Deck 16: Quality Management and Testing in Software Engineering

ملء الشاشة (f)
exit full mode
سؤال
Degree to which design specifications are followed in manufacturing the product is called

A)quality control
B)quality of conformance
C)quality assurance
D)none of the mentioned
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is not an appraisal cost in SQA?

A)inter-process inspection
B)maintenance
C)quality planning
D)testing
سؤال
Who identifies, documents, and verifies that corrections have been made to the software?

A)project manager
B)project team
C)sqa group
D)all of the mentioned
سؤال
What is not included in prevention costs?

A)quality planning
B)formal technical reviews
C)test equipment
D)equipment calibration and maintenance
سؤال
Quality Management in software engineering is also known as

A)sqa
B)sqm
C)sqi
D)sqa and sqm
سؤال
Which of the following is not a core step of Six Sigma?

A)define
B)control
C)measure
D)analyse
سؤال
Non-conformance to software requirements is known as

A)software availability
B)software reliability
C)software failure
D)none of the mentioned
سؤال
What kind of quality cost is incurred when an error is detected in a product prior to shipment?

A)prevention
B)internal failure
C)external failure
D)appraisal
سؤال
The degree to which the design specifications are followed during manufacturing is known as

A)quality of design
B)quality of conformance
C)quality of testing
D)none of the mentioned
سؤال
Alpha testing is done at

A)developer?s end
B)user?s end
C)developer?s & user?s end
D)none of the mentioned
سؤال
Exhaustive testing is

A)always possible
B)practically possible
C)impractical but possible
D)impractical and impossible
سؤال
White Box techniques are also classified as

A)design based testing
B)structural testing
C)error guessing technique
D)none of the mentioned
سؤال
Which of the following term describes testing?

A)finding broken code
B)evaluating deliverable to find errors
C)a stage of all projects
D)none of the mentioned
سؤال
The testing in which code is checked

A)black box testing
B)white box testing
C)red box testing
D)green box testing
سؤال
Acceptance testing is also known as

A)grey box testing
B)white box testing
C)alpha testing
D)beta testing
سؤال
Which of the following is non-functional testing?

A)black box testing
B)performance testing
C)unit testing
D)none of the mentioned
سؤال
Beta testing is done at

A)user?s end
B)developer?s end
C)user?s & developer?s end
D)none of the mentioned
سؤال
Unit testing is done by

A)users
B)developers
C)customers
D)none of the mentioned
سؤال
Behavioral testing is

A)white box testing
B)black box testing
C)grey box testing
D)none of the mentioned
سؤال
In which testing level the focus is on customer usage?

A)alpha testing
B)beta testing
C)validation testing
D)both alpha and beta
سؤال
What is normally considered as an adjunct to the coding step

A)integration testing
B)unit testing
C)completion of testing
D)regression testing
سؤال
What is the main purpose of integration testing?

A)design errors
B)interface errors
C)procedure errors
D)none of the above
سؤال
Testing of individual components by the developers are comes under which type of testing?

A)integration testing
B)validation testing
C)unit testing
D)none of the above
سؤال
When the Testing Principles are useful while building the Software Product?

A)during testing
B)during execution
C)during review
D)throughout life-cycle
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 16: Quality Management and Testing in Software Engineering
1
Degree to which design specifications are followed in manufacturing the product is called

A)quality control
B)quality of conformance
C)quality assurance
D)none of the mentioned
quality of conformance
2
Which of the following is not an appraisal cost in SQA?

A)inter-process inspection
B)maintenance
C)quality planning
D)testing
quality planning
3
Who identifies, documents, and verifies that corrections have been made to the software?

A)project manager
B)project team
C)sqa group
D)all of the mentioned
sqa group
4
What is not included in prevention costs?

A)quality planning
B)formal technical reviews
C)test equipment
D)equipment calibration and maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
5
Quality Management in software engineering is also known as

A)sqa
B)sqm
C)sqi
D)sqa and sqm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is not a core step of Six Sigma?

A)define
B)control
C)measure
D)analyse
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
7
Non-conformance to software requirements is known as

A)software availability
B)software reliability
C)software failure
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
8
What kind of quality cost is incurred when an error is detected in a product prior to shipment?

A)prevention
B)internal failure
C)external failure
D)appraisal
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
9
The degree to which the design specifications are followed during manufacturing is known as

A)quality of design
B)quality of conformance
C)quality of testing
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
10
Alpha testing is done at

A)developer?s end
B)user?s end
C)developer?s & user?s end
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
11
Exhaustive testing is

A)always possible
B)practically possible
C)impractical but possible
D)impractical and impossible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
12
White Box techniques are also classified as

A)design based testing
B)structural testing
C)error guessing technique
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following term describes testing?

A)finding broken code
B)evaluating deliverable to find errors
C)a stage of all projects
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
14
The testing in which code is checked

A)black box testing
B)white box testing
C)red box testing
D)green box testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
15
Acceptance testing is also known as

A)grey box testing
B)white box testing
C)alpha testing
D)beta testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is non-functional testing?

A)black box testing
B)performance testing
C)unit testing
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
17
Beta testing is done at

A)user?s end
B)developer?s end
C)user?s & developer?s end
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
18
Unit testing is done by

A)users
B)developers
C)customers
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
19
Behavioral testing is

A)white box testing
B)black box testing
C)grey box testing
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
20
In which testing level the focus is on customer usage?

A)alpha testing
B)beta testing
C)validation testing
D)both alpha and beta
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
21
What is normally considered as an adjunct to the coding step

A)integration testing
B)unit testing
C)completion of testing
D)regression testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
22
What is the main purpose of integration testing?

A)design errors
B)interface errors
C)procedure errors
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
23
Testing of individual components by the developers are comes under which type of testing?

A)integration testing
B)validation testing
C)unit testing
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
24
When the Testing Principles are useful while building the Software Product?

A)during testing
B)during execution
C)during review
D)throughout life-cycle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.