Deck 6: Getting to a Contract

ملء الشاشة (f)
exit full mode
سؤال
A request for quotation may be used as a preliminary step when negotiation is anticipated.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Standing offers are typically open for a short period.
سؤال
What consequences result from tender documents that place risks on parties not well positioned to deal with those risks?
سؤال
If an owner wants to negotiate with bidders after bids have been submitted, what steps should be taken?
سؤال
In which of the following project delivery models is the contractor most involved throughout the entire life of the project?

A) design-bid-build
B) design-build
C) design-build-operate-finance
D) construction management
سؤال
An owner urgently wants to select a contractor. However, the project details have not been finalized. Therefore, the owner wants to have a few contractors give rough price estimates, and then enter into negotiations with one or more of them. What type of delivery system is most appropriate for this situation?

A) request for qualifications
B) invitation to tender
C) request for quotation
D) request for standing offer
سؤال
A large private developer anticipates a complicated multi-stage residential development to be implemented over a six-year period. It is important that a good working relationship exist between the owner and the contractor because the owner wishes to have a single contractor for all stages. What type of delivery system is most appropriate for this situation?

A) request for qualifications
B) invitation to tender
C) request for quotation
D) request for standing offer
سؤال
Which of the following is good practice for an owner awarding a contract?

A) seeking clarity from a bidder regarding an ambiguity in a bid before awarding the contract
B) awarding the contract based on criteria not stated in the invitation for tenders
C) accepting a bid that does not comply with all the mandatory criteria stated in the invitation for tenders
D) refusing to negotiate with any bidders
سؤال
Which of the following models for project delivery would be inappropriate for a single residence project?

A) design-bid-build
B) design-build
C) design-build-operate
D) construction management
سؤال
If a call for tenders specifically requires that certain work be subcontracted out, and that the names of subcontractors that the contractor intends to use be given in the tender, why might a contractor intentionally omit the name of the subcontractor? What are the risks of doing this?
سؤال
An owner wants to implement a project which requires synergy between many different mechanical systems. How suitable is the construction management model of project implementation for this situation?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/11
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Getting to a Contract
1
A request for quotation may be used as a preliminary step when negotiation is anticipated.
True
2
Standing offers are typically open for a short period.
False
3
What consequences result from tender documents that place risks on parties not well positioned to deal with those risks?
The prices submitted by tenderers will be disproportionately high compared to the risk they are required to bear. Potential bidders will be discouraged from submitting bids.
4
If an owner wants to negotiate with bidders after bids have been submitted, what steps should be taken?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
5
In which of the following project delivery models is the contractor most involved throughout the entire life of the project?

A) design-bid-build
B) design-build
C) design-build-operate-finance
D) construction management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
6
An owner urgently wants to select a contractor. However, the project details have not been finalized. Therefore, the owner wants to have a few contractors give rough price estimates, and then enter into negotiations with one or more of them. What type of delivery system is most appropriate for this situation?

A) request for qualifications
B) invitation to tender
C) request for quotation
D) request for standing offer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
7
A large private developer anticipates a complicated multi-stage residential development to be implemented over a six-year period. It is important that a good working relationship exist between the owner and the contractor because the owner wishes to have a single contractor for all stages. What type of delivery system is most appropriate for this situation?

A) request for qualifications
B) invitation to tender
C) request for quotation
D) request for standing offer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is good practice for an owner awarding a contract?

A) seeking clarity from a bidder regarding an ambiguity in a bid before awarding the contract
B) awarding the contract based on criteria not stated in the invitation for tenders
C) accepting a bid that does not comply with all the mandatory criteria stated in the invitation for tenders
D) refusing to negotiate with any bidders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following models for project delivery would be inappropriate for a single residence project?

A) design-bid-build
B) design-build
C) design-build-operate
D) construction management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
10
If a call for tenders specifically requires that certain work be subcontracted out, and that the names of subcontractors that the contractor intends to use be given in the tender, why might a contractor intentionally omit the name of the subcontractor? What are the risks of doing this?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
11
An owner wants to implement a project which requires synergy between many different mechanical systems. How suitable is the construction management model of project implementation for this situation?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 11 في هذه المجموعة.