Deck 15: Agile Project Management

ملء الشاشة (f)
exit full mode
سؤال
Freezing the design as late as possible is a common characteristic of the agile project management model.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
When the project scope and / or technology are not fully known, things become much less predictable.
سؤال
Securing the cooperation of customers to devote the necessary time to support agile project management is a common source of frustration in the field.
سؤال
In Scrum methodology, it is important to make sure roles and titles are clearfor the development team.
سؤال
Fixed scope is part of the agile project management model.
سؤال
Scrum does not use any of the conventional project management tools like Gantt charts or network diagrams.
سؤال
Traditional project management requires a significant degree of predictability to be effective.
سؤال
Specific features are created using Scrum methodology according to four distinct phases: analysis, design, monitor, and test.
سؤال
Continuous improvement is a principle found in most agile project management methods. It is demonstrated when teams reflect, learn, and adapt to change; work updates the plan.
سؤال
In agile project management, projects evolve rather than are executed.
سؤال
The purpose of release planning is to establish the goals and a general WBS for the project.
سؤال
Agile project management does not satisfy top management's need for budget, scope, and schedule control.
سؤال
Traditional approaches to project management concentrate firmly on thorough planning up front.
سؤال
Project difficulty varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
سؤال
A sprint burndown chart is used to monitor progress toward completion of the project.
سؤال
Each new iteration replaces the work of the previous iterations and adds new capabilities to the evolving to produce a next expanded version of the product.
سؤال
Agile project management is ideal for exploratory projects in which requirements need to be discovered and new technology tested.
سؤال
The Scrum master is not the leader of the team but acts as a buffer between the team and outside interferences.
سؤال
Owners have the option to change features and priorities at the end of each sprint if desired. However, no changes should be made once a sprint has started.
سؤال
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time. This is called staging.
سؤال
Iterations are short time frames (time boxes) that typically last from __________.

A) 1-4 days
B) 1-2 weeks
C) 1-4 weeks
D) 4-7 weeks
E) 7-12 weeks
سؤال
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when employing business-driven prioritizations of requirements and features to satisfy customer needs?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
سؤال
A disadvantage of an iterative development process used in agile project management is that it is difficult to detect defects and problems early.
سؤال
When considering the agile project management process, at the end of each iteration

A) team members are released to work on other projects.
B) the Scrum master assigns daily tasks to team members.
C) product owner determines whether or not the project is complete.
D) the Scrum master can terminate the project.
E) stakeholders and customers review progress and reevaluate priorities.
سؤال
Scrum uses a series of coordinated meetings to manage the development process. Which of the following is held at the start of each sprint? During this meeting the product owner and development team negotiate which product backlog items the team will attempt during the next sprint.

A) Sprint planning meeting
B) Release planning meeting
C) Sprint review meeting
D) Daily Scrum meeting
E) Sprint retrospective meeting
سؤال
When considering traditional versus agile project management, all the following are part of the traditional project management model EXCEPT

A) fixed scope.
B) deliverables.
C) continuous design.
D) low uncertainty.
E) conventional project teams.
سؤال
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when creating a flow of value to customers by chunking project delivery into small, functioning increments?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
سؤال
Specific features are created using Scrum methodology according to four distinct phases. Which of the following places these phases in the correct order?

A) Design, Build, Analysis, Test
B) Monitor, Design, Build, Test
C) Analysis, Design, Build, Test
D) Design, Build, Monitor, Test
E) Analysis, Design, Build, Monitor
سؤال
Using traditional approaches to project management, once the project scope has been firmly established, every detail of the project is defined through the __________.

A) deliverables
B) job tickets
C) WBS
D) estimates
E) risks
سؤال
The goal of each sprint is to produce fully functional features that can be released to, and used by, the customer.
سؤال
Scrum relies on three key roles. A person who facilitates the Scrum process and resolves impediments at the team and organizational level is called a

A) scrum master.
B) project champion.
C) scrum leader.
D) product owner.
E) production coordinator.
سؤال
The product owner has the option to change features and priorities at the end of each sprint if desired.
سؤال
Agile methods appear to work best on small projects that require only five to nine dedicated team members to complete the work.
سؤال
When considering traditional versus agile project management, all the following are part of the agile project management model EXCEPT

A) flexibility.
B) high uncertainty.
C) embrace change.
D) design up front.
E) self-organized project teams.
سؤال
When determining project uncertainty, __________ can be a source of unpredictability.

