Deck 12: Implementation and Performance

ملء الشاشة (f)
exit full mode
سؤال
What is partial preemption?

A) the decision of an individual to divulge details about the behavior of other members of his or her organization who might be in violation of the law
B) the decision by a higher level of government that, if a lower government does not meet predetermined standards, then the higher level of government will step in and administer that program itself
C) punishments incurred by a program that were caused by failures to meet another program's standards
D) refusal by the president to spend money appropriated by Congress
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Determining whether a program is working or not is sometimes difficult because ______.

A) legislators do not provide funding to find out
B) success does not matter as long as there is funding
C) program objectives and goals are not always clear
D) legislators provide more funding for simply creating new programs
سؤال
According to the author, which one of the following organizational pathologies may NOT contribute to implementation performance problems?

A) mixing missions
B) budget under runs
C) unsympathetic staff
D) assigning similar programs to different agencies
سؤال
Concerns about the execution of laws fostered the beginning of a new field of study called ______.

A) implementation
B) formulation
C) execution
D) research methods
سؤال
All of the following factors can hinder successful implementation EXCEPT ______.

A) certainty
B) practical uncertainty
C) inadequate resources
D) uneven leadership
سؤال
Implementation analysts tend to think that the more complicated and interwoven programs are ______.

A) the easier they are to assess for implementation success
B) the more likely they are to fail
C) the more likely that additional funding with be made available
D) there is no net effect
سؤال
Which of the following applications of results-based management combined rapid-response performance results and budgetary decisions?

A) whistle-blowing
B) CompStat
C) CitiStat
D) partial preemption
سؤال
With regard to performance, resource adequacy pertains to include both ______.

A) budgetary means and workers
B) shelter and flexibility
C) shelter and power
D) budgetary means and flexibility
سؤال
Effective steering of program implementation hinges most fundamentally on what?

A) obtaining crossover sanctions
B) utilizing partial preemption
C) receiving good feedback
D) disbursing categorical grants
سؤال
Receiving good feedback is crucial for ______.

A) offering grantsmanship
B) utilizing partial preemption
C) obtaining crossover sanctions
D) effectively steering program implementation
سؤال
The study of implementation seems to presume what status about programs?

A) failure
B) success
C) change
D) longevity
سؤال
Of the following choices, one advantage of contracting out government work is ______.

A) less red tape
B) the ease of levying sanctions
C) less corruption
D) increased levels of accountability
سؤال
Which of the following methods is a way to feedback on program effectiveness?

A) formal program evaluation
B) administration through regulation
C) administration through off-budget programs
D) mandates
سؤال
All of the following factors can hinder successful implementation EXCEPT ______.

A) program evaluation
B) practical uncertainty
C) inadequate resources
D) uneven leadership
سؤال
What is one advantage of contracting out?

A) gaining special expertise
B) the possibility of sanctions
C) less corruption
D) enhanced accountability
سؤال
CompStat, which produces weekly reports on crime in each police precinct, is an example of what approach?

A) whistle-blowing
B) backward mapping
C) results-based management
D) partial preemption
سؤال
Formal program evaluation and results-based management are examples what approach or method for management?

A) mandates
B) administration through regulation
C) administration through off-budget programs
D) methods to obtain feedback
سؤال
Which of the following describes scenarios where contract details limit the flexibility of government managers and contractors?

A) underspecification
B) overspecification
C) minutia
D) lapses
سؤال
All of the following can be major roadblocks to achieving a policymaker's outcome EXCEPT ______.

A) growing dependence on other sectors
B) inadequate resources
C) uneven leadership
D) performance-based management
سؤال
Government mandates are ______.

A) formula-based programs
B) project-based programs
C) federally imposed regulations
D) proxies
سؤال
______ occurs when the federal government presses state and local governments to implement standards.

A) Partial preemption
B) Fungibility
C) Delegation
D) Results-based management
سؤال
Government program goals can change over time.
سؤال
When Congress passes legislation that creates a new program, the laws always provide adequate money and staff to feasibly implement the program.
سؤال
According to a recent Pew survey, what percentage of Americans thought that the federal government was doing an excellent or good job?

A) 10 percent
B) 20 percent
C) 40 percent
D) 60 percent
سؤال
Jeffrey L.Pressman and Aaron B.Wildavsky argued that often government programs commence with bold objectives that the administrative process fails to realize in practice.
سؤال
Benefits of contracting out does NOT include which of the following?

A) specialized expertise
B) cost savings
C) increased spending
D) flexibility
سؤال
What method is said to be the gold standard in program evaluation?

