Deck 13: Introduction to Optimization Modeling

ملء الشاشة (f)
exit full mode
سؤال
In using Excel® to solve linear programming problems, the objective cell represents the:

A) value of the objective function
B) constraints
C) decision variables
D) total cost of the model
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Reduced costs indicate how much the objective coefficient of a decision variable that is currently 0 or at its upper bound must change before that the value of that variable changes.
سؤال
The set of all values of the decision variable cells that satisfy all constraints, not including the nonnegativity constraints, is called the feasible region.
سؤال
(A) Determine how to minimize the total cost of meeting the next 3 quarters' demand. Assume that 1000 usable units are available at the beginning of quarter 1.

(B) Referring to (A), the company wants to know how much money it would be worth to decrease the percentage of unsuitable items and/or the percentage of items that spoil. Write a short report that provides relevant information. Base your report on two uses of the SolverTable add-in: one where the percentage of unsuitable items decreases and the percentage of items that spoil stays at 10%; and one where the percentage of unsuitable items stays at 20% and the percentage of items that spoil decreases.
سؤال
The divisibility property of LP models simply means that we allow only integer levels of the activities.
سؤال
(A) Determine how to minimize the net cost incurred in meeting the demands for the next four months.
(B) Starting with the optimal solution to (A), use SolverTable add-in to see what happens to the decision variables and the total cost when the initial inventory varies from 0 (the implied value in (A)) to 100 in 10-units increments. How much lower would the total cost be if the company started with 10 units in inventory, rather than none? Would the same cost decrease occur for every 10-init increase in initial inventory?
سؤال
As related to sensitivity analysis in linear programming, when the profit increases with a unit increase in labor, this change in profit is referred to as the:

A) add-in price
B) sensitivity price
C) shadow price
D) additional profit
سؤال
(A) Find an optimal solution to the problem. What is the production plan, and what is the total revenue?
(B) Obtain a sensitivity report for the solution reported in (A). Which constraints are binding?
(C) What is the incremental contribution associated with adding an hour of assembly time? Over what range of increase is the marginal value valid?
(D) What is the value of additional capacity on the polisher? How much increase and decrease in this capacity is possible before a change occurs in the optimal production schedule?
(E) An advertising agency has devised a marketing plan for the Western Chassis Company that will increase the market for Deluxe chassis. The plan will increase demand by 75 Deluxe chassis per month at a cost of $100 per month. Should Western adopt the plan? Briefly explain why.
(F) Suppose that four more hours of chassis assembly time could be made available. How much would profit change?
(G) Suppose next that Western's marketing department proposes lowering the price for a standard chassis from $12 to $11.50 so that more can be sold (since there is slack under the demand constraint). Would the optimal solution change? Explain why, or why not.
(H) If Western could obtain 1,000 pounds more of raw material (steel or aluminum), which should it procure? How much should they be willing to pay per pound for the steel or aluminum? Explain your answer.
(I) In doing some contingency planning, Western thinks that the aging stamping machine will soon need to be taken down for repairs that could last 2 months and will cost $10,000. During that time, they can continue to operate by outsourcing the stamping at $2.50 per chassis (deluxe or standard), although the capacity will be reduced from 2,500 to 1,500. What will be the total cost to repair the stamping machine?
سؤال
A farmer in Egypt owns 50 acres of land. He is going to plant each acre with cotton or corn. Each acre planted with cotton yields $400 profit; each with corn yields $200 profit. The labor and fertilizer used for each acre are given in the table below. Resources available include 150 workers and 200 tons of fertilizer. A farmer in Egypt owns 50 acres of land. He is going to plant each acre with cotton or corn. Each acre planted with cotton yields $400 profit; each with corn yields $200 profit. The labor and fertilizer used for each acre are given in the table below. Resources available include 150 workers and 200 tons of fertilizer.   (A) Formulate a linear programming model that will enable the farmer to determine the number of acres that should be planted cotton and/or corn in order to maximize his profit. ​ (B) Find an optimal solution to the model in (A) and determine the maximum profit. ​ (C) Implement the model in (A) in Excel Solver and obtain an answer report. Which constraints are binding on the optimal solution? ​ (D) Obtain a sensitivity report for the model in (A). How much should the farmer be willing to pay for an additional worker? ​ (E) Suppose the farmer hires 10 additional workers. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Would his planting plan change? Explain your answer. ​ (F) Suppose the farmer now wants to hire 20 additional workers, instead of just 10. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Explain your answer.<div style=padding-top: 35px>
(A) Formulate a linear programming model that will enable the farmer to determine the number of acres that should be planted cotton and/or corn in order to maximize his profit.

(B) Find an optimal solution to the model in (A) and determine the maximum profit.

(C) Implement the model in (A) in Excel Solver and obtain an answer report. Which constraints are binding on the optimal solution?

(D) Obtain a sensitivity report for the model in (A). How much should the farmer be willing to pay for an additional worker?

(E) Suppose the farmer hires 10 additional workers. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Would his planting plan change? Explain your answer.

