____.

A) the hiring and training of information systems personnel
B) installing special wiring and air conditioning
C) readying users for a new system
D) physically placing a computer system on the site and making it operational
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
30
A throw-away prototype can be produced in days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
31
The product developer is a person who represents the project stakeholders and is responsible for communicating and aligning project priorities between the stakeholders and development team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
32
Agile is better suited for developing larger information systems than smaller ones.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
33
_____ is also known as beta testing and application testing.

A) System testing
B) User acceptance testing
C) Unit integration testing
D) Volume testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
34
A project manager must meet with stakeholders and end users on a regular basis to discuss expectations, document project success criteria, and share project results and status.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
35
The systems development teams for mobile devices are typically quite large.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
36
_____ explains the purpose of every major piece of computer code and also identifies and describes key variables.

A) Agile documentation
B) Technical documentation
C) Systems documentation
D) User documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
37
The object-oriented (OO) approach can also be used during systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
38
_____ converts a system design into an operational system by acquiring and installing hardware and software, coding and testing software programs, creating and loading data into databases, and performing initial program testing.

A) System testing
B) Systems operation
C) System implementation
D) System construction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
39
Only select patches come from off-the-shelf software vendors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
40
The goals of _____ are to determine the work load at which systems performance begins to degrade and to identify and eliminate any issues that prevent the system from reaching its required system-level performance.

A) unit testing
B) ​user acceptance testing
C) volume testing
D) integration testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
41
_____ is a limited internal acceptance test where employees of a software development organization and a limited number of other "friendlies" use the software and provide feedback.

A) Gamma testing
B) Beta testing
C) Delta testing
D) Alpha testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
42
In a traditional systems development life cycle (SDLC), the system construction phase follows the completion of the _____ phase when the project steering team approves of proceeding with the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of these is a disadvantage of agile development?

A) It puts applications into production later than any other approach.
B) It does not encourage teamwork and interaction between users and stakeholders.
C) It requires a larger percentage of stakeholders' and?users' time than other approaches.
D) It makes it difficult to produce documentation of project tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
44
A _____ is a detailed description of when project activities are performed.

A) project critical path
B) project deadline
C) project schedule
D) project milestone
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
45
The temptation to add more features and functionality to the original range of the system is called _____.

A) unit testing
B) site preparation
C) cutover
D) scope creep
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
46
_____ involves running a complete new system for one group of users rather than all users.

A) Phase-in approach
B) Parallel start-up
C) Cutover
D) Pilot start-up
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
47
A(n) _____ is a formal agreement that a user signs stating that a phase of the installation or the complete system is approved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of these is an advantage of prototyping?

A) Users can try the system and provide constructive feedback during development.
B) Formal end-of-phase reviews take place systematically.
C) ​System documentation is always complete because the primary focus is on development of a prototype.
D) There is a lot of attention given to system backup and recovery, performance, and security.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
49
A new _____ is a major program change, typically encompassing many new features.

A) release
B) patch
C) slipstream upgrade
D) version
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
50
_____ includes written details that computer operators follow to execute a program and that analysts and programmers use to solve problems or modify the program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
51
_____ is an iterative system development process that develops a system in "sprint" increments lasting from two weeks to two months.

A) Prototyping
B) Object-oriented development
C) Individual development
D) Agile development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
52
_____ is the creation, modification, or extension of software by people who are nonprofessional software developers.

A) Mobile application development
B) Object-oriented systems development
C) User-oriented systems development
D) End-user systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
53
A _____ is a minor change to correct a problem or make a small enhancement.

A) patch
B) slipstream upgrade
C) version
D) release
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
54
_____ involves using a new or modified system under all kinds of operating conditions.

A) Systems operation
B) System construction
C) Systems review
D) Systems modification
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
55
A _____ is a critical date for completing a major part of a project, such as program design, coding, testing, and cutover.

A) project milestone
B) project deadline
C) project schedule
D) project due-date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
56
Testing that ideally forces an individual program to execute all of its various functions and user features is known as _____.

A) system testing
B) unit testing
C) acceptance testing
D) integration testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
57
_____ involves linking all individual components together and testing them as a group to uncover any defects between individual components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following statements is true of user acceptance testing (UAT)?

A) UAT involves linking individual components together and testing them as a group to uncover any defects in the interface.
B) A goal of UAT is to determine the work load at which systems performance begins to degrade.
C) UAT is often done by independent testers who were not involved in developing program code.
D) UAT must be completed successfully before newly developed software can be rolled out to the market.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
59
The _____ specifies the factors that can lead to better attitudes about the use of a new information system, along with its higher acceptance and usage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
60
_____ is the process of analyzing systems to make sure they are operating as intended.

A) Systems review
B) Systems operation
C) Systems maintenance
D) System construction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
61
A(n) _____ consists of computer systems, manuals, people with technical expertise, and other resources needed to solve problems and give accurate answers to questions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
62
The _____ approach is frequently used in the investigation, analysis, and design phases of system development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
63
_____ is a formalized approach for developing a project schedule that creates three time estimates for an activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
64
_____ involves those activities that ensure the orderly dissolution of a system, including disposing of all equipment in an environmentally friendly manner, closing out contracts, and safely migrating information from the system to another system or archiving it in accordance with applicable records management policies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
65
In systems development, the _____ consists of all activities that, if delayed, would delay the entire project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
66
The _____ is an iterative systems development approach developed by IBM that includes a number of tools and techniques that are typically tailored to fit the needs of a specific company or organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
67
_____ involves measuring system performance by tracking the number of errors encountered, the amount of memory required, the amount of processing or CPU time needed, and other performance indicators.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
68
A(n) _____ is a person who coordinates all scrum activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
69
A new _____ is a significant program change that often requires changes in the documentation of the software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
70
_____ is a method employed to keep the agile system development effort focused and moving quickly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
71
A(n) _____ is a graphical tool used for planning, monitoring, and coordinating projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
72
_____ is the process of physically placing a computer equipment on a site and making it operational.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
73
_____ is the process of readying managers, decision makers, employees, system users, and stakeholders to accept and use a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
74
_____ involves running both the old and new systems for a period of time and closely comparing the output of the new system with the output of the old system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
75
_____ requires a larger percentage of stakeholders' and users' time than other systems development life cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
76
_____ is an approach to writing code that promotes incremental development of a system using short development cycles to improve productivity and to accommodate new customer requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
77
_____ is a stage of systems development that involves changing and enhancing the system to make it more useful in achieving user and organizational goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
78
_____ is the process of analyzing systems to make sure they are operating as intended.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
79
A software _____ is a working model of a system developed to enable users to interact with it and provide feedback so developers can better understand what is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
80
_____ proposes that every organizational system is made up of people, tasks, structure, and technology with an interaction among the four components so that any change in one of these elements will necessitate a change in the other three elements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 85 في هذه المجموعة.