A) quasi-experiment
B) observation-treatment-observation test
C) randomized controlled trial
D) CompStat
سؤال
Red tape is associated with which of the following?

A) a special language that appropriators use in the budget process
B) excessive rules that cause inefficiencies in government action
C) an obsolete term for government spending
D) the process for awarding government contracts
سؤال
One major standard for evaluating the effectiveness of results of government programs is ______.

A) efficiency
B) success
C) adequate resources
D) employee hires
سؤال
Implementation analysis focuses on programs and intends to understand ______.

A) how Congress could write better laws
B) how the federal government could recruit better talent
C) intricate budget processes
D) how government programs could be more successful (i.e., fail less)
سؤال
The CompStat model is an example of what type of management approach?

A) results-based management
B) effects-based management
C) responsible governance
D) failed efforts
سؤال
How does flexibility relate to contracting out?
سؤال
Governmental activities such as policymaking, budgeting, and military action are said to be ______.

A) inherently governmental
B) core activities
C) ancillary activities
D) the full Grassley
سؤال
Is contracting out always cheaper than performing the service in house?
سؤال
Implementation of federal programs never includes state and local governments.
سؤال
Government agency requirements for "ultra" equipment are often referred to as ______.

A) buying the farm
B) buying the cow
C) overspecification
D) bargaining
سؤال
Federally imposed regulations are also called ______.

A) formula-based programs
B) project-based programs
C) mandates
D) proxies
سؤال
Formal program evaluation is an ineffective method of providing regular, high-quality feedback.
سؤال
Crossover sanctions only apply within single programs.
سؤال
What is results-based management?
سؤال
How do unclear objectives affect implementation?
سؤال
According to the text, what five problems of performance may hinder a successful government program outcome?
سؤال
What is said to be the gold standard of program evaluation methods? Given the cost of government programs, is it feasible to require this evaluation for all programs?
سؤال
What three intergovernmental implementation strategies are discussed in the text?
سؤال
What are some of the advantages and disadvantages of contracting out?
سؤال
How does contracting allow for flexibility during hiring freezes?
سؤال
How does overregulation relate to contracting?
سؤال
What are formal program evaluation and results-based management? What are the main differences between these two approaches?
سؤال
Describe the CitiStat program and explain what kind of strategy it represents.How does it do so?
سؤال
Discuss the merits and drawbacks of evaluating government programs on efficiency and, by contrast, accountability.
سؤال
What is networked government?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/51
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Implementation and Performance
1
What is partial preemption?

A) the decision of an individual to divulge details about the behavior of other members of his or her organization who might be in violation of the law
B) the decision by a higher level of government that, if a lower government does not meet predetermined standards, then the higher level of government will step in and administer that program itself
C) punishments incurred by a program that were caused by failures to meet another program's standards
D) refusal by the president to spend money appropriated by Congress
B
2
Determining whether a program is working or not is sometimes difficult because ______.

A) legislators do not provide funding to find out
B) success does not matter as long as there is funding
C) program objectives and goals are not always clear
D) legislators provide more funding for simply creating new programs
C
3
According to the author, which one of the following organizational pathologies may NOT contribute to implementation performance problems?

A) mixing missions
B) budget under runs
C) unsympathetic staff
D) assigning similar programs to different agencies
B
4
Concerns about the execution of laws fostered the beginning of a new field of study called ______.

A) implementation
B) formulation
C) execution
D) research methods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
5
All of the following factors can hinder successful implementation EXCEPT ______.

A) certainty
B) practical uncertainty
C) inadequate resources
D) uneven leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
6
Implementation analysts tend to think that the more complicated and interwoven programs are ______.

A) the easier they are to assess for implementation success
B) the more likely they are to fail
C) the more likely that additional funding with be made available
D) there is no net effect
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following applications of results-based management combined rapid-response performance results and budgetary decisions?

A) whistle-blowing
B) CompStat
C) CitiStat
D) partial preemption
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
8
With regard to performance, resource adequacy pertains to include both ______.

A) budgetary means and workers
B) shelter and flexibility
C) shelter and power
D) budgetary means and flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
9
Effective steering of program implementation hinges most fundamentally on what?

A) obtaining crossover sanctions
B) utilizing partial preemption
C) receiving good feedback
D) disbursing categorical grants
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
10
Receiving good feedback is crucial for ______.

A) offering grantsmanship
B) utilizing partial preemption
C) obtaining crossover sanctions
D) effectively steering program implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
11
The study of implementation seems to presume what status about programs?

