Deck 7: Integer Linear Programming

ملء الشاشة (f)
exit full mode
سؤال
The LP Relaxation contains the objective function and constraints of the IP problem, but drops all integer restrictions.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
If the acceptance of project A is conditional on the acceptance of project B, and vice versa, the appropriate constraint to use is a

A) multiple-choice constraint.
B) k out of n alternatives constraint.
C) mutually exclusive constraint.
D) corequisite constraint.
سؤال
The 0-1 variables in the fixed cost models correspond to

A) a process for which a fixed cost occurs.
B) the number of products produced.
C) the number of units produced.
D) the actual value of the fixed cost.
سؤال
Which of the following is the most useful contribution of integer programming?

A) finding whole number solutions where fractional solutions would not be appropriate
B) using 0-1 variables for modeling flexibility
C) increased ease of solution
D) provision for solution procedures for transportation and assignment problems
سؤال
Rounded solutions to linear programs must be evaluated for

A) feasibility and optimality.
B) sensitivity and duality.
C) relaxation and boundedness.
D) each of these choices are true.
سؤال
To perform sensitivity analysis involving an integer linear program, it is recommended to

A) use the dual prices very cautiously.
B) make multiple computer runs.
C) use the same approach as you would for a linear program.
D) use LP relaxation.
سؤال
In a model, x1 \ge 0 and integer, x2 \ge 0, and x3 = 0, 1. Which solution would not be feasible?

A) x1 = 5, x2 = 3, x3 = 0
B) x1 = 4, x2 = .389, x3 = 1
C) x1 = 2, x2 = 3, x3 = .578
D) x1 = 0, x2 = 8, x3 = 0
سؤال
Let x1 and x2 be 0 - 1 variables whose values indicate whether projects 1 and 2 are not done or are done. Which answer below indicates that project 2 can be done only if project 1 is done?

A) x1 + x2 = 1
B) x1 + x2 = 2
C) x1 - x2 \le 0
D) x1-x2 \ge 0
سؤال
The graph of a problem that requires x1 and x2 to be integer has a feasible region

A) the same as its LP relaxation.
B) of dots.
C) of horizontal stripes.
D) of vertical stripes.
سؤال
In an all-integer linear program,

A) all objective function coefficients must be integer.
B) all right-hand side values must be integer.
C) all variables must be integer.
D) all objective function coefficients and right-hand side values must be integer.
سؤال
The solution to the LP Relaxation of a minimization problem will always be less than or equal to the value of the integer program minimization problem.
سؤال
Let x1 , x2 , and x3 be 0 - 1 variables whose values indicate whether the projects are not done (0) or are done (1). Which answer below indicates that at least two of the projects must be done?

A) x1 + x2 + x3 \ge 2
B) x1 + x2 + x3 \le 2
C) x1 + x2 + x3 = 2
D) x1 - x2 = 0
سؤال
Sensitivity analysis for integer linear programming

A) can be provided only by computer.
B) has precisely the same interpretation as that from linear programming.
C) does not have the same interpretation and should be disregarded.
D) is most useful for 0 - 1 models.
سؤال
Most practical applications of integer linear programming involve

A) only 0-1 integer variables and not ordinary integer variables.
B) mostly ordinary integer variables and a small number of 0-1 integer variables.
C) only ordinary integer variables.
D) a near equal number of ordinary integer variables and 0-1 integer variables.
سؤال
Rounding the solution of an LP Relaxation to the nearest integer values provides

A) a feasible but not necessarily optimal integer solution.
B) an integer solution that is optimal.
C) an integer solution that might be neither feasible nor optimal.
D) an infeasible solution.
سؤال
Modeling a fixed cost problem as an integer linear program requires

A) adding the fixed costs to the corresponding variable costs in the objective function.
B) using 0-1 variables.
C) using multiple-choice constraints.
D) using LP relaxation.
سؤال
Slack and surplus variables are not useful in integer linear programs.
سؤال
In general, rounding large values of decision variables to the nearest integer value causes fewer problems than rounding small values.
سؤال
If the optimal solution to the LP relaxation problem is integer, it is the optimal solution to the integer linear program.
سؤال
The solution to the LP Relaxation of a maximization integer linear program provides

A) an upper bound for the value of the objective function.
B) a lower bound for the value of the objective function.
C) an upper bound for the value of the decision variables
D) a lower bound for the value of the decision variables
سؤال
If Project 5 must be completed before Project 6, the constraint would be x5- x6 \le 0.
سؤال
Your express package courier company is drawing up new zones for the location of drop boxes for customers. The city has been divided into the seven zones shown below. You have targeted six possible locations for drop boxes. The list of which drop boxes could be reached easily from each zone is listed below.
Your express package courier company is drawing up new zones for the location of drop boxes for customers. The city has been divided into the seven zones shown below. You have targeted six possible locations for drop boxes. The list of which drop boxes could be reached easily from each zone is listed below.   Let x<sub>i</sub> = 1 if drop box location i is used, 0 otherwise. Develop a model to provide the smallest number of locations yet make sure that each zone is covered by at least two boxes.<div style=padding-top: 35px> Let xi = 1 if drop box location i is used, 0 otherwise. Develop a model to provide the smallest number of locations yet make sure that each zone is covered by at least two boxes.
سؤال
In a model involving fixed costs, the 0 - 1 variable guarantees that the capacity is not available unless the cost has been incurred.
سؤال
Dual prices cannot be used for integer programming sensitivity analysis because they are designed for linear programs.
سؤال
Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel required for each project, and the expected profits for each project are summarized in the following table:
Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel required for each project, and the expected profits for each project are summarized in the following table:   Formulate an integer program that maximizes Tower's profit subject to the following management constraints:  <div style=padding-top: 35px> Formulate an integer program that maximizes Tower's profit subject to the following management constraints:
Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel required for each project, and the expected profits for each project are summarized in the following table:   Formulate an integer program that maximizes Tower's profit subject to the following management constraints:  <div style=padding-top: 35px>
سؤال
If the LP relaxation of an integer program has a feasible solution, then the integer program has a feasible solution.
سؤال
The objective of the product design and market share optimization problem presented in the textbook is to choose the levels of each product attribute that will maximize the number of sampled customers preferring the brand in question.
سؤال
The constraint x1 + x2 + x3 + x4 F \le 2 means that two out of the first four projects must be selected.
سؤال
Simplon Manufacturing must decide on the processes to use to produce 1650 units. If machine 1 is used, its production will be between 300 and 1500 units. Machine 2 and/or machine 3 can be used only if machine 1's production is at least 1000 units. Machine 4 can be used with no restrictions.
Simplon Manufacturing must decide on the processes to use to produce 1650 units. If machine 1 is used, its production will be between 300 and 1500 units. Machine 2 and/or machine 3 can be used only if machine 1's production is at least 1000 units. Machine 4 can be used with no restrictions.   (HINT: Use an additional 0 - 1 variable to indicate when machines 2 and 3 can be used.)<div style=padding-top: 35px> (HINT: Use an additional 0 - 1 variable to indicate when machines 2 and 3 can be used.)
سؤال
Hansen Controls has been awarded a contract for a large number of control panels. To meet this demand, it will use its existing plants in San Diego and Houston, and consider new plants in Tulsa, St. Louis, and Portland. Finished control panels are to be shipped to Seattle, Denver, and Kansas City. Pertinent information is given in the table.
Hansen Controls has been awarded a contract for a large number of control panels. To meet this demand, it will use its existing plants in San Diego and Houston, and consider new plants in Tulsa, St. Louis, and Portland. Finished control panels are to be shipped to Seattle, Denver, and Kansas City. Pertinent information is given in the table.   Develop a model whose solution would reveal which plants to build and the optimal shipping schedule.<div style=padding-top: 35px> Develop a model whose solution would reveal which plants to build and the optimal shipping schedule.
سؤال
If x1 + x2 \le 500y1 and y1 is 0 - 1, then if y1 is 0, x1 and x2 will be 0.
سؤال
The constraint x1-x2 = 0 implies that if project 1 is selected, project 2 cannot be.
سؤال
Generally, the optimal solution to an integer linear program is less sensitive to the constraint coefficients than is a linear program.
سؤال
The classic assignment problem can be modeled as a 0-1 integer program.
سؤال
A multiple choice constraint involves selecting k out of n alternatives, where k \ge 2.
سؤال
If a problem has only less-than-or-equal-to constraints with positive coefficients for the variables, rounding down will always provide a feasible integer solution.
سؤال
The product design and market share optimization problem presented in the textbook is formulated as a 0-1 integer linear programming model.
سؤال
Grush Consulting has five projects to consider. Each will require time in the next two quarters according to the table below.
Grush Consulting has five projects to consider. Each will require time in the next two quarters according to the table below.   Revenue from each project is also shown. Develop a model whose solution would maximize revenue, meet the time budget of 25 in the first quarter and 20 in the second quarter, and not do both projects C and D.<div style=padding-top: 35px> Revenue from each project is also shown. Develop a model whose solution would maximize revenue, meet the time budget of 25 in the first quarter and 20 in the second quarter, and not do both projects C and D.
سؤال
Multiple choice constraints involve binary variables.
سؤال
Some linear programming problems have a special structure that guarantees the variables will have integer values.
سؤال
Kloos Industries has projected the availability of capital over each of the next three years to be $850,000, $1,000,000, and $1,200,000, respectively. It is considering four options for the disposition of the capital:
Kloos Industries has projected the availability of capital over each of the next three years to be $850,000, $1,000,000, and $1,200,000, respectively. It is considering four options for the disposition of the capital:   Monies not invested in these projects in a given year will NOT be available for following year's investment in the projects. The expected benefits three years hence from each of the four projects and the yearly capital outlays of the four options are summarized in the table below in $1,000,000's. In addition, Kloos has decided to undertake exactly two of the projects, and if plant expansion is selected, it will also modernize its current facilities.   Formulate and solve this problem as a binary programming problem.<div style=padding-top: 35px> Monies not invested in these projects in a given year will NOT be available for following year's investment in the projects. The expected benefits three years hence from each of the four projects and the yearly capital outlays of the four options are summarized in the table below in $1,000,000's.
In addition, Kloos has decided to undertake exactly two of the projects, and if plant expansion is selected, it will also modernize its current facilities.
Kloos Industries has projected the availability of capital over each of the next three years to be $850,000, $1,000,000, and $1,200,000, respectively. It is considering four options for the disposition of the capital:   Monies not invested in these projects in a given year will NOT be available for following year's investment in the projects. The expected benefits three years hence from each of the four projects and the yearly capital outlays of the four options are summarized in the table below in $1,000,000's. In addition, Kloos has decided to undertake exactly two of the projects, and if plant expansion is selected, it will also modernize its current facilities.   Formulate and solve this problem as a binary programming problem.<div style=padding-top: 35px> Formulate and solve this problem as a binary programming problem.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/41
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Integer Linear Programming
1
The LP Relaxation contains the objective function and constraints of the IP problem, but drops all integer restrictions.
True
2
If the acceptance of project A is conditional on the acceptance of project B, and vice versa, the appropriate constraint to use is a

