Every two out of 10 organizations say they have business continuity coverage.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Each disagreeing party should be allowed about 20 minutes to make its case when a consensus cannot be reached.
سؤال
The IT system and support analysis sheet, describes specific IT systems and the business processes they support.
سؤال
If the planning team cannot reach a consensus after independently ranking the possible recovery priorities, then the coordinator needs to make the decision.
سؤال
25 % of organizations said they believed their company insurance would cover potential losses.
سؤال
There are no absolute definitions for critical, essential, necessary, and desirable systems and functions.
سؤال
Flooding was the most frequent type of U.S.disaster during the 1990s.
سؤال
If consensus building is necessary, the disaster recovery planning coordinator should start with the most difficult process.
سؤال
The support departments should perform detailed studies of the systems or support functions required to meet disaster recovery priorities.
سؤال
When a disaster occurs, organizations try to maintain a full level of functionality and achieve their key goals.
سؤال
In a presentation, the introduction item's purpose is to ensure that all planning team members understand exactly what the department group is discussing.
سؤال
California was the number one ranking location for disasters from 1972 to 2000 with a total of 51.
سؤال
The Northridge earthquake in California occurred in 1992 .
سؤال
Hurricane Andrew occurred in 1992 .
سؤال
The planning coordinator should make a comprehensive list of all the business processes and facilities described in the inventory risk assessment reports.
سؤال
The planing team should develop a chart of issuance to show which facilities, departments, and staff must participate in developing recovery procedures.
سؤال
Palau was the lowest ranking territory for disasters from 1972 to 2000 with a total of one.
سؤال
If a department does not have direct responsibility for recovery of a facility or business process, it should still be involved in developing recovery procedures.
سؤال
Minority opinions and dissenters need to be minimized as much as possible to reduce the possibility of impacting other members.
سؤال
The summary statement of the department position during a business priority discussion helps to solidify its stance and provide a platform for further discussion.
سؤال
One of the possible consequences of noncompliance with social expectations is ____.

A)class action lawsuits
B)civil litigation
C)damaged reputation
D)all of the above
سؤال
One of the possible consequences of noncompliance with financial pressures is ____.

A)loss of license
B)penalties for late delivery
C)loss of market share
D)walkouts
سؤال
Which of the following spaces are common to all of the disaster recovery charts of responsibility?

A)Facility number
B)Department name
C)Contact information
D)Number of employees
سؤال
Which systems support analysis sheet should list all of the software needed to support the processes?

A)IT
B)Computer network
C)Facilities management
D)Telecommunications
سؤال
Which of the following systems and functions contribute to smooth operations and comfortable working conditions for employees?

A)Critical
B)Essential
C)Necessary
D)Desirable
سؤال
Which of the following systems and functions must be in place to support day-to-day operations?

A)Critical
B)Essential
C)Desirable
D)Necessary
سؤال
Which systems support analysis sheet could be numbered FMSS01?

A)Faculty management
B)Facilities management
C)Focus management
D)Focus module
سؤال
One of the possible consequences of noncompliance with financial pressures is ____.

A)class action lawsuits
B)government investigations
C)required borrowing of funds
D)loss of market share
سؤال
Which disaster recovery chart of responsibilities has spaces for the facility number, the number of buildings and employees at the facility, and contact information for responders?

A)Business process
B)Facility
C)Department
D)Both a and b
E)a, b, and c
سؤال
Which of the following systems and functions absolutely must be in place for any business process to continue at all?

A)Desirable
B)Necessary
C)Critical
D)Essential
سؤال
One of the possible consequences of noncompliance with regulatory requirements is ____.

A)labor disputes
B)loss of major customers
C)criminal charges
D)civil litigation
E)none of the above
سؤال
<strong>   style=vertical-align: 0px; width=432px height=310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)HRSS01 C)CNSS01 D)HRSS01 <div style=padding-top: 35px> " style="vertical-align: 0px;" width="432px" height="310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)HRSS01
C)CNSS01
D)HRSS01
سؤال
How many organizations out of 10, did not have business continuity coverage?

A)1
B)2
C)3
D)5
سؤال
<strong>   style=vertical-align: 0px; width=432px height=286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)SRSS01 C)CNSS01 D)ITSS01 <div style=padding-top: 35px> " style="vertical-align: 0px;" width="432px" height="286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)SRSS01
C)CNSS01
D)ITSS01
سؤال
Which of the following systems and functions improve working conditions and help to enhance the organization's performance?

