Deck 15: Introduction to Programmable Control

ملء الشاشة (f)
exit full mode
سؤال
The compilation of all available instructions for a given PLC is called the ____.

A) instruction ladder
B) instruction set
C) block diagram
D) configuration
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Through a sophisticated system of digital signal transmission and reception, binary data can be organized in a structured format called a(n) ____.

A) protocol
B) Ethernet
C) instruction set
D) data highway
سؤال
In industrial applications where the PLC will replace the relay logic circuit, the operator controls and process switches will generally remain as they are wired.
سؤال
The time required for the PLC to complete one scan (read inputs, solve logic, and update outputs) is called the scan time. A typical value for scan time is in the order of ____.

A) 20 msec
B) 20 ns
C) 20 μ\mu s
D) 20 seconds
سؤال
The input signal must be converted to a(n) ____ logic voltage for use in the processor.

A) high voltage DC
B) low-level AC
C) analog
D) low-level DC
سؤال
The most common PLC programming language used in industry is called ____________________.
سؤال
The only devices in the decision maker category for the PLC system are the ___________________ that reside in the PLC logic program.
سؤال
Volatile memory will lose its programmed contents if operating power is removed or lost.
سؤال
By definition, ____________________ devices are all devices outside the processor, including all hardware.
سؤال
A PLC system offers many advantages over a relay-based control system except that it can be difficult to implement.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Introduction to Programmable Control
1
The compilation of all available instructions for a given PLC is called the ____.

A) instruction ladder
B) instruction set
C) block diagram
D) configuration
B
2
Through a sophisticated system of digital signal transmission and reception, binary data can be organized in a structured format called a(n) ____.

A) protocol
B) Ethernet
C) instruction set
D) data highway
A
3
In industrial applications where the PLC will replace the relay logic circuit, the operator controls and process switches will generally remain as they are wired.
True
4
The time required for the PLC to complete one scan (read inputs, solve logic, and update outputs) is called the scan time. A typical value for scan time is in the order of ____.

A) 20 msec
B) 20 ns
C) 20 μ\mu s
D) 20 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
The input signal must be converted to a(n) ____ logic voltage for use in the processor.

A) high voltage DC
B) low-level AC
C) analog
D) low-level DC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
The most common PLC programming language used in industry is called ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
The only devices in the decision maker category for the PLC system are the ___________________ that reside in the PLC logic program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
Volatile memory will lose its programmed contents if operating power is removed or lost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
By definition, ____________________ devices are all devices outside the processor, including all hardware.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
A PLC system offers many advantages over a relay-based control system except that it can be difficult to implement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.