A) multiple-choice constraint.
B) k out of n alternatives constraint.
C) mutually exclusive constraint.
D) corequisite constraint.
D
3
The 0-1 variables in the fixed cost models correspond to

A) a process for which a fixed cost occurs.
B) the number of products produced.
C) the number of units produced.
D) the actual value of the fixed cost.
A
4
Which of the following is the most useful contribution of integer programming?

A) finding whole number solutions where fractional solutions would not be appropriate
B) using 0-1 variables for modeling flexibility
C) increased ease of solution
D) provision for solution procedures for transportation and assignment problems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
5
Rounded solutions to linear programs must be evaluated for

A) feasibility and optimality.
B) sensitivity and duality.
C) relaxation and boundedness.
D) each of these choices are true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
6
To perform sensitivity analysis involving an integer linear program, it is recommended to

A) use the dual prices very cautiously.
B) make multiple computer runs.
C) use the same approach as you would for a linear program.
D) use LP relaxation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
7
In a model, x1 \ge 0 and integer, x2 \ge 0, and x3 = 0, 1. Which solution would not be feasible?

A) x1 = 5, x2 = 3, x3 = 0
B) x1 = 4, x2 = .389, x3 = 1
C) x1 = 2, x2 = 3, x3 = .578
D) x1 = 0, x2 = 8, x3 = 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
8
Let x1 and x2 be 0 - 1 variables whose values indicate whether projects 1 and 2 are not done or are done. Which answer below indicates that project 2 can be done only if project 1 is done?