A)Critical
B)Desirable
C)Necessary
D)Essential
سؤال
Which systems support analysis sheet should list any software or communications connectivity needed for network access?

A)IT
B)Computer network
C)Corporate security
D)Telecommunications
سؤال
<strong>   style=vertical-align: 0px; width=432px height=307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)SRSS01 B)HRSS01 C)FMSS01 D)ITSS01 <div style=padding-top: 35px> " style="vertical-align: 0px;" width="432px" height="307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)SRSS01
B)HRSS01
C)FMSS01
D)ITSS01
سؤال
One of the possible consequences of noncompliance with contractual requirements is ____.

A)criminal charges
B)loss of business
C)civil litigation
D)termination of managers
E)all of the above
سؤال
One of the possible consequences of noncompliance with management mandates is ____.

A)termination of managers
B)a shift in cash positions
C)civil litigation
D)fines
E)none of the above
سؤال
One of the possible consequences of noncompliance with social expectations is ____.

A)loss of license or permits
B)loss of business
C)shift in cash positions
D)damaged reputation
سؤال
Almost ____ of FEMA funding was required by the 1994 Northbridge earthquake.

A)$5 billion
B)$7 billion
C)$9 billion
D)$11 billion
سؤال
How many declarations for disasters and emergencies were issued by FEMA in 1999?

A)15
B)18
C)19
D)21
سؤال
What questions does the insurance review subcommittee need to ask after evaluating the terms and conditions of the insurance coverage?
سؤال
Which of the following were the most costly weather related disasters in the 1990s?

A)Tornados
B)Typhoons
C)Hurricanes
D)Earthquakes
E)Both b and c
سؤال
What is the total number of disasters declared in the U.S from 1972 to 2000 in 50 states, the District of Columbia, and 9 U.S. territories?

A)1007
B)1027
C)1037
D)1047
سؤال
What three disaster recovery charts of responsibilities should be developed?
سؤال
Which disaster recovery chart of responsibilities has spaces for the department name, facility number, and building number(s)?

A)Department
B)Business process
C)Facility
D)Both a and b
E)Both a and c
سؤال
What was the most frequent type of U.S. disaster during the 1990s?

A)Fires
B)Flooding
C)Tornados
D)Hurricanes
سؤال
What are the four classifications of systems or functions for recovery?
سؤال
What has happened with business continuity insurance as a result of major hurricanes, tornadoes, floods, earthquakes, and terrorist attacks during the last decade?
سؤال
What four things need to happen once the disaster recovery planning team has compiled exposure inventories, risk inventories, and risk assessment reports?
سؤال
What does the most senior manager need to do to resolve a dispute if a consensus cannot be reached?
سؤال
Match between columns
Tropical storm Allison (FL, LA, MS, PA, TX)
1997
Tropical storm Allison (FL, LA, MS, PA, TX)
1989
Tropical storm Allison (FL, LA, MS, PA, TX)
1999
Tropical storm Allison (FL, LA, MS, PA, TX)
1992
Tropical storm Allison (FL, LA, MS, PA, TX)
2001
Tropical storm Allison (FL, LA, MS, PA, TX)
1994
Tropical storm Allison (FL, LA, MS, PA, TX)
1996
Tropical storm Allison (FL, LA, MS, PA, TX)
1998
Tropical storm Allison (FL, LA, MS, PA, TX)
1993
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1997
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1989
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1999
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1992
Hurricane Georges (AL, FL, LA, MS, PR, VI)
2001
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1994
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1996
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1998
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1993
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1997
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1989
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1999
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1992
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
2001
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1994
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1996
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1998
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1993
Northridge earthquake (CA)
1997
Northridge earthquake (CA)
1989
Northridge earthquake (CA)
1999
Northridge earthquake (CA)
1992
Northridge earthquake (CA)
2001
Northridge earthquake (CA)
1994
Northridge earthquake (CA)
1996
Northridge earthquake (CA)
1998
Northridge earthquake (CA)
1993
Hurricane Fran (MD, NC, PA, VA, WV)
1997
Hurricane Fran (MD, NC, PA, VA, WV)
1989
Hurricane Fran (MD, NC, PA, VA, WV)
1999
Hurricane Fran (MD, NC, PA, VA, WV)
1992
Hurricane Fran (MD, NC, PA, VA, WV)
2001
Hurricane Fran (MD, NC, PA, VA, WV)
1994
Hurricane Fran (MD, NC, PA, VA, WV)
1996
Hurricane Fran (MD, NC, PA, VA, WV)
1998
Hurricane Fran (MD, NC, PA, VA, WV)
1993
Loma Prieta earthquake (CA)
1997
Loma Prieta earthquake (CA)
1989
Loma Prieta earthquake (CA)
1999
Loma Prieta earthquake (CA)
1992
Loma Prieta earthquake (CA)
2001
Loma Prieta earthquake (CA)
1994
Loma Prieta earthquake (CA)
1996
Loma Prieta earthquake (CA)
1998
Loma Prieta earthquake (CA)
1993
Hurricane Andrew (FL, LA)
1997
Hurricane Andrew (FL, LA)
1989
Hurricane Andrew (FL, LA)
1999
Hurricane Andrew (FL, LA)
1992
Hurricane Andrew (FL, LA)
2001
Hurricane Andrew (FL, LA)
1994
Hurricane Andrew (FL, LA)
1996
Hurricane Andrew (FL, LA)
1998
Hurricane Andrew (FL, LA)
1993
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1997
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1989
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1999
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1992
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
2001
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1994
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1996
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1998
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1993
Red River Valley floods (MN, ND, SD)
1997
Red River Valley floods (MN, ND, SD)
1989
Red River Valley floods (MN, ND, SD)
1999
Red River Valley floods (MN, ND, SD)
1992
Red River Valley floods (MN, ND, SD)
2001
Red River Valley floods (MN, ND, SD)
1994
Red River Valley floods (MN, ND, SD)
1996
Red River Valley floods (MN, ND, SD)
1998
Red River Valley floods (MN, ND, SD)
1993
سؤال
Which checklist is a helpful review tool to evaluate progress before the disaster recovery planning team moves on to develop recovery procedures?