(F) Suppose the farmer now wants to hire 20 additional workers, instead of just 10. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Explain your answer.
سؤال
A shadow price indicates how much a company would pay for more of a scarce resource.​
سؤال
Proportionality, additivity, and divisibility are three important properties that LP models possess that distinguish them from general mathematical programming models.
سؤال
An efficient algorithm for finding the optimal solution in a linear programming model is the:

A) spreadsheet method
B) solution mix method
C) complex method
D) simplex method
سؤال
Suppose the allowable increase and decrease for an objective coefficient of a decision variable that has a current value of $50 are $25 (increase) and $10 (decrease). If the coefficient were to change from $50 to $60, the optimal value of the objective function would not change.
سؤال
Suppose the allowable increase and decrease for shadow price for a constraint are $25 (increase) and $10 (decrease). If the right hand side of that constraint were to increase by $10, the optimal value of the objective function would change.
سؤال
A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the decision variables in this problem?<div style=padding-top: 35px> Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the decision variables in this problem?<div style=padding-top: 35px> The company's goal is to maximize the revenue obtained from selling units during the next two months.
What are the decision variables in this problem?
سؤال
Linear programming is a subset of a larger class of models called:

A) mathematical programming models
B) mathematical optimality models
C) linear regression models
D) linear simplex models
سؤال
(A) Determine how to minimize the cost of meeting the demand for the next three weeks.
(B) Revise the model in (A) so that the demands are of the form (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> , where (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> is the original demand in month t, k is a factor, and (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> 's. For example, try this when (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> = 2, (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> = 5, and (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> = 3. Describe the behavior you observe in the table. Can you find any "reasonable" (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3?<div style=padding-top: 35px> 's that induce positive production levels in week 3?
سؤال
It is often useful to perform sensitivity analysis to see how, or if, the optimal solution to a linear programming problem changes as we change one or more model inputs.
سؤال
Shadow prices are associated with nonbinding constraints, and show the change in the optimal objective function value when the right side of the constraint equation changes by one unit.
سؤال
(A) Verify that Mary should purchase 12 units of food 2 each day and thus oversatisfy the vitamin C requirement by 6 units.

(B) Mary's husband has put his foot down and demanded that Mary fulfill the family's daily nutritional requirement exactly by obtaining precisely 12 units of vitamin A and 6 units of vitamin C. The optimal solution to the new problem will involve ingesting less vitamin C, but it will be more expensive, why?

(C) Starting with the optimal solution to (B), use the SolverTable add-in to see what happens to the total cost when the vitamin A and vitamin C requirements both vary (independently) from 3 to 18 in 3-unit increments. That is, from a two-way table. Describe the behavior you observe. In particular, are the changes in total cost the same as you look across each row of the table? Are they the same as you look across each column of the table?
سؤال
In using Excel® to solve linear programming problems, the decision variable cells represent the:

A) value of the objective function
B) constraints
C) decision variables
D) total cost of the model
سؤال
All optimization problems have:

A) an objective function and decision variables
B) an objective function and constraints
C) decision variables and constraints
D) an objective function, decision variables and constraints
سؤال
There is often more than one objective in linear programming problems.
سؤال
Every linear programming problem involves optimizing a:

A) linear regression model subject to several linear constraints
B) linear function subject to several linear constraints
C) linear function subject to several non-linear constraints
D) non-linear function subject to several linear constraints
سؤال
When formulating a linear programming spreadsheet model, there is one target (objective) cell that contains the value of the objective function.
سؤال
A chemical manufacturer produces two products, chemical X and chemical Y. Each product is manufactured by a two-step process that involves blending and mixing in machine A and packaging on machine B. Chemical X provides a $60/unit contribution to profit, while Chemical Y provides a $50 contribution to profit. The processing times for the two products on the mixing machine (A) and the packaging machine (B) are as follows: A chemical manufacturer produces two products, chemical X and chemical Y. Each product is manufactured by a two-step process that involves blending and mixing in machine A and packaging on machine B. Chemical X provides a $60/unit contribution to profit, while Chemical Y provides a $50 contribution to profit. The processing times for the two products on the mixing machine (A) and the packaging machine (B) are as follows:   For the upcoming two-week period, machine A has available 80 hours and machine B has available 60 hours of processing time. Forecasts of the markets indicate that the manufacturer can expect to sell a maximum of 16 units of chemical X and 18 units of chemical Y. What are the decision variables in this problem?<div style=padding-top: 35px> For the upcoming two-week period, machine A has available 80 hours and machine B has available 60 hours of processing time. Forecasts of the markets indicate that the manufacturer can expect to sell a maximum of 16 units of chemical X and 18 units of chemical Y.
What are the decision variables in this problem?
سؤال
Adam Enterprises manufactures two products. Each product can be produced on either of two machines. The time (in hours) required to make each product on each machine is shown below: Adam Enterprises manufactures two products. Each product can be produced on either of two machines. The time (in hours) required to make each product on each machine is shown below:   Each month, 500 hours of time are available on each machine, and also customers are willing to buy up to the quantities of each product at the prices shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. (A) Determine how the company can meet its goal. Assume that Adam will not produce any units in either month that it cannot sell in that month. (B) Referring to (A), suppose Adam wants to see what will happen if customer demands for each product in each month simultaneously change by a factor 1 + k. Revise the model so that you can use the SolverTable add-in to investigate the effect of this change on total revenue as k varies from -0.3 to 0.3 in increments of 0.1. Does revenue change in a linear manner over this range? Can you explain intuitively why it changes in the way it does?<div style=padding-top: 35px> Each month, 500 hours of time are available on each machine, and also customers are willing to buy up to the quantities of each product at the prices shown below: Adam Enterprises manufactures two products. Each product can be produced on either of two machines. The time (in hours) required to make each product on each machine is shown below:   Each month, 500 hours of time are available on each machine, and also customers are willing to buy up to the quantities of each product at the prices shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. (A) Determine how the company can meet its goal. Assume that Adam will not produce any units in either month that it cannot sell in that month. (B) Referring to (A), suppose Adam wants to see what will happen if customer demands for each product in each month simultaneously change by a factor 1 + k. Revise the model so that you can use the SolverTable add-in to investigate the effect of this change on total revenue as k varies from -0.3 to 0.3 in increments of 0.1. Does revenue change in a linear manner over this range? Can you explain intuitively why it changes in the way it does?<div style=padding-top: 35px> The company's goal is to maximize the revenue obtained from selling units during the next two months.
(A) Determine how the company can meet its goal. Assume that Adam will not produce any units in either month that it cannot sell in that month.
(B) Referring to (A), suppose Adam wants to see what will happen if customer demands for each product in each month simultaneously change by a factor 1 + k. Revise the model so that you can use the SolverTable add-in to investigate the effect of this change on total revenue as k varies from -0.3 to 0.3 in increments of 0.1. Does revenue change in a linear manner over this range? Can you explain intuitively why it changes in the way it does?
سؤال
It is instructive to look at a graphical solution procedure for LP models with three or more decision variables.
سؤال
Write out an algebraic expression for the objective function in this problem.
سؤال
There are generally two steps in solving an optimization problem: model development and optimization.
سؤال
When using the graphical solution method to solve linear programming problems, the set of points that satisfy all constraints is called the:

