Deck 5: Software Quality and User Interface
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/24
العب
ملء الشاشة (f)
Deck 5: Software Quality and User Interface
1
Plasma panel have resolution.
A)high
B)good
C)both a and b
D)none
A)high
B)good
C)both a and b
D)none
high
2
What is/are the main component / components of user interface ?
A)presentation language
B)action language
C)both a and b
D)none
A)presentation language
B)action language
C)both a and b
D)none
presentation language
3
Which one is the basic input device in GUI
A)mouse
B)keyboard
C)cpu
D)monitor
A)mouse
B)keyboard
C)cpu
D)monitor
mouse
4
Which of the following model put much more emphasis on testing?
A)waterfall model
B)agile model
C)spiral model
D)v-v model
A)waterfall model
B)agile model
C)spiral model
D)v-v model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
5
Independent modules are easier to maintain and test because of.
A)code modi?cation is limited,
B)error propagation is reduced
C)reusable modules are possible.
D)all of the above.
A)code modi?cation is limited,
B)error propagation is reduced
C)reusable modules are possible.
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following option is not tracked by con?guration management tools?
A)tracking of change proposals
B)storing versions of system components
C)tracking the releases of system versions to customers
D)none of the mentioned
A)tracking of change proposals
B)storing versions of system components
C)tracking the releases of system versions to customers
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following is not a Software Con?guration Management Activity?
A)con?guration item identi?cation
B)risk management
C)release management
D)branch management
A)con?guration item identi?cation
B)risk management
C)release management
D)branch management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
8
The de?nition and use of con?guration management standards is essential for quality certi?cation in
A)iso 9000
B)cmm
C)cmmi
D)all of the mentioned
A)iso 9000
B)cmm
C)cmmi
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
9
Client/server architectures cannot be properly tested because network load is highly variable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is / are types of Software Maintenance?
A)corrective
B)adaptive
C)perfective
D)all of the above
A)corrective
B)adaptive
C)perfective
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
11
_______ is a Software Con?guration Management concept that helps us to control change.
A)baseline
B)procedure
C)audit
D)none of the above
A)baseline
B)procedure
C)audit
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
12
Software Con?guration Management (SCM) is an umbrella activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
13
What is the main aim of Software Con?guration Management (SCM)?
A)identify change
B)control change
C)ensure that change is
D)all of the above
A)identify change
B)control change
C)ensure that change is
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
14
Select which option is not true about SQA…?
A)audits and reviews to be performed by the team
B)amount of technical work to be performed
C)evaluations to be performed
D)documents that are produced by the sqa team.
A)audits and reviews to be performed by the team
B)amount of technical work to be performed
C)evaluations to be performed
D)documents that are produced by the sqa team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
15
A product which is manufactured by using the degree of the design speci?cation…
A)quality of conformance
B)quality control
C)quality assurance
D)none of the above.
A)quality of conformance
B)quality control
C)quality assurance
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is not included in prevention cost?
A)equipment calibration and maintenance
B)formal technical reviews
C)test equipment revie ws
D)quality planning review s
A)equipment calibration and maintenance
B)formal technical reviews
C)test equipment revie ws
D)quality planning review s
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
17
Select the people who identify the document and veri?es the correctness of the software…
A)project manager
B)sqa team
C)project team
D)all of the mentioned
A)project manager
B)sqa team
C)project team
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
18
Select the option which is not an appraisal in SQA?
A)inter-process inspection
B)maintenance
C)testing
D)quality planning
A)inter-process inspection
B)maintenance
C)testing
D)quality planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
19
What does Qa and QC stands for
A)quality assurance and quality control
B)quality adjustment and quality quaity completion
C)quality assurance and queuing control
D)quality adjustment and queuing control
A)quality assurance and quality control
B)quality adjustment and quality quaity completion
C)quality assurance and queuing control
D)quality adjustment and queuing control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following is not a SQA plan for a project?
A)evaluations to be performed
B)amount of technical work
C)audits and reviews to be performed
D)ocuments to be produced by the sqa group
A)evaluations to be performed
B)amount of technical work
C)audits and reviews to be performed
D)ocuments to be produced by the sqa group
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is not included in External failure costs?
A)testing
B)help line support
C)warranty work
D)complaint resolution
A)testing
B)help line support
C)warranty work
D)complaint resolution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
22
Who identi?es, documents, and veri?es that corrections have been made to the software?
A)project manager
B)project team
C)sqa group
D)all of the mentioned
A)project manager
B)project team
C)sqa group
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
23
Quality also can be looked at in terms of user satisfaction which includes
A)a compliant product
B)good quality output
C)delivery within budget and schedule
D)all of the mentioned
A)a compliant product
B)good quality output
C)delivery within budget and schedule
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is not a core step of Six Sigma?
A)de?ne
B)control
C)measure
D)analyse
A)de?ne
B)control
C)measure
D)analyse
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck