Deck 19: Answers to Selected Problems

ملء الشاشة (f)
exit full mode
سؤال
Match the failure with its closest category: a band playing a sub-standard set at a concert.

A) Supplier failure
B) Customer failure
C) Design failure
D) Staff failure
E) Facilities failure
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
There are a number of forms of failure analysis. An approach that enables all faulty products to be traceable is:

A) Fault tree analysis
B) Complaint analysis
C) Product liability
D) Failure mode and effect analysis
E) Accident investigation
F) Critical incident analysis
سؤال
The three tasks of failure prevention and recovery are: failure detection and analysis, failure
prevention and improving system reliability.
سؤال
Match the failure with its closest category: A person causing failure by overloading a washing machine.

A) Supplier failure
B) Design failure
C) Staff failure
D) Customer failure
E) Facilities failure
سؤال
Failure is caused by the deterioration of parts during the:

A) Normal life stage
B) Early-life stage
C) Wear out stage
سؤال
Acts that are clearly contrary to defined operating procedures are called:

A) Violations
B) Mistakes
C) Errors
D) Human deficiencies
سؤال
The more interdependent components a system has the lower its reliability will be.
سؤال
The case of a theatre having very long queues for the toilets during intervals relates to:

A) People failures
B) Facilities failures
C) Design failures
D) Supplier failures
سؤال
There are a number of forms of failure analysis. Large scale disasters tend to lead to:

A) Complaint analysis
B) Product liability
C) Fault tree analysis
D) Accident investigation
E) Failure mode and effect analysis
F) Critical incident analysis
سؤال
Match the failure with its closest category: A machine operative failing to clean and oil the machine in the prescribed manner.

A) Design failure
B) Staff failure
C) Supplier failure
D) Customer failure
E) Facilities failure
سؤال
Match the failure with its closest category: A failure to anticipate future uses of a product.

A) Customer failure
B) Staff failure
C) Design failure
D) Supplier failure
E) Facilities failure
سؤال
Match the failure with its closest category: A computer breakdown in a bank.

A) Supplier failure
B) Facilities failure
C) Customer failure
D) Staff failure
E) Design failure
سؤال
A machine that partially breaks down and is only able to work at half its normal rate is an example of a:

A) Supplier failure
B) People failure
C) Design failure
D) Facilities failure
سؤال
The reliability of an operation is normally NOT improved by which one of the following procedures?

A) Ensuring some activities in the operation are 'fail-safe'.
B) Laying off employees who cause faults in the operation.
C) Designing out fail points in the operation.
D) Building redundancy into the operation.
سؤال
There are a number of forms of failure analysis. An approach that makes use of a cheap and easily available source of information is:

A) Product liability
B) Critical incident analysis
C) Accident investigation
D) Complaint analysis
E) Failure mode and effect analysis
F) Fault tree analysis
سؤال
Building redundancy into an operation means having backup systems or components in case of
failure.
سؤال
Why are aircraft crashes so rare?

A) Because pilots are so well trained.
B) Because a whole chain of minor failures usually have to occur.
C) Because the planes have such high quality standards.
D) All of the above.
سؤال
The failure rate is usually low and constant during the:

A) Wear out stage
B) Early-life stage
C) Normal life stage
سؤال
The risk priority number (RPN) determines the potential cause of failure.
سؤال
Failure mode and effect analysis (FMEA) provide a checklist procedure. Which of the following questions is NOT likely to feature on the checklist?

A) What is the likelihood that failure will occur?
B) What would be the cost of avoiding failure?
C) What would the consequences of the failure be?
D) How likely is such a failure to be detected before it affects the customer?
سؤال
The effect of increasing the number of interdependent components in a system is to:

A) Exponentially decrease its reliability.
B) Steadily decrease its reliability.
C) Exponentially increase its reliability.
D) Steadily increase its reliability.
سؤال
The origin of all types of failure is usually some kind of human failure.
سؤال
Which of the following is NOT a way of measuring failure?

A) How often a failure occurs.
B) The amount of available operating time.
C) The satisfaction of customers with a product.
D) The chances of a failure occurring.
سؤال
For a system composed of 50 interdependent components which each have individual reliability of .99, the overall system reliability is:

A) Below .70
B) Below .40
C) Below .65
D) Below .80
سؤال
Which of the following does NOT measure the propensity of an operation or part of an operation to fail?

A) Availability
B) Reliability
C) Failure rate
سؤال
If a customer overloads their washing machine and it fails, what type of failure has occurred?

A) Design failure
B) A violation
C) Customer failure
D) People failure
سؤال
The curve that describes the failure probability of most physical parts of an operation is called:

A) The 'bathtub' curve
B) The 'quality function' curve
C) The 'S' curve
D) The 'J' curve
سؤال
The chances of a failure occurring relates to what when measuring failure?

A) Reliability
B) Quality
C) Failure rate
D) Availability
سؤال
If components in a system are independent, a failure in any individual component will cause the
whole system to fail.
سؤال
Maintenance work performed only after failure has taken place is known as:

A) Run to breakdown (RTB)
B) Condition-based maintenance (CBM)
C) Preventive maintenance (PM)
سؤال
For a system composed of 10 interdependent components that each have individual reliability of .99, the overall system reliability is:

A) .40
B) .60
C) .90
D) .99
سؤال
The sequence of questions at an automatic cash machine is designed to prevent:

A) Customer failure
B) Design failure
C) Facilities failure
D) People failure
سؤال
The ability of a system, product or service to perform as expected over time is a measure of:

A) Assurance
B) Availability
C) Validity
D) Reliability
سؤال
Failure rate can be measured as a percentage of the total number of products tested or as the:

A) Number of failures per batch.
B) Number of failures over operating time.
C) Defective parts per million.
D) Average failure point.
سؤال
The amount of available operating time relates to what when measuring failure?

A) Availability
B) Failure rate
C) Quality
D) Reliability
سؤال
The stage where early failures occur caused by defective parts or improper use is called:

A) The 'infant mortality' stage
B) The 'initial failure' stage
C) The 'wear out' stage
D) The 'crash and burn' stage
سؤال
Reliability is one measure of the consequences of failure of the operation.
سؤال
The misuse of the products and services that the operation has created is an example of:

A) People failure
B) Design failure
C) Supplier failure
D) Customer failure
سؤال
Failure of a band to turn up to a couple's wedding is an example of a ________ error.

A) Supplier
B) People
C) Design
D) Facilities
سؤال
The more interdependent components in a system:

A) The lower its reliability
B) The more robust to failure
C) The higher its reliability
D) The greater the level of customer satisfaction
سؤال
Having backup systems or components in case of failure is a called:

A) Designing out fail points
B) Building in redundancy
C) Fail-safing
D) Poka-yoke
سؤال
Identifying product or service features that are critical to various types of failure involves the use of what technique?

A) Complaints
B) FMEA
C) Critical incident
D) Critical path
سؤال
At the end of a service, staff may formally or informally check that the service has been satisfactory and try to solicit problems as well as compliments. This is an example of:

A) Feedback sheets
B) Focus groups
C) Questionnaires
D) Point of departure interviews
سؤال
Analysing the content of customer complaints to understand better the nature of the problem as it is perceived by the customer is called:

A) Critical incident technique
B) Path analysis
C) Complaint analysis
D) Customer-focused analysis
سؤال
The dominant maintenance mode when the consequences of equipment failure are high is:

A) Product-focused maintenance
B) Condition-based maintenance
C) Needs maintenance
D) Preventive maintenance
سؤال
Which of the following is a criticism levelled against Total Productive Maintenance?

A) It reduces machine effectiveness.
B) It tends to recommend preventive maintenance when it would be inappropriate.
C) It is hard to manage.
D) It leads to unplanned maintenance.
سؤال
Availability is calculated as the mean time between failures (MTBF) divided by:

A) MTTR
B) Average fail point
C) (MTBF + MTTR)
D) (MTTR - MTBF)
سؤال
Which of the following is NOT one of the 'three tasks of failure prevention and recovery'?

A) Coping when things go wrong
B) Dealing with staff dissatisfaction
C) Finding out what is going wrong and why
D) Preventing things from going wrong
سؤال
The mean time between failures (MTBF) is calculated as operating hours divided by:

A) Mean time to repair (MTTR)
B) Average failure rate
C) Availability of machines
D) Number of failures
سؤال
In some service organisations it is believed that for every one customer who has complained there are:

A) 2 who have not
B) 20 who have not
C) 200 who have not
D) 2000 who have not
سؤال
One of the critical activities for an organisation when a failure has occurred is to understand why it has occurred. This activity is called:

A) Critical path analysis
B) Feedback looping
C) Accident investigation
D) Failure analysis
سؤال
Attempts to eliminate or reduce the chances of failure by servicing facilities at pre-planned intervals is termed:

A) Condition-based maintenance
B) Preventive maintenance
C) Run to breakdown maintenance
D) Product-focused maintenance
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/52
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Answers to Selected Problems
1
Match the failure with its closest category: a band playing a sub-standard set at a concert.