A) technology
B) clients
C) vendors
D) sponsors
E) WBS
سؤال
Iterative development processes provide the following important advantages EXCEPT

A) continuous integration of the evolving product.
B) frequent demonstration of progress to increase the likelihood that the end product will satisfy customer needs.
C) early detection of defects and problems.
D) ease of comparing actual information against planned.
E) constant verification and validation of the evolving product.
سؤال
The third phase of the Scrum development process is to build the feature so that it is functional.
سؤال
Project__________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.

A) stability
B) balance
C) unity
D) uncertainty
E) degree
سؤال
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.

A) project managers
B) customers
C) sponsors
D) team leaders
E) All of these alternatives are correct.
سؤال
__________represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.

A) Agile project management
B) Extreme project management
C) Uncertain project management
D) Focused project management
E) Interactive project management
سؤال
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when team members decide among themselves who should do what and what should be done?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
سؤال
Scrum relies on three key roles. A person who acts on behalf of customers to represent their interests and who is responsible for ensuring that the development team focuses their efforts on developing a project that will fulfill the business objective of the project is called a

A) customer service representative.
B) project champion.
C) customer liaison.
D) product owner.
E) production coordinator.
سؤال
A__________ is defined as a piece of a product that delivers some useful functionality to a customer.

A) scrum
B) value
C) spirit
D) feature
E) priority
سؤال
Scrum uses a series of coordinated meetings to manage the development process. During which of the following are goals and the general plan for the project established?

A) Sprint planning meeting
B) Release planning meeting
C) Sprint review meeting
D) Daily scrum meeting
E) Sprint retrospective meeting
سؤال
A new holistic approach in new commercial product development efforts where the cross-functional team collaborating to develop a new product is compared to rugby, where the whole team tries to go the distance as a unit is known as

A) scrum.
B) specific project management.
C) traditional project management.
D) prioritized WBS.
E) functional teams.
سؤال
Specific features are created using Scrum methodology according to four distinct phases. Which of the following is NOT one of these phases?

A) Analysis
B) Monitor
C) Build
D) Test
E) Design
سؤال
__________represents the amount of work the team commits to complete during the next sprint.

A) Sprint backlog
B) Product backlog
C) Project backlog
D) Schedule backlog
E) Task backlog
سؤال
The __________ is the customer's prioritized list of key features desired when the project is completed.

A) project master
B) spirit backlog
C) creative backlog
D) product backlog
E) project list
سؤال
__________is the Agile principle that describes project team members deciding amongst themselves what should be done and who is best suited for it on the team.

A) Focus on Customer Value
B) Iterative and Incremental Delivery
C) Self-Organization
D) Experimentation and Adaption
E) Continuous Improvement
سؤال
Which of the following is NOT true of a development team using Scrum methodology?

A) The team is self-organizing.
B) They have the authority to change features and priorities at the end of each sprint.
C) The team is typically made up of 5 to 9 people.
D) They are responsible for achieving the commitments they make at the sprint planning and review meetings.
E) There are no designated roles or titles.
سؤال
__________is the Agile principle that describes the process that teams go through to solve problems to deliver on features expressed by the stakeholder(s).

A) Continuous Improvement
B) Experimentation and Adaption
C) Self-Organization
D) Focus on Customer Value
E) Iterative and Incremental Delivery
سؤال
For some agile projects,__________ are established, which is the maximum budget that should not be exceeded in the development of a given product or service.

A) project accounts
B) contingencies
C) agile accounts
D) ceilings
E) scrum logs
سؤال
Scrum uses a series of coordinated meetings to manage the development process. During which of the following is it discussed what was done since the last meeting, what will be done before the next meeting, and if anything is limiting performance?

A) Sprint planning meeting
B) Release planning meeting
C) Sprint review meeting
D) Daily Scrum meeting
E) Sprint retrospective meeting
سؤال
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when testing assumptions early and building working prototypes to solicit customer feedback and refine product requirements?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
سؤال
Traditional project management practices require

A) new technology.
B) a high degree of predictability.
C) variability in requirements.
D) distributed project management.
E) unstable scope.
سؤال
__________is the Agile principle in which the team creates a flow of value to the stakeholder(s) or customer(s) by delivering smaller, functional increments of the project.

