Career paths for Wind Technicians include: manufacturing, site operations, site developement, and __________.

A) electrical utility operations
B) remote service operations
C) sales
D) All answers are correct
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Major wind turbine generator assemblies include: machine head, rotor assembly, and ________.

A) pad mount transformer
B) down tower assembly
C) field office
D) nacelle
سؤال
Government incentives such as Production Tax Credits have been influential in boosting wind investment.
سؤال
Some radio manufacturers such as Zenith gave away wind turbines to promote the sale of their systems in remote locations before ruarl electrification.
سؤال
ROI is a unit of measure for sound produced by a wind turbine
سؤال
Siting considerations for a single wind turbine or large project may include: local wind resources, visual impact, noise levels, governmental permitting requirements, and ___________.

A) wildlife impact studies
B) number of trucks in the fleet
C) population of the town
D) ANSI standards
سؤال
Two US organizations that have been developing wind technician standard skill sets include ANSI and AWEA.
سؤال
Three Mega-Watt sized wind turbines have been in service since the middle of the 1970's.
سؤال
The US EPA has set the allowable noise from an industrial source to be 55 dBA outside an occupied dwelling.
سؤال
Wind turbine rotor configurations include HAWT and VAWT.
سؤال
__________ is an organization that has developed a Wind Technician Basic Skill Set.

A) AWEA
B) Maine DOL
C) Texas DOL
D) All answers are correct
سؤال
Wind turbine siting requirements include permitting approval from several state and federal agencies which may include: DEP, LURC, and ________.

A) NFPA
B) OSHA
C) EPA
D) OPEC
سؤال
European electrical power teansmission systems use a 60 Hertz frequency for AC.
سؤال
Equipment to harness wind for electricity was not invented until the early 1960s.
سؤال
Wild AC is the term given to electrical power that is maintained at a constant voltage and frequency.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: Introduction
1
Career paths for Wind Technicians include: manufacturing, site operations, site developement, and __________.

A) electrical utility operations
B) remote service operations
C) sales
D) All answers are correct
D
2
Major wind turbine generator assemblies include: machine head, rotor assembly, and ________.

A) pad mount transformer
B) down tower assembly
C) field office
D) nacelle
B
3
Government incentives such as Production Tax Credits have been influential in boosting wind investment.
True
4
Some radio manufacturers such as Zenith gave away wind turbines to promote the sale of their systems in remote locations before ruarl electrification.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
ROI is a unit of measure for sound produced by a wind turbine
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
Siting considerations for a single wind turbine or large project may include: local wind resources, visual impact, noise levels, governmental permitting requirements, and ___________.

A) wildlife impact studies
B) number of trucks in the fleet
C) population of the town
D) ANSI standards
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Two US organizations that have been developing wind technician standard skill sets include ANSI and AWEA.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
Three Mega-Watt sized wind turbines have been in service since the middle of the 1970's.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
The US EPA has set the allowable noise from an industrial source to be 55 dBA outside an occupied dwelling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
Wind turbine rotor configurations include HAWT and VAWT.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
__________ is an organization that has developed a Wind Technician Basic Skill Set.

A) AWEA
B) Maine DOL
C) Texas DOL
D) All answers are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
Wind turbine siting requirements include permitting approval from several state and federal agencies which may include: DEP, LURC, and ________.

A) NFPA
B) OSHA
C) EPA
D) OPEC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
European electrical power teansmission systems use a 60 Hertz frequency for AC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Equipment to harness wind for electricity was not invented until the early 1960s.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Wild AC is the term given to electrical power that is maintained at a constant voltage and frequency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.