A) optimal region
B) feasible region
C) constrained region
D) logical region
سؤال
When formulating a linear programming spreadsheet model, there is a set of designated cells that play the role of the decision variables. These are called the objective cells.
سؤال
All linear programming problems should have a unique solution, if they can be solved.
سؤال
The feasible region in all linear programming problems is bounded by:

A) corner points
B) hyperplanes
C) an objective line
D) all of these options
سؤال
In most cases, when solving linear programming problems, we want the decision variables to be:

A) equal to zero
B) nonnegative
C) nonpositive
D) continuous
سؤال
In an optimization model, there can only be one:

A) decision variable
B) constraint
C) objective function
D) shadow price
سؤال
The term nonnegativity refers to the condition in which the:

A) objective function cannot be less that zero
B) decision variables cannot be less than zero
C) right hand side of the constraints cannot be greater then zero
D) reduced cost cannot be less than zero
سؤال
The most important solution method for linear programming problems is known as the:

A) spreadsheet method
B) solution mix method
C) complex method
D) simplex method
سؤال
(A) Write out algebraic expressions for all of the constraints in this problem.
(B) Construct a graph of the feasible region for this problem, given the constraints you identified in (A).
(C) Describe how you would find the location of the optimal solution in the feasible region you graphed in (B).
(D) Use the procedure you described in (C) to identify the optimal production plan. Confirm your solution using Solver. What is the maximized profit?
(E) What constraints are binding on the optimal solution? Use your graphical solution to explain your answer.
سؤال
All optimization problems include decision variables, an objective function, and constraints.
سؤال
Binding constraints are constraints that hold as an equality.​
سؤال
Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:

A) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
B) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
C) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
D) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
سؤال
If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:

A) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
B) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
C) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
D) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
سؤال
In general, the complete solution of a linear programming problem involves three stages: formulating the model, invoking Solver to find the optimal solution, and performing sensitivity analysis.
سؤال
The solution of a linear programming problem using Excel® typically involves the following three stages:

A) formulating the problem, invoking Solver, and sensitivity analysis
B) formulating the problem, graphing the problem, and sensitivity analysis
C) designing the decision variable cells, the target cells, and the constraints
D) designing the inputs, the decision variable cells, and the outputs
سؤال
Nonbinding constraints will always have slack, which is the difference between the two sides of the inequality in the constraint equation.
سؤال
The feasible region in a graphical solution of a linear programming problem will appear as some type of polygon, with lines forming all sides.
سؤال
The optimal solution to any linear programming model is the:

A) maximum objective function line
B) minimum objective function line
C) corner point of a polygon
D) maximum or minimum of a parabola
سؤال
Linear programming problems can always be formulated algebraically, but not always on a spreadsheet.
سؤال
What is the equation of the line representing this constraint? <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)   <div style=padding-top: 35px>

A) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
B) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
C) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
D) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
سؤال
The optimal solution to any linear programming model is a corner point of a polygon.
سؤال
A linear programming problem with _____decision variable(s) can be solved by a graphical solution method.