A) Focus on Customer Value
B) Experimentation and Adaption
C) Self-Organization
D) Iterative and Incremental Delivery
E) Servant Leadership
سؤال
__________is the Agile principle where the project team uses business-driven prioritization of requirements and features.

A) Focus on Customer Value
B) Iterative and Incremental Delivery
C) Self-Organization
D) Experimentation and Adaption
E) Continuous Improvement
سؤال
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time. In practice this condition is called

A) incremental delivery.
B) staging.
C) feature collaboration.
D) scrum.
E) scaling.
سؤال
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when teams reflect, learn, and adapt to change, and when project work updates the plan?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
سؤال
In order to hedge against unpredictability within a project, Agile Project Management uses

A) a different risk management process.
B) phase gates.
C) an adaptive and experimental approach.
D) strict budget constraints.
E) fixed budget and time constraints.
سؤال
At the end of each sprint, the team demonstrate the actual work product increments they have built to the__________ and__________ as part of a Sprint review.

A) scrum master, users
B) product owner, other relevant stakeholders
C) scrum master, program manager
D) project master, other relevant stakeholders
E) product owner, scrum master
سؤال
In place of a product WBS, Scrum uses product__________ as deliverables.

A) requirements
B) features
C) functions
D) components
E) work products
سؤال
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The third phase is to__________ the feature so that it is functional.

A) design
B) build
C) testing
D) delivery
E) analysis
سؤال
Which of the following models / methods is not an agile method?

A) Scrum.
B) Waterfall.
C) Extreme Programming (XP).
D) RUP (Rational Unified Process).
E) Crystal Clear.
سؤال
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The first phase is__________ and review of functional requirements that will be needed to complete the feature.

A) design
B) build
C) testing
D) delivery
E) analysis
سؤال
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The second phase is the development of a__________ that meets the requirements of the feature.

A) design
B) build
C) testing
D) delivery
E) analysis
سؤال
__________project management requires a fairly high degree of predictability to be effective.

A) Agile
B) Traditional
C) Mature
D) Dedicated
E) Matrix
سؤال
Using Scrum methodology, a(n) _________ is typically made up of five to nine people with cross-functional skill sets.

A) sprint crew
B) scrum group
C) iteration team
D) development team
E) management team
سؤال
Which of the following is not one of the four value statements of the agile manifesto?

A) Individuals and interactions over processes and tools.
B) Working software over comprehensive documentation.
C) Customer collaboration over contract negotiation.
D) Established cost and duration over unpredictable cost and duration.
E) Responding to change over following a plan.
سؤال
__________project management involves high and frequent customer interaction.

A) Traditional
B) Predictive
C) Iterative
D) Agile
E) Deterministic
سؤال
Which of the following is not a name given to key roles of the scrum process?

A) Development team
B) Scrum master
C) Self-organizing team
D) Product owner
E) XP master
سؤال
Scrum uses__________ as deliverables.

A) work products
B) work packages
C) product features
D) product functions
E) work function points
سؤال
Short time frames (time boxes) that typically last from one to four weeks are called __________.

A) increments or scrums
B) iterations or sprints
C) waterfalls or scrums
D) iterations or increments
E) waterfalls or sprints
سؤال
__________is the Agile principle that prescribes the project team learning, reflecting and adapting to change within the Project.

A) Continuous Improvement
B) Experimentation and Adaption
C) Self-Organization
D) Focus on Customer Value
E) Servant Leadership
سؤال
A(n)_________ is a person who acts on behalf of customers / end users to represent their interests.

A) continuous delivery
B) product owner
C) sprint master
D) project manager
E) scrum leader
سؤال
The development team is a key role when considering the Scrum process. The team is__________ in the sense that they decide among themselves who should do what and what should be done.

A) a team of volunteers
B) self-managed
C) self-focused
D) self-organized
E) self-led
سؤال
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The last phase includes the__________ and documentation of the feature.

A) design
B) build
C) testing
D) delivery
E) analysis
سؤال
__________projects evolve rather than are executed.

A) Agile
B) Fixed
C) Predictive
D) Traditional
E) Focused
سؤال
When teams reflect, learn, and adapt to change, when their work updates the plan, they are following the agile project management principle of __________.