A) x1 + x2 = 1
B) x1 + x2 = 2
C) x1 - x2 \le 0
D) x1-x2 \ge 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
9
The graph of a problem that requires x1 and x2 to be integer has a feasible region

A) the same as its LP relaxation.
B) of dots.
C) of horizontal stripes.
D) of vertical stripes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
10
In an all-integer linear program,

A) all objective function coefficients must be integer.
B) all right-hand side values must be integer.
C) all variables must be integer.
D) all objective function coefficients and right-hand side values must be integer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
11
The solution to the LP Relaxation of a minimization problem will always be less than or equal to the value of the integer program minimization problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
12
Let x1 , x2 , and x3 be 0 - 1 variables whose values indicate whether the projects are not done (0) or are done (1). Which answer below indicates that at least two of the projects must be done?

A) x1 + x2 + x3 \ge 2
B) x1 + x2 + x3 \le 2
C) x1 + x2 + x3 = 2
D) x1 - x2 = 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
13
Sensitivity analysis for integer linear programming

A) can be provided only by computer.
B) has precisely the same interpretation as that from linear programming.
C) does not have the same interpretation and should be disregarded.
D) is most useful for 0 - 1 models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
14
Most practical applications of integer linear programming involve

A) only 0-1 integer variables and not ordinary integer variables.
B) mostly ordinary integer variables and a small number of 0-1 integer variables.
C) only ordinary integer variables.
D) a near equal number of ordinary integer variables and 0-1 integer variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
15
Rounding the solution of an LP Relaxation to the nearest integer values provides

A) a feasible but not necessarily optimal integer solution.
B) an integer solution that is optimal.
C) an integer solution that might be neither feasible nor optimal.
D) an infeasible solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
16
Modeling a fixed cost problem as an integer linear program requires

A) adding the fixed costs to the corresponding variable costs in the objective function.
B) using 0-1 variables.
C) using multiple-choice constraints.
D) using LP relaxation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
17
Slack and surplus variables are not useful in integer linear programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
18
In general, rounding large values of decision variables to the nearest integer value causes fewer problems than rounding small values.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
19
If the optimal solution to the LP relaxation problem is integer, it is the optimal solution to the integer linear program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
20
The solution to the LP Relaxation of a maximization integer linear program provides