A)Risk assessment
B)Disaster recovery planning
C)Disaster review
D)Disaster priority review
سؤال
What are three possible consequences of noncompliance with competitive pressures?
سؤال
What should the analysis of the requirements for supporting the business process, which the planning team conducted during the risk assessment show?
سؤال
In addition to examining terms and conditions of coverage, which areas does the insurance review subcommittee need to evaluate insurance coverage and needs?
سؤال
What purposes does analyzing high-priority systems or functions serve?
سؤال
Which disaster recovery chart of responsibilities has spaces for the business entity name, the department name, facility number, building number(s), and process number?

A)Facility
B)Department
C)Business process
D)None of the above
سؤال
From ____ to ____ FEMA spent more than $25.4 billion for disasters and emergencies.

A)1980, 1989
B)1990, 1999
C)1990, 2002
D)1985, 1995
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/60
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Prioritizing Systems and Functions for Recovery
1
Every two out of 10 organizations say they have business continuity coverage.
True
2
Each disagreeing party should be allowed about 20 minutes to make its case when a consensus cannot be reached.
False
3
The IT system and support analysis sheet, describes specific IT systems and the business processes they support.
True
4
If the planning team cannot reach a consensus after independently ranking the possible recovery priorities, then the coordinator needs to make the decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
5
25 % of organizations said they believed their company insurance would cover potential losses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
6
There are no absolute definitions for critical, essential, necessary, and desirable systems and functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
7
Flooding was the most frequent type of U.S.disaster during the 1990s.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
8
If consensus building is necessary, the disaster recovery planning coordinator should start with the most difficult process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
9
The support departments should perform detailed studies of the systems or support functions required to meet disaster recovery priorities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
10
When a disaster occurs, organizations try to maintain a full level of functionality and achieve their key goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
11
In a presentation, the introduction item's purpose is to ensure that all planning team members understand exactly what the department group is discussing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
12
California was the number one ranking location for disasters from 1972 to 2000 with a total of 51.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
13
The Northridge earthquake in California occurred in 1992 .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
14
Hurricane Andrew occurred in 1992 .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
15
The planning coordinator should make a comprehensive list of all the business processes and facilities described in the inventory risk assessment reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
16
The planing team should develop a chart of issuance to show which facilities, departments, and staff must participate in developing recovery procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
17
Palau was the lowest ranking territory for disasters from 1972 to 2000 with a total of one.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
18
If a department does not have direct responsibility for recovery of a facility or business process, it should still be involved in developing recovery procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
19
Minority opinions and dissenters need to be minimized as much as possible to reduce the possibility of impacting other members.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
20
The summary statement of the department position during a business priority discussion helps to solidify its stance and provide a platform for further discussion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
21
One of the possible consequences of noncompliance with social expectations is ____.