A) continuous delivery
B) continuous improvement
C) continuous updating
D) continuous learning
E) continuous adapting to change
سؤال
The__________ method assumes essential requirements can be defined up front so the software can be designed, built, tested, and released once at the end.

A) international
B) agile
C) spiral
D) focused
E) waterfall
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Agile Project Management
1
Freezing the design as late as possible is a common characteristic of the agile project management model.
True
2
When the project scope and / or technology are not fully known, things become much less predictable.
True
3
Securing the cooperation of customers to devote the necessary time to support agile project management is a common source of frustration in the field.
True
4
In Scrum methodology, it is important to make sure roles and titles are clearfor the development team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
Fixed scope is part of the agile project management model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
Scrum does not use any of the conventional project management tools like Gantt charts or network diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
Traditional project management requires a significant degree of predictability to be effective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
Specific features are created using Scrum methodology according to four distinct phases: analysis, design, monitor, and test.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
Continuous improvement is a principle found in most agile project management methods. It is demonstrated when teams reflect, learn, and adapt to change; work updates the plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
In agile project management, projects evolve rather than are executed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
The purpose of release planning is to establish the goals and a general WBS for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
Agile project management does not satisfy top management's need for budget, scope, and schedule control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
Traditional approaches to project management concentrate firmly on thorough planning up front.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
Project difficulty varies according to the extent the project scope is known and stable and the technology to be used is known and proven.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
A sprint burndown chart is used to monitor progress toward completion of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
Each new iteration replaces the work of the previous iterations and adds new capabilities to the evolving to produce a next expanded version of the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
Agile project management is ideal for exploratory projects in which requirements need to be discovered and new technology tested.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
The Scrum master is not the leader of the team but acts as a buffer between the team and outside interferences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
Owners have the option to change features and priorities at the end of each sprint if desired. However, no changes should be made once a sprint has started.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time. This is called staging.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
Iterations are short time frames (time boxes) that typically last from __________.

A) 1-4 days
B) 1-2 weeks
C) 1-4 weeks
D) 4-7 weeks
E) 7-12 weeks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when employing business-driven prioritizations of requirements and features to satisfy customer needs?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
A disadvantage of an iterative development process used in agile project management is that it is difficult to detect defects and problems early.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
When considering the agile project management process, at the end of each iteration

A) team members are released to work on other projects.
B) the Scrum master assigns daily tasks to team members.
C) product owner determines whether or not the project is complete.
D) the Scrum master can terminate the project.
E) stakeholders and customers review progress and reevaluate priorities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
Scrum uses a series of coordinated meetings to manage the development process. Which of the following is held at the start of each sprint? During this meeting the product owner and development team negotiate which product backlog items the team will attempt during the next sprint.

A) Sprint planning meeting
B) Release planning meeting
C) Sprint review meeting
D) Daily Scrum meeting
E) Sprint retrospective meeting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
When considering traditional versus agile project management, all the following are part of the traditional project management model EXCEPT

A) fixed scope.
B) deliverables.
C) continuous design.
D) low uncertainty.
E) conventional project teams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when creating a flow of value to customers by chunking project delivery into small, functioning increments?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
Specific features are created using Scrum methodology according to four distinct phases. Which of the following places these phases in the correct order?

A) Design, Build, Analysis, Test
B) Monitor, Design, Build, Test
C) Analysis, Design, Build, Test
D) Design, Build, Monitor, Test
E) Analysis, Design, Build, Monitor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Using traditional approaches to project management, once the project scope has been firmly established, every detail of the project is defined through the __________.

A) deliverables
B) job tickets
C) WBS
D) estimates
E) risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
The goal of each sprint is to produce fully functional features that can be released to, and used by, the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
Scrum relies on three key roles. A person who facilitates the Scrum process and resolves impediments at the team and organizational level is called a

A) scrum master.
B) project champion.
C) scrum leader.
D) product owner.
E) production coordinator.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
The product owner has the option to change features and priorities at the end of each sprint if desired.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Agile methods appear to work best on small projects that require only five to nine dedicated team members to complete the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
When considering traditional versus agile project management, all the following are part of the agile project management model EXCEPT

A) flexibility.
B) high uncertainty.
C) embrace change.
D) design up front.
E) self-organized project teams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
When determining project uncertainty, __________ can be a source of unpredictability.