A) two
B) three
C) four
D) five
سؤال
In determining the optimal solution to a linear programming problem graphically, if the objective is to maximize the objective, we pull the objective function line down until it contacts the feasible region.
سؤال
Suppose an objective function has the equation: Suppose an objective function has the equation:   . Then the slope of the objective function line is 2.<div style=padding-top: 35px> .
Then the slope of the objective function line is 2.
سؤال
There are two primary ways to formulate a linear programming problem: the traditional algebraic way and with spreadsheets.
سؤال
Suppose a constraint has this equation: Suppose a constraint has this equation:   Then the slope of the constraint line is -2.<div style=padding-top: 35px> Then the slope of the constraint line is -2.
سؤال
Suppose a company sells two different products, x and y, for net profits of $5 per unit and $10 per unit, respectively. The slope of the line representing the objective function is:

A) 0.5
B) -0.5
C) 2
D) -2
سؤال
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below: Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below:   What are the decision variables in this problem?<div style=padding-top: 35px>
What are the decision variables in this problem?
سؤال
The prototype linear programming problem is to select an optimal mix of products to produce to maximize profit. This type of problem is referred to as the:

A) product mix problem
B) production problem
C) product/process problem
D) product scheduling problem
سؤال
When formulating a linear programming spreadsheet model, we specify the constraints in a Solver dialog box, since Excel does not show the constraints directly.
سؤال
When the proportionality property of LP models is violated, we generally must use non-linear optimization.
سؤال
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below: Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below:   What are the constraints in this problem?<div style=padding-top: 35px>
What are the constraints in this problem?
سؤال
The additivity property of linear programming implies that the contribution of any decision variable to the objective is of/on the levels of the other decision variables.

A) dependent
B) independent
C) conditional
D) the sum
سؤال
The additivity property of LP models implies that the sum of the contributions from the various activities to a particular constraint equals the total contribution to that constraint.
سؤال
A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What is the objective function in this problem?<div style=padding-top: 35px> Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What is the objective function in this problem?<div style=padding-top: 35px> The company's goal is to maximize the revenue obtained from selling units during the next two months.
What is the objective function in this problem?
سؤال
What is the objective function in this problem?
سؤال
It helps to ensure that Solver can find a solution to a linear programming problem if the model is well-scaled, that is, if all of the numbers are of roughly the same magnitude.
سؤال
​A decision support system is a user-friendly system where an end user can enter inputs to a model and see outputs, but need not be concerned with technical details.
سؤال
A marketing research professor is conducting a telephone survey and needs to contact at least 160 wives, 140 husbands, 110 single adult males, and 120 single adult females. It costs $2 to make a daytime call and $4 (because of higher labor costs) to make an evening call. The table shown below lists the expected results. For example, 10% of all daytime calls are answered by a single male, and 15% of all evening calls are answered by a single female. Because of a limited staff, at most half of all phone calls can be evening calls. Determine how to minimize the cost of completing the survey. A marketing research professor is conducting a telephone survey and needs to contact at least 160 wives, 140 husbands, 110 single adult males, and 120 single adult females. It costs $2 to make a daytime call and $4 (because of higher labor costs) to make an evening call. The table shown below lists the expected results. For example, 10% of all daytime calls are answered by a single male, and 15% of all evening calls are answered by a single female. Because of a limited staff, at most half of all phone calls can be evening calls. Determine how to minimize the cost of completing the survey.   What are the decision variables in this problem?<div style=padding-top: 35px>
What are the decision variables in this problem?
سؤال
When there is a problem with Solver being able to find a solution, many times it is an indication of a(n):

A) older version of Excel®
B) nonlinear programming problem
C) problem that cannot be solved using linear programming
D) mistake in the formulation of the problem
سؤال
What are the decision variables in this problem?
سؤال
In some cases, a linear programming problem can be formulated such that the objective can become infinitely large (for a maximization problem) or infinitely small (for a minimization problem). This type of problem is said to be:

A) infeasible
B) inconsistent
C) unbounded
D) redundant
سؤال
The proportionality property of LP models means that if the level of any activity is multiplied by a constant factor, then the contribution of this activity to the objective function, or to any of the constraints in which the activity is involved, is multiplied by the same factor.
سؤال
A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the constraints in this problem?<div style=padding-top: 35px> Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the constraints in this problem?<div style=padding-top: 35px> The company's goal is to maximize the revenue obtained from selling units during the next two months.
What are the constraints in this problem?
سؤال
What are the constraints in this problem?
سؤال
The divisibility property of linear programming means that a solution can have both:

A) integer and noninteger levels of an activity
B) linear and nonlinear relationships
C) positive and negative values
D) revenue and cost information in the model
سؤال
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below: Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below:   What is the optimal shipping plan? What are the total costs in that case?<div style=padding-top: 35px>
What is the optimal shipping plan? What are the total costs in that case?
سؤال
What is the objective function in this problem?
سؤال
Linear programming models have three important properties: _____.

A) optimality, additivity, and sensitivity
B) optimality, linearity, and divisibility
C) divisibility, linearity, and nonnegativity
D) proportionality, additivity, and divisibility
سؤال
Find an optimal solution to the problem, assuming that the company will not produce any units in either month that it cannot sell in that month. What is the production plan, and what is the total revenue?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/97
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Introduction to Optimization Modeling
1
In using Excel® to solve linear programming problems, the objective cell represents the:

A) value of the objective function
B) constraints
C) decision variables
D) total cost of the model
value of the objective function
2
Reduced costs indicate how much the objective coefficient of a decision variable that is currently 0 or at its upper bound must change before that the value of that variable changes.
True
3
The set of all values of the decision variable cells that satisfy all constraints, not including the nonnegativity constraints, is called the feasible region.
False
4
(A) Determine how to minimize the total cost of meeting the next 3 quarters' demand. Assume that 1000 usable units are available at the beginning of quarter 1.

