Deck 15: Understanding Contracts and Contractors

ملء الشاشة (f)
exit full mode
سؤال
Usually, the prime contractor retains full responsibility for management and control of the project, even the subcontractors.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
It is not wise or common to put agreements between parties in written form.
سؤال
When using competitive bidding, firms that are not financially astute are easily identified because their bids are significantly higher or lower than the majority.
سؤال
Occasionally, a landscape contractor may be selected to build a landscape without competitive bidding because of close proximity to the project site.
سؤال
Even though the landscape architect is the principal professional on the project, the client may take responsibility for selecting the landscaping contracting firm.
سؤال
The direct solicitation of a landscape company to accomplish a project is more common to residential projects than to commercial projects.
سؤال
The negotiated contract is the preferred method of doing business because it clarifies and eliminates uncertainty before construction begins.
سؤال
Safeguards such as prequalification of bidders seek to guarantee that the lowest bidder is an expert and financially capable of completing the project.
سؤال
Firms are rarely chosen because of their professional reputation in a market region.
سؤال
It can be the responsibility of the landscape architect to prepare detailed construction drawings and written specifications for every aspect of the job.
سؤال
In the building trades, how are most general contracts awarded?

A) government contracts
B) competitive bidding
C) grants
D) noncompetitive bids
سؤال
Which of the following is not a common reason that some landscape contractors receive work without going through the bidding process?

A) past projects
B) firm reputation
C) new in the marketplace
D) proximity to the project site
سؤال
Who enjoys both the greatest advantages and disadvantages of competitive bidding?

A) designer
B) contractor
C) material supplier
D) client
سؤال
In competitive bidding, which bid is usually the one that gets accepted?

A) lowest of all submitted bids
B) the median bid submitted
C) lowest that does not exceed the client's budget
D) the firm with best reputation
سؤال
Rather than waiting for the telephone to ring or customers to walk through the door, how may a firm seek new clients?

A) media advertising
B) blanket mailings
C) exhibits at flower shows
D) All answers are correct
سؤال
What party in a contract owns and provides financing for a project?

A) client
B) banks
C) architect
D) attorney
سؤال
What party in a contract would be accountable to the holder of the prime contract?

A) designers
B) bank
C) regulators
D) subcontractors
سؤال
Which one of the choices is NOT a way that landscape contractors can obtain work?

A) direct solicitation of clients
B) competitive bidding
C) selection through lottery
D) noncompetitive bidding
سؤال
Of the firms listed, which one is most likely to be directly accountable to the owner of the project?

A) general contract or prime contract holder
B) subcontractor
C) material and supply contractor
D) design contractor
سؤال
The subcontractor and prime contractor enter into a relationship known as a ____________________.
سؤال
Owners of private projects may seek bids by extending _________________________ to contractors who have the capability to do the work.
سؤال
When a client chooses to have prime contract relationships with multiple professionals, one of the prime contractors will be designated as the ____________________ to ensure that the project runs smoothly.
سؤال
When a landscape company receives an offer of work through direct solicitation, it was the ____________________ who initiated the contact.
سؤال
A landscape company that did a mass mailing of brochures describing their services to every home owner in a suburban development would be using ____________________ to generate new jobs.
سؤال
When a project is being done in the public sector, the law usually requires ____________________ bidding as the means by which contractors are chosen.
سؤال
A written contract must contain the names of the parties, their signatures, and the ____________________ of their signing.
سؤال
The responsibility for the satisfactory performance of a subcontractor on a project rests with the ____________________ contractor.
سؤال
If a landscape architect was hired by an engineering firm to provide the landscape plans for a large government site, the role of the landscape contractor would be that of a ____________________.
سؤال
A published invitation to bid is used in competitive bidding for ____________________ projects more than residential projects.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/29
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Understanding Contracts and Contractors
1
Usually, the prime contractor retains full responsibility for management and control of the project, even the subcontractors.
True
2
It is not wise or common to put agreements between parties in written form.
False
3
When using competitive bidding, firms that are not financially astute are easily identified because their bids are significantly higher or lower than the majority.
True
4
Occasionally, a landscape contractor may be selected to build a landscape without competitive bidding because of close proximity to the project site.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
5
Even though the landscape architect is the principal professional on the project, the client may take responsibility for selecting the landscaping contracting firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
6
The direct solicitation of a landscape company to accomplish a project is more common to residential projects than to commercial projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
7
The negotiated contract is the preferred method of doing business because it clarifies and eliminates uncertainty before construction begins.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
8
Safeguards such as prequalification of bidders seek to guarantee that the lowest bidder is an expert and financially capable of completing the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
9
Firms are rarely chosen because of their professional reputation in a market region.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
10
It can be the responsibility of the landscape architect to prepare detailed construction drawings and written specifications for every aspect of the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
11
In the building trades, how are most general contracts awarded?

A) government contracts
B) competitive bidding
C) grants
D) noncompetitive bids
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following is not a common reason that some landscape contractors receive work without going through the bidding process?

A) past projects
B) firm reputation
C) new in the marketplace
D) proximity to the project site
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
13
Who enjoys both the greatest advantages and disadvantages of competitive bidding?

A) designer
B) contractor
C) material supplier
D) client
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
14
In competitive bidding, which bid is usually the one that gets accepted?

A) lowest of all submitted bids
B) the median bid submitted
C) lowest that does not exceed the client's budget
D) the firm with best reputation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
15
Rather than waiting for the telephone to ring or customers to walk through the door, how may a firm seek new clients?

A) media advertising
B) blanket mailings
C) exhibits at flower shows
D) All answers are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
16
What party in a contract owns and provides financing for a project?

A) client
B) banks
C) architect
D) attorney
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
17
What party in a contract would be accountable to the holder of the prime contract?

A) designers
B) bank
C) regulators
D) subcontractors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which one of the choices is NOT a way that landscape contractors can obtain work?

A) direct solicitation of clients
B) competitive bidding
C) selection through lottery
D) noncompetitive bidding
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
19
Of the firms listed, which one is most likely to be directly accountable to the owner of the project?

A) general contract or prime contract holder
B) subcontractor
C) material and supply contractor
D) design contractor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
20
The subcontractor and prime contractor enter into a relationship known as a ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
21
Owners of private projects may seek bids by extending _________________________ to contractors who have the capability to do the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
22
When a client chooses to have prime contract relationships with multiple professionals, one of the prime contractors will be designated as the ____________________ to ensure that the project runs smoothly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
23
When a landscape company receives an offer of work through direct solicitation, it was the ____________________ who initiated the contact.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
24
A landscape company that did a mass mailing of brochures describing their services to every home owner in a suburban development would be using ____________________ to generate new jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
25
When a project is being done in the public sector, the law usually requires ____________________ bidding as the means by which contractors are chosen.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
26
A written contract must contain the names of the parties, their signatures, and the ____________________ of their signing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
27
The responsibility for the satisfactory performance of a subcontractor on a project rests with the ____________________ contractor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
28
If a landscape architect was hired by an engineering firm to provide the landscape plans for a large government site, the role of the landscape contractor would be that of a ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
29
A published invitation to bid is used in competitive bidding for ____________________ projects more than residential projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.