A) an upper bound for the value of the objective function.
B) a lower bound for the value of the objective function.
C) an upper bound for the value of the decision variables
D) a lower bound for the value of the decision variables
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
21
If Project 5 must be completed before Project 6, the constraint would be x5- x6 \le 0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
22
Your express package courier company is drawing up new zones for the location of drop boxes for customers. The city has been divided into the seven zones shown below. You have targeted six possible locations for drop boxes. The list of which drop boxes could be reached easily from each zone is listed below.
Your express package courier company is drawing up new zones for the location of drop boxes for customers. The city has been divided into the seven zones shown below. You have targeted six possible locations for drop boxes. The list of which drop boxes could be reached easily from each zone is listed below.   Let x<sub>i</sub> = 1 if drop box location i is used, 0 otherwise. Develop a model to provide the smallest number of locations yet make sure that each zone is covered by at least two boxes. Let xi = 1 if drop box location i is used, 0 otherwise. Develop a model to provide the smallest number of locations yet make sure that each zone is covered by at least two boxes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
23
In a model involving fixed costs, the 0 - 1 variable guarantees that the capacity is not available unless the cost has been incurred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
24
Dual prices cannot be used for integer programming sensitivity analysis because they are designed for linear programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
25
Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel required for each project, and the expected profits for each project are summarized in the following table:
Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel required for each project, and the expected profits for each project are summarized in the following table:   Formulate an integer program that maximizes Tower's profit subject to the following management constraints:  Formulate an integer program that maximizes Tower's profit subject to the following management constraints:
Tower Engineering Corporation is considering undertaking several proposed projects for the next fiscal year. The projects, the number of engineers and the number of support personnel required for each project, and the expected profits for each project are summarized in the following table:   Formulate an integer program that maximizes Tower's profit subject to the following management constraints:
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
26
If the LP relaxation of an integer program has a feasible solution, then the integer program has a feasible solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
27
The objective of the product design and market share optimization problem presented in the textbook is to choose the levels of each product attribute that will maximize the number of sampled customers preferring the brand in question.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
28
The constraint x1 + x2 + x3 + x4 F \le 2 means that two out of the first four projects must be selected.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
29
Simplon Manufacturing must decide on the processes to use to produce 1650 units. If machine 1 is used, its production will be between 300 and 1500 units. Machine 2 and/or machine 3 can be used only if machine 1's production is at least 1000 units. Machine 4 can be used with no restrictions.
Simplon Manufacturing must decide on the processes to use to produce 1650 units. If machine 1 is used, its production will be between 300 and 1500 units. Machine 2 and/or machine 3 can be used only if machine 1's production is at least 1000 units. Machine 4 can be used with no restrictions.   (HINT: Use an additional 0 - 1 variable to indicate when machines 2 and 3 can be used.) (HINT: Use an additional 0 - 1 variable to indicate when machines 2 and 3 can be used.)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
30
Hansen Controls has been awarded a contract for a large number of control panels. To meet this demand, it will use its existing plants in San Diego and Houston, and consider new plants in Tulsa, St. Louis, and Portland. Finished control panels are to be shipped to Seattle, Denver, and Kansas City. Pertinent information is given in the table.
Hansen Controls has been awarded a contract for a large number of control panels. To meet this demand, it will use its existing plants in San Diego and Houston, and consider new plants in Tulsa, St. Louis, and Portland. Finished control panels are to be shipped to Seattle, Denver, and Kansas City. Pertinent information is given in the table.   Develop a model whose solution would reveal which plants to build and the optimal shipping schedule. Develop a model whose solution would reveal which plants to build and the optimal shipping schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
31
If x1 + x2 \le 500y1 and y1 is 0 - 1, then if y1 is 0, x1 and x2 will be 0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
32
The constraint x1-x2 = 0 implies that if project 1 is selected, project 2 cannot be.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
33
Generally, the optimal solution to an integer linear program is less sensitive to the constraint coefficients than is a linear program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
34
The classic assignment problem can be modeled as a 0-1 integer program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
35
A multiple choice constraint involves selecting k out of n alternatives, where k \ge 2.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
36
If a problem has only less-than-or-equal-to constraints with positive coefficients for the variables, rounding down will always provide a feasible integer solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
37
The product design and market share optimization problem presented in the textbook is formulated as a 0-1 integer linear programming model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
38
Grush Consulting has five projects to consider. Each will require time in the next two quarters according to the table below.
Grush Consulting has five projects to consider. Each will require time in the next two quarters according to the table below.   Revenue from each project is also shown. Develop a model whose solution would maximize revenue, meet the time budget of 25 in the first quarter and 20 in the second quarter, and not do both projects C and D. Revenue from each project is also shown. Develop a model whose solution would maximize revenue, meet the time budget of 25 in the first quarter and 20 in the second quarter, and not do both projects C and D.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
39
Multiple choice constraints involve binary variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
40
Some linear programming problems have a special structure that guarantees the variables will have integer values.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
41
Kloos Industries has projected the availability of capital over each of the next three years to be $850,000, $1,000,000, and $1,200,000, respectively. It is considering four options for the disposition of the capital:
Kloos Industries has projected the availability of capital over each of the next three years to be $850,000, $1,000,000, and $1,200,000, respectively. It is considering four options for the disposition of the capital:   Monies not invested in these projects in a given year will NOT be available for following year's investment in the projects. The expected benefits three years hence from each of the four projects and the yearly capital outlays of the four options are summarized in the table below in $1,000,000's. In addition, Kloos has decided to undertake exactly two of the projects, and if plant expansion is selected, it will also modernize its current facilities.   Formulate and solve this problem as a binary programming problem. Monies not invested in these projects in a given year will NOT be available for following year's investment in the projects. The expected benefits three years hence from each of the four projects and the yearly capital outlays of the four options are summarized in the table below in $1,000,000's.
In addition, Kloos has decided to undertake exactly two of the projects, and if plant expansion is selected, it will also modernize its current facilities.
Kloos Industries has projected the availability of capital over each of the next three years to be $850,000, $1,000,000, and $1,200,000, respectively. It is considering four options for the disposition of the capital:   Monies not invested in these projects in a given year will NOT be available for following year's investment in the projects. The expected benefits three years hence from each of the four projects and the yearly capital outlays of the four options are summarized in the table below in $1,000,000's. In addition, Kloos has decided to undertake exactly two of the projects, and if plant expansion is selected, it will also modernize its current facilities.   Formulate and solve this problem as a binary programming problem. Formulate and solve this problem as a binary programming problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 41 في هذه المجموعة.