(B) Referring to (A), the company wants to know how much money it would be worth to decrease the percentage of unsuitable items and/or the percentage of items that spoil. Write a short report that provides relevant information. Base your report on two uses of the SolverTable add-in: one where the percentage of unsuitable items decreases and the percentage of items that spoil stays at 10%; and one where the percentage of unsuitable items stays at 20% and the percentage of items that spoil decreases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
5
The divisibility property of LP models simply means that we allow only integer levels of the activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
6
(A) Determine how to minimize the net cost incurred in meeting the demands for the next four months.
(B) Starting with the optimal solution to (A), use SolverTable add-in to see what happens to the decision variables and the total cost when the initial inventory varies from 0 (the implied value in (A)) to 100 in 10-units increments. How much lower would the total cost be if the company started with 10 units in inventory, rather than none? Would the same cost decrease occur for every 10-init increase in initial inventory?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
7
As related to sensitivity analysis in linear programming, when the profit increases with a unit increase in labor, this change in profit is referred to as the:

A) add-in price
B) sensitivity price
C) shadow price
D) additional profit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
8
(A) Find an optimal solution to the problem. What is the production plan, and what is the total revenue?
(B) Obtain a sensitivity report for the solution reported in (A). Which constraints are binding?
(C) What is the incremental contribution associated with adding an hour of assembly time? Over what range of increase is the marginal value valid?
(D) What is the value of additional capacity on the polisher? How much increase and decrease in this capacity is possible before a change occurs in the optimal production schedule?
(E) An advertising agency has devised a marketing plan for the Western Chassis Company that will increase the market for Deluxe chassis. The plan will increase demand by 75 Deluxe chassis per month at a cost of $100 per month. Should Western adopt the plan? Briefly explain why.
(F) Suppose that four more hours of chassis assembly time could be made available. How much would profit change?
(G) Suppose next that Western's marketing department proposes lowering the price for a standard chassis from $12 to $11.50 so that more can be sold (since there is slack under the demand constraint). Would the optimal solution change? Explain why, or why not.
(H) If Western could obtain 1,000 pounds more of raw material (steel or aluminum), which should it procure? How much should they be willing to pay per pound for the steel or aluminum? Explain your answer.
(I) In doing some contingency planning, Western thinks that the aging stamping machine will soon need to be taken down for repairs that could last 2 months and will cost $10,000. During that time, they can continue to operate by outsourcing the stamping at $2.50 per chassis (deluxe or standard), although the capacity will be reduced from 2,500 to 1,500. What will be the total cost to repair the stamping machine?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
9
A farmer in Egypt owns 50 acres of land. He is going to plant each acre with cotton or corn. Each acre planted with cotton yields $400 profit; each with corn yields $200 profit. The labor and fertilizer used for each acre are given in the table below. Resources available include 150 workers and 200 tons of fertilizer. A farmer in Egypt owns 50 acres of land. He is going to plant each acre with cotton or corn. Each acre planted with cotton yields $400 profit; each with corn yields $200 profit. The labor and fertilizer used for each acre are given in the table below. Resources available include 150 workers and 200 tons of fertilizer.   (A) Formulate a linear programming model that will enable the farmer to determine the number of acres that should be planted cotton and/or corn in order to maximize his profit. ​ (B) Find an optimal solution to the model in (A) and determine the maximum profit. ​ (C) Implement the model in (A) in Excel Solver and obtain an answer report. Which constraints are binding on the optimal solution? ​ (D) Obtain a sensitivity report for the model in (A). How much should the farmer be willing to pay for an additional worker? ​ (E) Suppose the farmer hires 10 additional workers. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Would his planting plan change? Explain your answer. ​ (F) Suppose the farmer now wants to hire 20 additional workers, instead of just 10. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Explain your answer.
(A) Formulate a linear programming model that will enable the farmer to determine the number of acres that should be planted cotton and/or corn in order to maximize his profit.

(B) Find an optimal solution to the model in (A) and determine the maximum profit.

(C) Implement the model in (A) in Excel Solver and obtain an answer report. Which constraints are binding on the optimal solution?

(D) Obtain a sensitivity report for the model in (A). How much should the farmer be willing to pay for an additional worker?

(E) Suppose the farmer hires 10 additional workers. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Would his planting plan change? Explain your answer.