A) failure
B) success
C) change
D) longevity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
12
Of the following choices, one advantage of contracting out government work is ______.

A) less red tape
B) the ease of levying sanctions
C) less corruption
D) increased levels of accountability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following methods is a way to feedback on program effectiveness?

A) formal program evaluation
B) administration through regulation
C) administration through off-budget programs
D) mandates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
14
All of the following factors can hinder successful implementation EXCEPT ______.

A) program evaluation
B) practical uncertainty
C) inadequate resources
D) uneven leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
15
What is one advantage of contracting out?

A) gaining special expertise
B) the possibility of sanctions
C) less corruption
D) enhanced accountability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
16
CompStat, which produces weekly reports on crime in each police precinct, is an example of what approach?

A) whistle-blowing
B) backward mapping
C) results-based management
D) partial preemption
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
17
Formal program evaluation and results-based management are examples what approach or method for management?

A) mandates
B) administration through regulation
C) administration through off-budget programs
D) methods to obtain feedback
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following describes scenarios where contract details limit the flexibility of government managers and contractors?

A) underspecification
B) overspecification
C) minutia
D) lapses
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
19
All of the following can be major roadblocks to achieving a policymaker's outcome EXCEPT ______.

A) growing dependence on other sectors
B) inadequate resources
C) uneven leadership
D) performance-based management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
20
Government mandates are ______.

A) formula-based programs
B) project-based programs
C) federally imposed regulations
D) proxies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
21
______ occurs when the federal government presses state and local governments to implement standards.

A) Partial preemption
B) Fungibility
C) Delegation
D) Results-based management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
22
Government program goals can change over time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
23
When Congress passes legislation that creates a new program, the laws always provide adequate money and staff to feasibly implement the program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
24
According to a recent Pew survey, what percentage of Americans thought that the federal government was doing an excellent or good job?

A) 10 percent
B) 20 percent
C) 40 percent
D) 60 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
25
Jeffrey L.Pressman and Aaron B.Wildavsky argued that often government programs commence with bold objectives that the administrative process fails to realize in practice.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
26
Benefits of contracting out does NOT include which of the following?

A) specialized expertise
B) cost savings
C) increased spending
D) flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
27
What method is said to be the gold standard in program evaluation?

A) quasi-experiment
B) observation-treatment-observation test
C) randomized controlled trial
D) CompStat
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
28
Red tape is associated with which of the following?

A) a special language that appropriators use in the budget process
B) excessive rules that cause inefficiencies in government action
C) an obsolete term for government spending
D) the process for awarding government contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
29
One major standard for evaluating the effectiveness of results of government programs is ______.

A) efficiency
B) success
C) adequate resources
D) employee hires
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
30
Implementation analysis focuses on programs and intends to understand ______.

A) how Congress could write better laws
B) how the federal government could recruit better talent
C) intricate budget processes
D) how government programs could be more successful (i.e., fail less)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
31
The CompStat model is an example of what type of management approach?

A) results-based management
B) effects-based management
C) responsible governance
D) failed efforts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
32
How does flexibility relate to contracting out?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
33
Governmental activities such as policymaking, budgeting, and military action are said to be ______.

A) inherently governmental
B) core activities
C) ancillary activities
D) the full Grassley
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
34
Is contracting out always cheaper than performing the service in house?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
35
Implementation of federal programs never includes state and local governments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
36
Government agency requirements for "ultra" equipment are often referred to as ______.

A) buying the farm
B) buying the cow
C) overspecification
D) bargaining
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
37
Federally imposed regulations are also called ______.

A) formula-based programs
B) project-based programs
C) mandates
D) proxies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
38
Formal program evaluation is an ineffective method of providing regular, high-quality feedback.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
39
Crossover sanctions only apply within single programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
40
What is results-based management?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
41
How do unclear objectives affect implementation?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
42
According to the text, what five problems of performance may hinder a successful government program outcome?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
43
What is said to be the gold standard of program evaluation methods? Given the cost of government programs, is it feasible to require this evaluation for all programs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
44
What three intergovernmental implementation strategies are discussed in the text?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
45
What are some of the advantages and disadvantages of contracting out?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
46
How does contracting allow for flexibility during hiring freezes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
47
How does overregulation relate to contracting?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
48
What are formal program evaluation and results-based management? What are the main differences between these two approaches?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
49
Describe the CitiStat program and explain what kind of strategy it represents.How does it do so?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
50
Discuss the merits and drawbacks of evaluating government programs on efficiency and, by contrast, accountability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
51
What is networked government?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 51 في هذه المجموعة.