A) technology
B) clients
C) vendors
D) sponsors
E) WBS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
Iterative development processes provide the following important advantages EXCEPT

A) continuous integration of the evolving product.
B) frequent demonstration of progress to increase the likelihood that the end product will satisfy customer needs.
C) early detection of defects and problems.
D) ease of comparing actual information against planned.
E) constant verification and validation of the evolving product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
The third phase of the Scrum development process is to build the feature so that it is functional.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
Project__________ varies according to the extent the project scope is known and stable and the technology to be used is known and proven.

A) stability
B) balance
C) unity
D) uncertainty
E) degree
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
In many cases, _________ only begin to understand what they actually desire when they are provided with someone's impression of what they want.

A) project managers
B) customers
C) sponsors
D) team leaders
E) All of these alternatives are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
__________represents a fundamental shift away from the traditional plan-driven project management approach by adopting a more experimental and adaptive approach to managing projects.

A) Agile project management
B) Extreme project management
C) Uncertain project management
D) Focused project management
E) Interactive project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when team members decide among themselves who should do what and what should be done?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
Scrum relies on three key roles. A person who acts on behalf of customers to represent their interests and who is responsible for ensuring that the development team focuses their efforts on developing a project that will fulfill the business objective of the project is called a

A) customer service representative.
B) project champion.
C) customer liaison.
D) product owner.
E) production coordinator.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
A__________ is defined as a piece of a product that delivers some useful functionality to a customer.

A) scrum
B) value
C) spirit
D) feature
E) priority
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
Scrum uses a series of coordinated meetings to manage the development process. During which of the following are goals and the general plan for the project established?

A) Sprint planning meeting
B) Release planning meeting
C) Sprint review meeting
D) Daily scrum meeting
E) Sprint retrospective meeting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
A new holistic approach in new commercial product development efforts where the cross-functional team collaborating to develop a new product is compared to rugby, where the whole team tries to go the distance as a unit is known as

A) scrum.
B) specific project management.
C) traditional project management.
D) prioritized WBS.
E) functional teams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
Specific features are created using Scrum methodology according to four distinct phases. Which of the following is NOT one of these phases?

A) Analysis
B) Monitor
C) Build
D) Test
E) Design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
__________represents the amount of work the team commits to complete during the next sprint.

A) Sprint backlog
B) Product backlog
C) Project backlog
D) Schedule backlog
E) Task backlog
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
The __________ is the customer's prioritized list of key features desired when the project is completed.

A) project master
B) spirit backlog
C) creative backlog
D) product backlog
E) project list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
__________is the Agile principle that describes project team members deciding amongst themselves what should be done and who is best suited for it on the team.

A) Focus on Customer Value
B) Iterative and Incremental Delivery
C) Self-Organization
D) Experimentation and Adaption
E) Continuous Improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is NOT true of a development team using Scrum methodology?

A) The team is self-organizing.
B) They have the authority to change features and priorities at the end of each sprint.
C) The team is typically made up of 5 to 9 people.
D) They are responsible for achieving the commitments they make at the sprint planning and review meetings.
E) There are no designated roles or titles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
__________is the Agile principle that describes the process that teams go through to solve problems to deliver on features expressed by the stakeholder(s).

A) Continuous Improvement
B) Experimentation and Adaption
C) Self-Organization
D) Focus on Customer Value
E) Iterative and Incremental Delivery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
For some agile projects,__________ are established, which is the maximum budget that should not be exceeded in the development of a given product or service.

A) project accounts
B) contingencies
C) agile accounts
D) ceilings
E) scrum logs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
Scrum uses a series of coordinated meetings to manage the development process. During which of the following is it discussed what was done since the last meeting, what will be done before the next meeting, and if anything is limiting performance?

A) Sprint planning meeting
B) Release planning meeting
C) Sprint review meeting
D) Daily Scrum meeting
E) Sprint retrospective meeting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when testing assumptions early and building working prototypes to solicit customer feedback and refine product requirements?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
Traditional project management practices require

A) new technology.
B) a high degree of predictability.
C) variability in requirements.
D) distributed project management.
E) unstable scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
__________is the Agile principle in which the team creates a flow of value to the stakeholder(s) or customer(s) by delivering smaller, functional increments of the project.

A) Focus on Customer Value
B) Experimentation and Adaption
C) Self-Organization
D) Iterative and Incremental Delivery
E) Servant Leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
__________is the Agile principle where the project team uses business-driven prioritization of requirements and features.