(F) Suppose the farmer now wants to hire 20 additional workers, instead of just 10. Can you use the sensitivity analysis obtained for (D) to determine his expected profit? Explain your answer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
10
A shadow price indicates how much a company would pay for more of a scarce resource.​
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
11
Proportionality, additivity, and divisibility are three important properties that LP models possess that distinguish them from general mathematical programming models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
12
An efficient algorithm for finding the optimal solution in a linear programming model is the:

A) spreadsheet method
B) solution mix method
C) complex method
D) simplex method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
13
Suppose the allowable increase and decrease for an objective coefficient of a decision variable that has a current value of $50 are $25 (increase) and $10 (decrease). If the coefficient were to change from $50 to $60, the optimal value of the objective function would not change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
14
Suppose the allowable increase and decrease for shadow price for a constraint are $25 (increase) and $10 (decrease). If the right hand side of that constraint were to increase by $10, the optimal value of the objective function would change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
15
A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the decision variables in this problem? Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the decision variables in this problem? The company's goal is to maximize the revenue obtained from selling units during the next two months.
What are the decision variables in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
16
Linear programming is a subset of a larger class of models called:

A) mathematical programming models
B) mathematical optimality models
C) linear regression models
D) linear simplex models
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
17
(A) Determine how to minimize the cost of meeting the demand for the next three weeks.
(B) Revise the model in (A) so that the demands are of the form (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? , where (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? is the original demand in month t, k is a factor, and (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? 's. For example, try this when (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? = 2, (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? = 5, and (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? = 3. Describe the behavior you observe in the table. Can you find any "reasonable" (A) Determine how to minimize the cost of meeting the demand for the next three weeks. (B) Revise the model in (A) so that the demands are of the form   , where   is the original demand in month t, k is a factor, and   is an amount of change in month t. Formulate the model in such away that you can use the SolverTable add-in to analyze changes in the amounts produced and the total cost when k varies from 0 to 10 in 1-unit increments, for any fixed values of the   's. For example, try this when   = 2,   = 5, and   = 3. Describe the behavior you observe in the table. Can you find any reasonable   's that induce positive production levels in week 3? 's that induce positive production levels in week 3?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
18
It is often useful to perform sensitivity analysis to see how, or if, the optimal solution to a linear programming problem changes as we change one or more model inputs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
19
Shadow prices are associated with nonbinding constraints, and show the change in the optimal objective function value when the right side of the constraint equation changes by one unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
20
(A) Verify that Mary should purchase 12 units of food 2 each day and thus oversatisfy the vitamin C requirement by 6 units.

(B) Mary's husband has put his foot down and demanded that Mary fulfill the family's daily nutritional requirement exactly by obtaining precisely 12 units of vitamin A and 6 units of vitamin C. The optimal solution to the new problem will involve ingesting less vitamin C, but it will be more expensive, why?

(C) Starting with the optimal solution to (B), use the SolverTable add-in to see what happens to the total cost when the vitamin A and vitamin C requirements both vary (independently) from 3 to 18 in 3-unit increments. That is, from a two-way table. Describe the behavior you observe. In particular, are the changes in total cost the same as you look across each row of the table? Are they the same as you look across each column of the table?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
21
In using Excel® to solve linear programming problems, the decision variable cells represent the:

A) value of the objective function
B) constraints
C) decision variables
D) total cost of the model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
22
All optimization problems have:

A) an objective function and decision variables
B) an objective function and constraints
C) decision variables and constraints
D) an objective function, decision variables and constraints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
23
There is often more than one objective in linear programming problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
24
Every linear programming problem involves optimizing a:

A) linear regression model subject to several linear constraints
B) linear function subject to several linear constraints
C) linear function subject to several non-linear constraints
D) non-linear function subject to several linear constraints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
25
When formulating a linear programming spreadsheet model, there is one target (objective) cell that contains the value of the objective function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
26
A chemical manufacturer produces two products, chemical X and chemical Y. Each product is manufactured by a two-step process that involves blending and mixing in machine A and packaging on machine B. Chemical X provides a $60/unit contribution to profit, while Chemical Y provides a $50 contribution to profit. The processing times for the two products on the mixing machine (A) and the packaging machine (B) are as follows: A chemical manufacturer produces two products, chemical X and chemical Y. Each product is manufactured by a two-step process that involves blending and mixing in machine A and packaging on machine B. Chemical X provides a $60/unit contribution to profit, while Chemical Y provides a $50 contribution to profit. The processing times for the two products on the mixing machine (A) and the packaging machine (B) are as follows:   For the upcoming two-week period, machine A has available 80 hours and machine B has available 60 hours of processing time. Forecasts of the markets indicate that the manufacturer can expect to sell a maximum of 16 units of chemical X and 18 units of chemical Y. What are the decision variables in this problem? For the upcoming two-week period, machine A has available 80 hours and machine B has available 60 hours of processing time. Forecasts of the markets indicate that the manufacturer can expect to sell a maximum of 16 units of chemical X and 18 units of chemical Y.
What are the decision variables in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
27
Adam Enterprises manufactures two products. Each product can be produced on either of two machines. The time (in hours) required to make each product on each machine is shown below: Adam Enterprises manufactures two products. Each product can be produced on either of two machines. The time (in hours) required to make each product on each machine is shown below:   Each month, 500 hours of time are available on each machine, and also customers are willing to buy up to the quantities of each product at the prices shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. (A) Determine how the company can meet its goal. Assume that Adam will not produce any units in either month that it cannot sell in that month. (B) Referring to (A), suppose Adam wants to see what will happen if customer demands for each product in each month simultaneously change by a factor 1 + k. Revise the model so that you can use the SolverTable add-in to investigate the effect of this change on total revenue as k varies from -0.3 to 0.3 in increments of 0.1. Does revenue change in a linear manner over this range? Can you explain intuitively why it changes in the way it does? Each month, 500 hours of time are available on each machine, and also customers are willing to buy up to the quantities of each product at the prices shown below: Adam Enterprises manufactures two products. Each product can be produced on either of two machines. The time (in hours) required to make each product on each machine is shown below:   Each month, 500 hours of time are available on each machine, and also customers are willing to buy up to the quantities of each product at the prices shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. (A) Determine how the company can meet its goal. Assume that Adam will not produce any units in either month that it cannot sell in that month. (B) Referring to (A), suppose Adam wants to see what will happen if customer demands for each product in each month simultaneously change by a factor 1 + k. Revise the model so that you can use the SolverTable add-in to investigate the effect of this change on total revenue as k varies from -0.3 to 0.3 in increments of 0.1. Does revenue change in a linear manner over this range? Can you explain intuitively why it changes in the way it does? The company's goal is to maximize the revenue obtained from selling units during the next two months.
(A) Determine how the company can meet its goal. Assume that Adam will not produce any units in either month that it cannot sell in that month.
(B) Referring to (A), suppose Adam wants to see what will happen if customer demands for each product in each month simultaneously change by a factor 1 + k. Revise the model so that you can use the SolverTable add-in to investigate the effect of this change on total revenue as k varies from -0.3 to 0.3 in increments of 0.1. Does revenue change in a linear manner over this range? Can you explain intuitively why it changes in the way it does?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
28
It is instructive to look at a graphical solution procedure for LP models with three or more decision variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
29
Write out an algebraic expression for the objective function in this problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
30
There are generally two steps in solving an optimization problem: model development and optimization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
31
When using the graphical solution method to solve linear programming problems, the set of points that satisfy all constraints is called the:

