Deck 10: Combined Operations With Common Fractions

ملء الشاشة (f)
exit full mode
سؤال
Two rooms are each 18 feet by 10 1/4 feet, and a third room measures 18 1/2 feet by 20 feet. How many square feet of hardwood flooring will be required for the three rooms?
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Three people are hired as part-time helpers to pick up after carpenters have completed a construction job. They work 1 3/4 hours, 5 1/4 hours, and 2 hours every day for 5 days. What is the total number of hours all three people work?
سؤال
There are 650 square feet of hardwood flooring needed. Hardwood flooring may be ordered only in units of 25 square feet. How many units must be ordered?
سؤال
Masons are paid $11.30 per hour for a 40 hour week and time and one-half for overtime. How much will a mason be paid for working 44 hours?
سؤال
A 800 foot roll of 151-pound slater's felt is used to repair a roof before laying new shingles. If 1/4 of the roll is used, how many feet remain?
سؤال
A carpenter can place 5 floor joists in 1/4 hour. At this rate, how much time is required to place 100 floor joists?
سؤال
Fractions in multiplication and division need to be converted to common denominators.
سؤال
If 1/4 inch on a drawing represents 1 foot, how many inches on the drawing represents 12 feet?
سؤال
How many 3 1/2 inch lengths can be cut from a 5 foot pole? (Make no allowance for saw kerfs.)
سؤال
Convert all fractions that will be used in addition or subtraction to their lowest common denominators.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Combined Operations With Common Fractions
1
Two rooms are each 18 feet by 10 1/4 feet, and a third room measures 18 1/2 feet by 20 feet. How many square feet of hardwood flooring will be required for the three rooms?
739
2
Three people are hired as part-time helpers to pick up after carpenters have completed a construction job. They work 1 3/4 hours, 5 1/4 hours, and 2 hours every day for 5 days. What is the total number of hours all three people work?
45
3
There are 650 square feet of hardwood flooring needed. Hardwood flooring may be ordered only in units of 25 square feet. How many units must be ordered?
26
4
Masons are paid $11.30 per hour for a 40 hour week and time and one-half for overtime. How much will a mason be paid for working 44 hours?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
A 800 foot roll of 151-pound slater's felt is used to repair a roof before laying new shingles. If 1/4 of the roll is used, how many feet remain?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
A carpenter can place 5 floor joists in 1/4 hour. At this rate, how much time is required to place 100 floor joists?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
Fractions in multiplication and division need to be converted to common denominators.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
If 1/4 inch on a drawing represents 1 foot, how many inches on the drawing represents 12 feet?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
How many 3 1/2 inch lengths can be cut from a 5 foot pole? (Make no allowance for saw kerfs.)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Convert all fractions that will be used in addition or subtraction to their lowest common denominators.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.