A) Focus on Customer Value
B) Iterative and Incremental Delivery
C) Self-Organization
D) Experimentation and Adaption
E) Continuous Improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
Agile methods can be used on larger scale projects in which several teams are working on different features at the same time. In practice this condition is called

A) incremental delivery.
B) staging.
C) feature collaboration.
D) scrum.
E) scaling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
While agile project management does not consist of one set method, most methods are based on similar principles. Which of the following agile project management principles would be described when teams reflect, learn, and adapt to change, and when project work updates the plan?

A) Focus on customer value
B) Iterative and incremental delivery
C) Experimentation and adaptation
D) Self-organization
E) Continuous improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
In order to hedge against unpredictability within a project, Agile Project Management uses

A) a different risk management process.
B) phase gates.
C) an adaptive and experimental approach.
D) strict budget constraints.
E) fixed budget and time constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
At the end of each sprint, the team demonstrate the actual work product increments they have built to the__________ and__________ as part of a Sprint review.

A) scrum master, users
B) product owner, other relevant stakeholders
C) scrum master, program manager
D) project master, other relevant stakeholders
E) product owner, scrum master
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
In place of a product WBS, Scrum uses product__________ as deliverables.

A) requirements
B) features
C) functions
D) components
E) work products
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The third phase is to__________ the feature so that it is functional.

A) design
B) build
C) testing
D) delivery
E) analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following models / methods is not an agile method?

A) Scrum.
B) Waterfall.
C) Extreme Programming (XP).
D) RUP (Rational Unified Process).
E) Crystal Clear.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The first phase is__________ and review of functional requirements that will be needed to complete the feature.

A) design
B) build
C) testing
D) delivery
E) analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The second phase is the development of a__________ that meets the requirements of the feature.

A) design
B) build
C) testing
D) delivery
E) analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
__________project management requires a fairly high degree of predictability to be effective.

A) Agile
B) Traditional
C) Mature
D) Dedicated
E) Matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
Using Scrum methodology, a(n) _________ is typically made up of five to nine people with cross-functional skill sets.

A) sprint crew
B) scrum group
C) iteration team
D) development team
E) management team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which of the following is not one of the four value statements of the agile manifesto?

A) Individuals and interactions over processes and tools.
B) Working software over comprehensive documentation.
C) Customer collaboration over contract negotiation.
D) Established cost and duration over unpredictable cost and duration.
E) Responding to change over following a plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
__________project management involves high and frequent customer interaction.

A) Traditional
B) Predictive
C) Iterative
D) Agile
E) Deterministic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
Which of the following is not a name given to key roles of the scrum process?

A) Development team
B) Scrum master
C) Self-organizing team
D) Product owner
E) XP master
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
Scrum uses__________ as deliverables.

A) work products
B) work packages
C) product features
D) product functions
E) work function points
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
Short time frames (time boxes) that typically last from one to four weeks are called __________.

A) increments or scrums
B) iterations or sprints
C) waterfalls or scrums
D) iterations or increments
E) waterfalls or sprints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
__________is the Agile principle that prescribes the project team learning, reflecting and adapting to change within the Project.

A) Continuous Improvement
B) Experimentation and Adaption
C) Self-Organization
D) Focus on Customer Value
E) Servant Leadership
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
A(n)_________ is a person who acts on behalf of customers / end users to represent their interests.

A) continuous delivery
B) product owner
C) sprint master
D) project manager
E) scrum leader
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
The development team is a key role when considering the Scrum process. The team is__________ in the sense that they decide among themselves who should do what and what should be done.

A) a team of volunteers
B) self-managed
C) self-focused
D) self-organized
E) self-led
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The last phase includes the__________ and documentation of the feature.

A) design
B) build
C) testing
D) delivery
E) analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
__________projects evolve rather than are executed.

A) Agile
B) Fixed
C) Predictive
D) Traditional
E) Focused
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
When teams reflect, learn, and adapt to change, when their work updates the plan, they are following the agile project management principle of __________.

A) continuous delivery
B) continuous improvement
C) continuous updating
D) continuous learning
E) continuous adapting to change
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
The__________ method assumes essential requirements can be defined up front so the software can be designed, built, tested, and released once at the end.

A) international
B) agile
C) spiral
D) focused
E) waterfall
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.