A) optimal region
B) feasible region
C) constrained region
D) logical region
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
32
When formulating a linear programming spreadsheet model, there is a set of designated cells that play the role of the decision variables. These are called the objective cells.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
33
All linear programming problems should have a unique solution, if they can be solved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
34
The feasible region in all linear programming problems is bounded by:

A) corner points
B) hyperplanes
C) an objective line
D) all of these options
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
35
In most cases, when solving linear programming problems, we want the decision variables to be:

A) equal to zero
B) nonnegative
C) nonpositive
D) continuous
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
36
In an optimization model, there can only be one:

A) decision variable
B) constraint
C) objective function
D) shadow price
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
37
The term nonnegativity refers to the condition in which the:

A) objective function cannot be less that zero
B) decision variables cannot be less than zero
C) right hand side of the constraints cannot be greater then zero
D) reduced cost cannot be less than zero
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
38
The most important solution method for linear programming problems is known as the:

A) spreadsheet method
B) solution mix method
C) complex method
D) simplex method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
39
(A) Write out algebraic expressions for all of the constraints in this problem.
(B) Construct a graph of the feasible region for this problem, given the constraints you identified in (A).
(C) Describe how you would find the location of the optimal solution in the feasible region you graphed in (B).
(D) Use the procedure you described in (C) to identify the optimal production plan. Confirm your solution using Solver. What is the maximized profit?
(E) What constraints are binding on the optimal solution? Use your graphical solution to explain your answer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
40
All optimization problems include decision variables, an objective function, and constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
41
Binding constraints are constraints that hold as an equality.​
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
42
Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:

A) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)
B) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)
C) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)
D) <strong>Suppose a firm must at least meet minimum expected demands of 60 for product x and 80 of product y. An algebraic formulation of these constraints is:</strong> A)   B)   C)   D)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
43
If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:

A) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)
B) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)
C) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)
D) <strong>If a manufacturing process takes 3 hours per unit of x and 5 hours per unit of y and a maximum of 100 hours of manufacturing process time are available, then an algebraic formulation of this constraint is:</strong> A)   B)   C)   D)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
44
In general, the complete solution of a linear programming problem involves three stages: formulating the model, invoking Solver to find the optimal solution, and performing sensitivity analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
45
The solution of a linear programming problem using Excel® typically involves the following three stages:

A) formulating the problem, invoking Solver, and sensitivity analysis
B) formulating the problem, graphing the problem, and sensitivity analysis
C) designing the decision variable cells, the target cells, and the constraints
D) designing the inputs, the decision variable cells, and the outputs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
46
Nonbinding constraints will always have slack, which is the difference between the two sides of the inequality in the constraint equation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
47
The feasible region in a graphical solution of a linear programming problem will appear as some type of polygon, with lines forming all sides.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
48
The optimal solution to any linear programming model is the:

A) maximum objective function line
B) minimum objective function line
C) corner point of a polygon
D) maximum or minimum of a parabola
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
49
Linear programming problems can always be formulated algebraically, but not always on a spreadsheet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
50
What is the equation of the line representing this constraint? <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)

A) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)
B) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)
C) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)
D) <strong>What is the equation of the line representing this constraint?   ​</strong> A)   B)   C)   D)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
51
The optimal solution to any linear programming model is a corner point of a polygon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
52
A linear programming problem with _____decision variable(s) can be solved by a graphical solution method.