A) Supplier failure
B) Customer failure
C) Design failure
D) Staff failure
E) Facilities failure
Supplier failure
2
There are a number of forms of failure analysis. An approach that enables all faulty products to be traceable is:

A) Fault tree analysis
B) Complaint analysis
C) Product liability
D) Failure mode and effect analysis
E) Accident investigation
F) Critical incident analysis
Product liability
3
The three tasks of failure prevention and recovery are: failure detection and analysis, failure
prevention and improving system reliability.
False
4
Match the failure with its closest category: A person causing failure by overloading a washing machine.

A) Supplier failure
B) Design failure
C) Staff failure
D) Customer failure
E) Facilities failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
5
Failure is caused by the deterioration of parts during the:

A) Normal life stage
B) Early-life stage
C) Wear out stage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
6
Acts that are clearly contrary to defined operating procedures are called:

A) Violations
B) Mistakes
C) Errors
D) Human deficiencies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
7
The more interdependent components a system has the lower its reliability will be.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
8
The case of a theatre having very long queues for the toilets during intervals relates to:

A) People failures
B) Facilities failures
C) Design failures
D) Supplier failures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
9
There are a number of forms of failure analysis. Large scale disasters tend to lead to:

A) Complaint analysis
B) Product liability
C) Fault tree analysis
D) Accident investigation
E) Failure mode and effect analysis
F) Critical incident analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
10
Match the failure with its closest category: A machine operative failing to clean and oil the machine in the prescribed manner.

A) Design failure
B) Staff failure
C) Supplier failure
D) Customer failure
E) Facilities failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
11
Match the failure with its closest category: A failure to anticipate future uses of a product.

A) Customer failure
B) Staff failure
C) Design failure
D) Supplier failure
E) Facilities failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
12
Match the failure with its closest category: A computer breakdown in a bank.

A) Supplier failure
B) Facilities failure
C) Customer failure
D) Staff failure
E) Design failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
13
A machine that partially breaks down and is only able to work at half its normal rate is an example of a:

A) Supplier failure
B) People failure
C) Design failure
D) Facilities failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
14
The reliability of an operation is normally NOT improved by which one of the following procedures?

A) Ensuring some activities in the operation are 'fail-safe'.
B) Laying off employees who cause faults in the operation.
C) Designing out fail points in the operation.
D) Building redundancy into the operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
15
There are a number of forms of failure analysis. An approach that makes use of a cheap and easily available source of information is:

A) Product liability
B) Critical incident analysis
C) Accident investigation
D) Complaint analysis
E) Failure mode and effect analysis
F) Fault tree analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
16
Building redundancy into an operation means having backup systems or components in case of
failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
17
Why are aircraft crashes so rare?

A) Because pilots are so well trained.
B) Because a whole chain of minor failures usually have to occur.
C) Because the planes have such high quality standards.
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
18
The failure rate is usually low and constant during the:

A) Wear out stage
B) Early-life stage
C) Normal life stage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
19
The risk priority number (RPN) determines the potential cause of failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
20
Failure mode and effect analysis (FMEA) provide a checklist procedure. Which of the following questions is NOT likely to feature on the checklist?

A) What is the likelihood that failure will occur?
B) What would be the cost of avoiding failure?
C) What would the consequences of the failure be?
D) How likely is such a failure to be detected before it affects the customer?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
21
The effect of increasing the number of interdependent components in a system is to:

A) Exponentially decrease its reliability.
B) Steadily decrease its reliability.
C) Exponentially increase its reliability.
D) Steadily increase its reliability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
22
The origin of all types of failure is usually some kind of human failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is NOT a way of measuring failure?

A) How often a failure occurs.
B) The amount of available operating time.
C) The satisfaction of customers with a product.
D) The chances of a failure occurring.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
24
For a system composed of 50 interdependent components which each have individual reliability of .99, the overall system reliability is:

A) Below .70
B) Below .40
C) Below .65
D) Below .80
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following does NOT measure the propensity of an operation or part of an operation to fail?

A) Availability
B) Reliability
C) Failure rate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
26
If a customer overloads their washing machine and it fails, what type of failure has occurred?

