Non-conformance to software requirements is known as

A)software availability
B)software reliability
C)software failure
D)none of the above.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
According to ISO 9001, inspection and testing comes under which management responsibility?

A)process control
B)document control
C)control of nonconforming products
D)servicing
سؤال
Alpha testing is done at

A)developer's end
B)user\s end
C)both a and b
D)none of the above.
سؤال
Which of the following term describes testing?

A)finding broken code
B)evaluating deliverable to ?nd errors
C)a stage of all projects
D)all of the mentioned
سؤال
Behavioral testing is

A)white box testing
B)black bozx testing
C)grey box testing
D)none of the above.
سؤال
In which testing level the focus is on customer usage?

A)alpha testing
B)beta testing
C)validation testing
D)both a and b
سؤال
Which testing is an integration testing approach that is commonly used when "shrink-wrapped" software products are being developed?

A)regression testing
B)integration testing
C)smoke testing
D)none of the above.
سؤال
Testing of individua l components by the developers are comes under which type of testing?

A)integration testing
B)validation testing
C)unit testing
D)none of the above.
سؤال
When different combination of input requires different combination of actions,Which of the following technique is used in such situation

A)boundary value analysis
B)equivalence partition
C)decision table
D)decision coverage
سؤال
Which of the following is a myth in testing?

A)tester can ?nd bugs
B)any user can test software
C)missed defects are not due to testers
D)complete testing is not possible
سؤال
ISO published the standard in __________

A)1987
B)1985
C)1890
D)1980
سؤال
-----------is theapplication of quality principles to all facets and business process of an organization.

A)tqm
B)software reliability
C)software failure
D)software testing
سؤال
.Innovation is the activity leading to changes.

A)planned
B)accidental
C)virtual
D)user
سؤال
Quality management system of a organization based on which pillars

A)test plans, test conditions & decisions
B)quality processes, guidelines and standards & formats and templates
C)quality police, objectives and manuals
D)none of the above.
سؤال
V-model uses test models

A)component testing, integration testing, system testing and acceptance testing
B)not ?x
C)alpha testing, beta testing , acceptance testing and user testing
D)black box testing, white box testing and gray box testing
سؤال
Which of the following is a principle of total quality management?

A)continuous process improvement
B)continuous productivity improvement
C)continuous value enhancement
D)continuous defect elimination
سؤال
The difference between and internal and an external customer is:

A)internal customers usually work in the business, external customers do not.
B)quality-oriented businesses care only about external customers.
C)external customers care about what they receive, internal customers do not.
D)internal customers do not evaluate quality, and external customers do.
سؤال
Costs associated with efforts to prevent errors are

A)appraisal cost
B)direct cost
C)prevention cost
D)expectedcost
سؤال
What is meant by Kaizen?

A)card signal
B)to avoid inadvertent errors
C)change for better quality
D)none of the above.
سؤال
What is the aim of fool proo?ng technique used for total quality management?

A)to achieve zero defects
B)to specify time cschedule
C)to specify targets
D)none of the aove
سؤال
ISO 14000 quality standard is related with

A)environmental management systems
B)automotive quality standards
C)eliminating poor quality
D)customer satisfaction
سؤال
What is quality assurance?

A)quality assurance deals with activities which prove that products and services meet the required quality standard
B)quality assurance deals with activities which aim at customers satisfaction
C)quality assurance deals with controlling the quality of products by inspection
D)none of the above.
سؤال
Which of the following statements is/are false?
1) Fault tree analysis method is used to determine reliability of product
2) The goal of Six Sigma is to reduce number of defects to 2.4 parts per billion
3) Six sigma is represented by normal distribution curve
4) Poka yoke is a policy which prevents occurrence of human errors

A)only statement 3
B)statement 2 and statement 3
C)only statement 2
D)statement 1, 3 and 4
سؤال
The aim of Just-In-Time manufacturing principle is to eliminate

A)time wastage
B)labour wastage
C)cost of excessive inventory
D)all of the mentioned
سؤال
To what does the ISO 9000 standards family apply?