A) two
B) three
C) four
D) five
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
53
In determining the optimal solution to a linear programming problem graphically, if the objective is to maximize the objective, we pull the objective function line down until it contacts the feasible region.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
54
Suppose an objective function has the equation: Suppose an objective function has the equation:   . Then the slope of the objective function line is 2. .
Then the slope of the objective function line is 2.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
55
There are two primary ways to formulate a linear programming problem: the traditional algebraic way and with spreadsheets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
56
Suppose a constraint has this equation: Suppose a constraint has this equation:   Then the slope of the constraint line is -2. Then the slope of the constraint line is -2.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
57
Suppose a company sells two different products, x and y, for net profits of $5 per unit and $10 per unit, respectively. The slope of the line representing the objective function is:

A) 0.5
B) -0.5
C) 2
D) -2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
58
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below: Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below:   What are the decision variables in this problem?
What are the decision variables in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
59
The prototype linear programming problem is to select an optimal mix of products to produce to maximize profit. This type of problem is referred to as the:

A) product mix problem
B) production problem
C) product/process problem
D) product scheduling problem
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
60
When formulating a linear programming spreadsheet model, we specify the constraints in a Solver dialog box, since Excel does not show the constraints directly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
61
When the proportionality property of LP models is violated, we generally must use non-linear optimization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
62
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below: Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below:   What are the constraints in this problem?
What are the constraints in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
63
The additivity property of linear programming implies that the contribution of any decision variable to the objective is of/on the levels of the other decision variables.

A) dependent
B) independent
C) conditional
D) the sum
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
64
The additivity property of LP models implies that the sum of the contributions from the various activities to a particular constraint equals the total contribution to that constraint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
65
A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What is the objective function in this problem? Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What is the objective function in this problem? The company's goal is to maximize the revenue obtained from selling units during the next two months.
What is the objective function in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
66
What is the objective function in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
67
It helps to ensure that Solver can find a solution to a linear programming problem if the model is well-scaled, that is, if all of the numbers are of roughly the same magnitude.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
68
​A decision support system is a user-friendly system where an end user can enter inputs to a model and see outputs, but need not be concerned with technical details.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
69
A marketing research professor is conducting a telephone survey and needs to contact at least 160 wives, 140 husbands, 110 single adult males, and 120 single adult females. It costs $2 to make a daytime call and $4 (because of higher labor costs) to make an evening call. The table shown below lists the expected results. For example, 10% of all daytime calls are answered by a single male, and 15% of all evening calls are answered by a single female. Because of a limited staff, at most half of all phone calls can be evening calls. Determine how to minimize the cost of completing the survey. A marketing research professor is conducting a telephone survey and needs to contact at least 160 wives, 140 husbands, 110 single adult males, and 120 single adult females. It costs $2 to make a daytime call and $4 (because of higher labor costs) to make an evening call. The table shown below lists the expected results. For example, 10% of all daytime calls are answered by a single male, and 15% of all evening calls are answered by a single female. Because of a limited staff, at most half of all phone calls can be evening calls. Determine how to minimize the cost of completing the survey.   What are the decision variables in this problem?
What are the decision variables in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
70
When there is a problem with Solver being able to find a solution, many times it is an indication of a(n):

A) older version of Excel®
B) nonlinear programming problem
C) problem that cannot be solved using linear programming
D) mistake in the formulation of the problem
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
71
What are the decision variables in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
72
In some cases, a linear programming problem can be formulated such that the objective can become infinitely large (for a maximization problem) or infinitely small (for a minimization problem). This type of problem is said to be:

A) infeasible
B) inconsistent
C) unbounded
D) redundant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
73
The proportionality property of LP models means that if the level of any activity is multiplied by a constant factor, then the contribution of this activity to the objective function, or to any of the constraints in which the activity is involved, is multiplied by the same factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
74
A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the constraints in this problem? Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below: A company produces two products. Each product can be produced on either of two machines. The time (in hours) required to produce each product on each machine is shown below:   Each month, 600 hours of time are available on each machine, and that customers are willing to buy up to the quantities of each product at the prices that are shown below:   The company's goal is to maximize the revenue obtained from selling units during the next two months. What are the constraints in this problem? The company's goal is to maximize the revenue obtained from selling units during the next two months.
What are the constraints in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
75
What are the constraints in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
76
The divisibility property of linear programming means that a solution can have both:

A) integer and noninteger levels of an activity
B) linear and nonlinear relationships
C) positive and negative values
D) revenue and cost information in the model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
77
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below: Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant, which produces 5000 tons per month, and the Lakeview plant, which can produce 7000 tons per month. Sinclair sells its polyethylene to three different GM auto plants: Grand Rapids (demand = 3000 tons per month), Blue Ridge (demand = 5000 tons per month), and Sunset (demand = 4000 tons per month). The costs of shipping between the respective plants is shown in the table below:   What is the optimal shipping plan? What are the total costs in that case?
What is the optimal shipping plan? What are the total costs in that case?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
78
What is the objective function in this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
79
Linear programming models have three important properties: _____.

A) optimality, additivity, and sensitivity
B) optimality, linearity, and divisibility
C) divisibility, linearity, and nonnegativity
D) proportionality, additivity, and divisibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
80
Find an optimal solution to the problem, assuming that the company will not produce any units in either month that it cannot sell in that month. What is the production plan, and what is the total revenue?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 97 في هذه المجموعة.