A) Design failure
B) A violation
C) Customer failure
D) People failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
27
The curve that describes the failure probability of most physical parts of an operation is called:

A) The 'bathtub' curve
B) The 'quality function' curve
C) The 'S' curve
D) The 'J' curve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
28
The chances of a failure occurring relates to what when measuring failure?

A) Reliability
B) Quality
C) Failure rate
D) Availability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
29
If components in a system are independent, a failure in any individual component will cause the
whole system to fail.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
30
Maintenance work performed only after failure has taken place is known as:

A) Run to breakdown (RTB)
B) Condition-based maintenance (CBM)
C) Preventive maintenance (PM)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
31
For a system composed of 10 interdependent components that each have individual reliability of .99, the overall system reliability is:

A) .40
B) .60
C) .90
D) .99
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
32
The sequence of questions at an automatic cash machine is designed to prevent:

A) Customer failure
B) Design failure
C) Facilities failure
D) People failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
33
The ability of a system, product or service to perform as expected over time is a measure of:

A) Assurance
B) Availability
C) Validity
D) Reliability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
34
Failure rate can be measured as a percentage of the total number of products tested or as the:

A) Number of failures per batch.
B) Number of failures over operating time.
C) Defective parts per million.
D) Average failure point.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
35
The amount of available operating time relates to what when measuring failure?

A) Availability
B) Failure rate
C) Quality
D) Reliability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
36
The stage where early failures occur caused by defective parts or improper use is called:

A) The 'infant mortality' stage
B) The 'initial failure' stage
C) The 'wear out' stage
D) The 'crash and burn' stage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
37
Reliability is one measure of the consequences of failure of the operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
38
The misuse of the products and services that the operation has created is an example of:

A) People failure
B) Design failure
C) Supplier failure
D) Customer failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
39
Failure of a band to turn up to a couple's wedding is an example of a ________ error.

A) Supplier
B) People
C) Design
D) Facilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
40
The more interdependent components in a system:

A) The lower its reliability
B) The more robust to failure
C) The higher its reliability
D) The greater the level of customer satisfaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
41
Having backup systems or components in case of failure is a called:

A) Designing out fail points
B) Building in redundancy
C) Fail-safing
D) Poka-yoke
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
42
Identifying product or service features that are critical to various types of failure involves the use of what technique?

A) Complaints
B) FMEA
C) Critical incident
D) Critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
43
At the end of a service, staff may formally or informally check that the service has been satisfactory and try to solicit problems as well as compliments. This is an example of:

A) Feedback sheets
B) Focus groups
C) Questionnaires
D) Point of departure interviews
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
44
Analysing the content of customer complaints to understand better the nature of the problem as it is perceived by the customer is called:

A) Critical incident technique
B) Path analysis
C) Complaint analysis
D) Customer-focused analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
45
The dominant maintenance mode when the consequences of equipment failure are high is:

A) Product-focused maintenance
B) Condition-based maintenance
C) Needs maintenance
D) Preventive maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following is a criticism levelled against Total Productive Maintenance?

A) It reduces machine effectiveness.
B) It tends to recommend preventive maintenance when it would be inappropriate.
C) It is hard to manage.
D) It leads to unplanned maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
47
Availability is calculated as the mean time between failures (MTBF) divided by:

A) MTTR
B) Average fail point
C) (MTBF + MTTR)
D) (MTTR - MTBF)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following is NOT one of the 'three tasks of failure prevention and recovery'?

A) Coping when things go wrong
B) Dealing with staff dissatisfaction
C) Finding out what is going wrong and why
D) Preventing things from going wrong
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
49
The mean time between failures (MTBF) is calculated as operating hours divided by:

A) Mean time to repair (MTTR)
B) Average failure rate
C) Availability of machines
D) Number of failures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
50
In some service organisations it is believed that for every one customer who has complained there are:

A) 2 who have not
B) 20 who have not
C) 200 who have not
D) 2000 who have not
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
51
One of the critical activities for an organisation when a failure has occurred is to understand why it has occurred. This activity is called:

A) Critical path analysis
B) Feedback looping
C) Accident investigation
D) Failure analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
52
Attempts to eliminate or reduce the chances of failure by servicing facilities at pre-planned intervals is termed:

A) Condition-based maintenance
B) Preventive maintenance
C) Run to breakdown maintenance
D) Product-focused maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 52 في هذه المجموعة.