A)class action lawsuits
B)civil litigation
C)damaged reputation
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
22
One of the possible consequences of noncompliance with financial pressures is ____.

A)loss of license
B)penalties for late delivery
C)loss of market share
D)walkouts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following spaces are common to all of the disaster recovery charts of responsibility?

A)Facility number
B)Department name
C)Contact information
D)Number of employees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which systems support analysis sheet should list all of the software needed to support the processes?

A)IT
B)Computer network
C)Facilities management
D)Telecommunications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following systems and functions contribute to smooth operations and comfortable working conditions for employees?

A)Critical
B)Essential
C)Necessary
D)Desirable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following systems and functions must be in place to support day-to-day operations?

A)Critical
B)Essential
C)Desirable
D)Necessary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which systems support analysis sheet could be numbered FMSS01?

A)Faculty management
B)Facilities management
C)Focus management
D)Focus module
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
28
One of the possible consequences of noncompliance with financial pressures is ____.

A)class action lawsuits
B)government investigations
C)required borrowing of funds
D)loss of market share
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which disaster recovery chart of responsibilities has spaces for the facility number, the number of buildings and employees at the facility, and contact information for responders?

A)Business process
B)Facility
C)Department
D)Both a and b
E)a, b, and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following systems and functions absolutely must be in place for any business process to continue at all?

A)Desirable
B)Necessary
C)Critical
D)Essential
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
31
One of the possible consequences of noncompliance with regulatory requirements is ____.

A)labor disputes
B)loss of major customers
C)criminal charges
D)civil litigation
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
32
<strong>   style=vertical-align: 0px; width=432px height=310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)HRSS01 C)CNSS01 D)HRSS01 " style="vertical-align: 0px;" width="432px" height="310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)HRSS01
C)CNSS01
D)HRSS01
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
33
How many organizations out of 10, did not have business continuity coverage?

A)1
B)2
C)3
D)5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
34
<strong>   style=vertical-align: 0px; width=432px height=286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)SRSS01 C)CNSS01 D)ITSS01 " style="vertical-align: 0px;" width="432px" height="286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)SRSS01
C)CNSS01
D)ITSS01
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following systems and functions improve working conditions and help to enhance the organization's performance?

A)Critical
B)Desirable
C)Necessary
D)Essential
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which systems support analysis sheet should list any software or communications connectivity needed for network access?

A)IT
B)Computer network
C)Corporate security
D)Telecommunications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
37
<strong>   style=vertical-align: 0px; width=432px height=307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)SRSS01 B)HRSS01 C)FMSS01 D)ITSS01 " style="vertical-align: 0px;" width="432px" height="307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)SRSS01
B)HRSS01
C)FMSS01
D)ITSS01
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
38
One of the possible consequences of noncompliance with contractual requirements is ____.

A)criminal charges
B)loss of business
C)civil litigation
D)termination of managers
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
39
One of the possible consequences of noncompliance with management mandates is ____.

A)termination of managers
B)a shift in cash positions
C)civil litigation
D)fines
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
40
One of the possible consequences of noncompliance with social expectations is ____.

A)loss of license or permits
B)loss of business
C)shift in cash positions
D)damaged reputation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
41
Almost ____ of FEMA funding was required by the 1994 Northbridge earthquake.

A)$5 billion
B)$7 billion
C)$9 billion
D)$11 billion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
42
How many declarations for disasters and emergencies were issued by FEMA in 1999?

A)15
B)18
C)19
D)21
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
43
What questions does the insurance review subcommittee need to ask after evaluating the terms and conditions of the insurance coverage?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following were the most costly weather related disasters in the 1990s?

A)Tornados
B)Typhoons
C)Hurricanes
D)Earthquakes
E)Both b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
45
What is the total number of disasters declared in the U.S from 1972 to 2000 in 50 states, the District of Columbia, and 9 U.S. territories?

A)1007
B)1027
C)1037
D)1047
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
46
What three disaster recovery charts of responsibilities should be developed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which disaster recovery chart of responsibilities has spaces for the department name, facility number, and building number(s)?

A)Department
B)Business process
C)Facility
D)Both a and b
E)Both a and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
48
What was the most frequent type of U.S. disaster during the 1990s?