A)calibration
B)e?ciency & productivity
C)quality system design &
D)none of the above.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Quality Management and Testing
1
Non-conformance to software requirements is known as

A)software availability
B)software reliability
C)software failure
D)none of the above.
software failure
2
According to ISO 9001, inspection and testing comes under which management responsibility?

A)process control
B)document control
C)control of nonconforming products
D)servicing
process control
3
Alpha testing is done at

A)developer's end
B)user\s end
C)both a and b
D)none of the above.
developer's end
4
Which of the following term describes testing?

A)finding broken code
B)evaluating deliverable to ?nd errors
C)a stage of all projects
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
Behavioral testing is

A)white box testing
B)black bozx testing
C)grey box testing
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
In which testing level the focus is on customer usage?

A)alpha testing
B)beta testing
C)validation testing
D)both a and b
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which testing is an integration testing approach that is commonly used when "shrink-wrapped" software products are being developed?

A)regression testing
B)integration testing
C)smoke testing
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
Testing of individua l components by the developers are comes under which type of testing?

A)integration testing
B)validation testing
C)unit testing
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
When different combination of input requires different combination of actions,Which of the following technique is used in such situation

A)boundary value analysis
B)equivalence partition
C)decision table
D)decision coverage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is a myth in testing?

A)tester can ?nd bugs
B)any user can test software
C)missed defects are not due to testers
D)complete testing is not possible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
ISO published the standard in __________

A)1987
B)1985
C)1890
D)1980
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
-----------is theapplication of quality principles to all facets and business process of an organization.

A)tqm
B)software reliability
C)software failure
D)software testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
.Innovation is the activity leading to changes.

A)planned
B)accidental
C)virtual
D)user
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
Quality management system of a organization based on which pillars

A)test plans, test conditions & decisions
B)quality processes, guidelines and standards & formats and templates
C)quality police, objectives and manuals
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
V-model uses test models

A)component testing, integration testing, system testing and acceptance testing
B)not ?x
C)alpha testing, beta testing , acceptance testing and user testing
D)black box testing, white box testing and gray box testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is a principle of total quality management?

A)continuous process improvement
B)continuous productivity improvement
C)continuous value enhancement
D)continuous defect elimination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
The difference between and internal and an external customer is:

A)internal customers usually work in the business, external customers do not.
B)quality-oriented businesses care only about external customers.
C)external customers care about what they receive, internal customers do not.
D)internal customers do not evaluate quality, and external customers do.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
Costs associated with efforts to prevent errors are

A)appraisal cost
B)direct cost
C)prevention cost
D)expectedcost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
What is meant by Kaizen?

A)card signal
B)to avoid inadvertent errors
C)change for better quality
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
What is the aim of fool proo?ng technique used for total quality management?

A)to achieve zero defects
B)to specify time cschedule
C)to specify targets
D)none of the aove
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
ISO 14000 quality standard is related with

A)environmental management systems
B)automotive quality standards
C)eliminating poor quality
D)customer satisfaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
What is quality assurance?

A)quality assurance deals with activities which prove that products and services meet the required quality standard
B)quality assurance deals with activities which aim at customers satisfaction
C)quality assurance deals with controlling the quality of products by inspection
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following statements is/are false?
1) Fault tree analysis method is used to determine reliability of product
2) The goal of Six Sigma is to reduce number of defects to 2.4 parts per billion
3) Six sigma is represented by normal distribution curve
4) Poka yoke is a policy which prevents occurrence of human errors

A)only statement 3
B)statement 2 and statement 3
C)only statement 2
D)statement 1, 3 and 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
The aim of Just-In-Time manufacturing principle is to eliminate

A)time wastage
B)labour wastage
C)cost of excessive inventory
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
To what does the ISO 9000 standards family apply?

A)calibration
B)e?ciency & productivity
C)quality system design &
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.