A)Fires
B)Flooding
C)Tornados
D)Hurricanes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
49
What are the four classifications of systems or functions for recovery?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
50
What has happened with business continuity insurance as a result of major hurricanes, tornadoes, floods, earthquakes, and terrorist attacks during the last decade?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
51
What four things need to happen once the disaster recovery planning team has compiled exposure inventories, risk inventories, and risk assessment reports?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
52
What does the most senior manager need to do to resolve a dispute if a consensus cannot be reached?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
53
Match between columns
Tropical storm Allison (FL, LA, MS, PA, TX)
1997
Tropical storm Allison (FL, LA, MS, PA, TX)
1989
Tropical storm Allison (FL, LA, MS, PA, TX)
1999
Tropical storm Allison (FL, LA, MS, PA, TX)
1992
Tropical storm Allison (FL, LA, MS, PA, TX)
2001
Tropical storm Allison (FL, LA, MS, PA, TX)
1994
Tropical storm Allison (FL, LA, MS, PA, TX)
1996
Tropical storm Allison (FL, LA, MS, PA, TX)
1998
Tropical storm Allison (FL, LA, MS, PA, TX)
1993
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1997
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1989
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1999
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1992
Hurricane Georges (AL, FL, LA, MS, PR, VI)
2001
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1994
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1996
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1998
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1993
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1997
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1989
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1999
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1992
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
2001
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1994
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1996
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1998
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1993
Northridge earthquake (CA)
1997
Northridge earthquake (CA)
1989
Northridge earthquake (CA)
1999
Northridge earthquake (CA)
1992
Northridge earthquake (CA)
2001
Northridge earthquake (CA)
1994
Northridge earthquake (CA)
1996
Northridge earthquake (CA)
1998
Northridge earthquake (CA)
1993
Hurricane Fran (MD, NC, PA, VA, WV)
1997
Hurricane Fran (MD, NC, PA, VA, WV)
1989
Hurricane Fran (MD, NC, PA, VA, WV)
1999
Hurricane Fran (MD, NC, PA, VA, WV)
1992
Hurricane Fran (MD, NC, PA, VA, WV)
2001
Hurricane Fran (MD, NC, PA, VA, WV)
1994
Hurricane Fran (MD, NC, PA, VA, WV)
1996
Hurricane Fran (MD, NC, PA, VA, WV)
1998
Hurricane Fran (MD, NC, PA, VA, WV)
1993
Loma Prieta earthquake (CA)
1997
Loma Prieta earthquake (CA)
1989
Loma Prieta earthquake (CA)
1999
Loma Prieta earthquake (CA)
1992
Loma Prieta earthquake (CA)
2001
Loma Prieta earthquake (CA)
1994
Loma Prieta earthquake (CA)
1996
Loma Prieta earthquake (CA)
1998
Loma Prieta earthquake (CA)
1993
Hurricane Andrew (FL, LA)
1997
Hurricane Andrew (FL, LA)
1989
Hurricane Andrew (FL, LA)
1999
Hurricane Andrew (FL, LA)
1992
Hurricane Andrew (FL, LA)
2001
Hurricane Andrew (FL, LA)
1994
Hurricane Andrew (FL, LA)
1996
Hurricane Andrew (FL, LA)
1998
Hurricane Andrew (FL, LA)
1993
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1997
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1989
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1999
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1992
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
2001
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1994
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1996
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1998
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1993
Red River Valley floods (MN, ND, SD)
1997
Red River Valley floods (MN, ND, SD)
1989
Red River Valley floods (MN, ND, SD)
1999
Red River Valley floods (MN, ND, SD)
1992
Red River Valley floods (MN, ND, SD)
2001
Red River Valley floods (MN, ND, SD)
1994
Red River Valley floods (MN, ND, SD)
1996
Red River Valley floods (MN, ND, SD)
1998
Red River Valley floods (MN, ND, SD)
1993
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which checklist is a helpful review tool to evaluate progress before the disaster recovery planning team moves on to develop recovery procedures?

A)Risk assessment
B)Disaster recovery planning
C)Disaster review
D)Disaster priority review
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
55
What are three possible consequences of noncompliance with competitive pressures?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
56
What should the analysis of the requirements for supporting the business process, which the planning team conducted during the risk assessment show?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
57
In addition to examining terms and conditions of coverage, which areas does the insurance review subcommittee need to evaluate insurance coverage and needs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
58
What purposes does analyzing high-priority systems or functions serve?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which disaster recovery chart of responsibilities has spaces for the business entity name, the department name, facility number, building number(s), and process number?

A)Facility
B)Department
C)Business process
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
60
From ____ to ____ FEMA spent more than $25.4 billion for disasters and emergencies.

A)1980, 1989
B)1990, 1999
C)1990, 2002
D)1985, 1995
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.